Skip to main content

costing

Orchestrate the soapbox-costing MCP's 9 tools into a validated `measure.cost` object per decarbonization measure — CapEx (low/base/high), annual OpEx delta, electrical service-capacity headroom for fuel-switch measures, and a non-switching efficiency alternative — with every figure traceable to a cited reference. Triggers on: "cost this measure", "cost this roster", "what's the CapEx for", "estimate construction cost", "how much would this retrofit cost", "electrical service upgrade cost". Does not compute NPV/IRR/payback — that's `decarb-plan`.

Jump to install

Source facts

Repository
soapboxbuild/soapbox-costing
Last source activity
July 11, 2026 at 01:34
Detected SKILL.md language
English
Stars
0
Forks
0

Install options

The review-first prompt is selected by default. You can switch to a direct command or download a local copy.

Review the source files

Read SKILL.md and any companion files shown by SkillsMP before deciding whether to install.