| description | Estimate construction cost (CapEx and annual OpEx delta) for a decarbonization measure or a full measure roster, emitting the `measure.cost` object consumed by `decarb-plan` measure screening and read by `quality-review`. Handles fuel-switch / electrification measures with an explicit electrical service-capacity model (demand increase, headroom-vs-new-service UNVERIFIED range, never a collapsed point estimate) and always pairs a fuel-switch measure with a non-switching `efficiency_alternative`. Triggers on: "estimate construction cost", "what's the CapEx for", "cost this measure", "cost this roster", "how much would this retrofit cost", "electrical service upgrade cost".
|
| version | 1.0.0 |
Construction Costing
You are estimating construction cost for one or more decarbonization measures — the
capex (low/base/high) and opex_delta_yr (annual OpEx change, positive = OpEx rises,
negative = OpEx falls) that feed the decarb-plan measure-screening economics, and that
quality-review reads back when auditing a plan. This skill does not invent numbers: every
base capex and opex_delta_yr comes from the seeded lookup table in
references/cost-bases.md, keyed by archetype, climate, and size — not from LLM
estimation or memory of "typical" retrofit costs.
Positioning: construction-costing is a narrow, mechanical costing method, not a full
economic-feasibility engine. It produces the measure.cost object; decarb-plan owns the
downstream NPV/IRR/payback math and landlord-share capture logic. Do not compute IRR or
discounted paybacks here — that belongs to the plan's economics step, which consumes this
skill's output.
Ground rules
- No invented cost figures. Every capex/opex number traces to a row in
references/cost-bases.md or the electrical service-capacity $/kW curve in that same
file. If a measure has no matching row (archetype/climate/size combination not covered),
say so explicitly and flag it for a human to add a row — do not guess a number to fill the
gap.
- cost-bases.md is seeded and provisional. Every dollar figure in that reference file is a
PLACEHOLDER pending tuning by Christopher against real bids and utility tariffs. When you
report a cost estimate to a user, note that the underlying basis is a seeded default, not a
verified market price — never present these numbers as authoritative pricing.
opex_delta_yr sign convention is fixed: positive means OpEx rises (e.g., more
expensive electricity displacing cheap gas), negative means OpEx falls. Never flip this
sign when composing or comparing measures.
- Electrical service capacity is never guessed away. Any fuel-switch / electrification
measure that increases electrical demand must carry an explicit electrical service capacity
assessment. When the actual service capacity is unknown, the upgrade cost is an honest
range, and it must never collapse to a point estimate — see Step 3.
- Every fuel-switch measure gets a non-switching sibling. Any
measure_kind: fuel_switch
row must also emit an efficiency_alternative — the standard high-efficiency,
non-fuel-switching option (e.g., a condensing boiler instead of an ASHP plant) — so the plan
can screen "switch fuels" against "just get more efficient at the same fuel."
- Validate before handing off. Every
measure.cost object this method emits must validate
against skills/construction-costing/schema/measure-cost.schema.json via
node scripts/validate-measure-cost.mjs before it is considered done.
Method
Step 1: Load the measure roster and the Audette model
Read the measure roster for the engagement (the candidate list produced upstream by
decarb-plan's measure generation) and the corresponding Audette building model, specifically:
end-use energy breakdown, peak electrical demand by end use, and — where available — existing
electrical service capacity (panel schedule, service entrance rating, or utility
interconnection headroom). If the roster or model is missing required fields (e.g., no peak
demand data for a candidate fuel-switch measure), flag it rather than filling the gap with an
assumption.
Step 2: Look up the parametric base per measure
For each measure, determine its archetype (multifamily, office, lab, mixed_use),
climate zone band (cold, mixed, hot), and building size band (small, mid,
large), then look up the matching row in references/cost-bases.md. That row gives you
capex {low, base, high} and opex_delta_yr (again: positive = OpEx rises) scaled to a
reference building size — scale linearly by GSF or unit count relative to that reference unless
the table notes a different unit basis (e.g., "per 100 hoods" for fume-hood VAV).
If no row matches the archetype × climate × size combination, do not extrapolate silently from
an unrelated row — surface the gap explicitly (e.g., "no cost-bases.md row for lab × hot ×
large; using the nearest mixed climate row as an approximation, flagged for review").
Step 3: Fuel-switch / electrification measures — the electrical service capacity model
For any measure that switches fuel (e.g., gas boiler → ASHP, gas furnace → VRF):
- Compute
demand_increase_kw — the delta between the new electrified end-use's peak
electrical demand and the existing electrical peak demand at that panel/service entrance,
from the Audette model.
- Check whether actual electrical service capacity is known for this building
(
service_capacity_known: true/false):
- Known (a real electrical survey, panel schedule, or interconnection study confirms
available headroom): emit a point
upgrade_cost (the single confirmed cost, which may
be $0 if headroom covers the increase, or the confirmed upgrade quote otherwise) and
flag: 'VERIFIED'.
- Unknown: emit a range —
upgrade_cost.low = 0 (best case: assume existing service
has enough headroom, no service upgrade required) and upgrade_cost.high = the full new
electrical service cost, computed from the $/kW (or $/A) parametric curve in
references/cost-bases.md Section 5.1 as demand_increase_kw × region_$/kW. Set
flag: 'UNVERIFIED'.
- Never collapse an
UNVERIFIED range to a point estimate — e.g., never average
low/high into a single number, and never silently pick high (or low) as "the" cost
when capacity is unknown. The range itself communicates real risk to the plan's economics
step and to quality-review; collapsing it hides that risk.
Step 4: Always emit the efficiency alternative
For every fuel-switch measure, also produce the standard non-switching, high-efficiency
option at the same archetype/climate/size (e.g., a condensing boiler replacement instead of an
ASHP plant conversion — see references/cost-bases.md Section 3 for the boiler-replacement
rows that pair with Section 2's electrification rows). Emit it as the efficiency_alternative
object with its own capex (a single number — the alternative's base estimate, not a
low/base/high spread) and its own opex_delta_yr. This lets the downstream plan compare
"switch fuels" against "stay on the same fuel but get more efficient" on equal footing.
Non-fuel-switch measures (LED, DCV, fume-hood VAV, chiller optimization, envelope) do not need
an efficiency_alternative — they already are the efficiency option.
Step 5: Emit the measure.cost object and validate
Assemble the full measure.cost object per measure, matching the shape defined in
schema/measure-cost.schema.json:
{
"measure_id": "central-ashp",
"measure_kind": "fuel_switch",
"cost": {
"capex": { "low": 1400000, "base": 2100000, "high": 3200000 },
"opex_delta_yr": 48000,
"electrical_capacity": {
"demand_increase_kw": 420,
"service_capacity_known": false,
"upgrade_cost": { "low": 0, "high": 1800000 },
"flag": "UNVERIFIED"
Non-fuel-switch measures omit electrical_capacity and efficiency_alternative entirely (see
skills/construction-costing/example-data.json's led-upgrade entry for the minimal shape).
Before handing the roster's measure.cost objects downstream, validate them by running:
node scripts/validate-measure-cost.mjs
This checks the JSON Schema shape and the contract rules beyond the schema — notably that
every fuel_switch measure has both electrical_capacity and efficiency_alternative, and
that an UNVERIFIED electrical capacity never has upgrade_cost.low === upgrade_cost.high
(i.e., it is never a disguised point estimate). Fix any measure that fails validation before
proceeding — do not hand an invalid measure.cost object downstream.
Step 6: Hand off
The measure.cost objects this method produces are consumed by decarb-plan's measure
screening step (which combines them with energy-savings estimates to compute NPV/IRR/payback,
applying landlord-share capture separately) and are read by quality-review when auditing a
plan's cost basis for defensibility. This skill's job ends at producing a validated
measure.cost per schema/measure-cost.schema.json — it does not itself rank, screen, or
render measures.