Before committing to a plan or launch, assume it already failed and reason backward through concrete causes — convert failure paths into mitigations, gates, and stop checks.

Jump to install

Source facts

Repository
tjboudreaux/cc-thinking-skills
Last source activity
July 17, 2026 at 01:39
Detected SKILL.md language
English
Stars
1,333
Forks
161

Install options

The review-first prompt is selected by default. You can switch to a direct command or download a local copy.

Review the source files

Read SKILL.md and any companion files shown by SkillsMP before deciding whether to install.

Showing SKILL.md

SKILL.md
Source instructions · Read-only preview
name
thinking-pre-mortem
description
Before committing to a plan or launch, assume it already failed and reason backward through concrete causes — convert failure paths into mitigations, gates, and stop checks.
disable-model-invocation
true
# Pre-Mortem Analysis **Core rule:** Prospective hindsight beats "what could go wrong?" Assume the plan has already failed (past tense), generate concrete failure paths, reverse them into prevention requirements, and bind each top path to a verifiable plan change. ## When to Use - Before kickoff, major technical commitment, high-risk sprint work, launch, or release. - After a plan looks solid but before execution, especially when optimism or overconfidence is likely. - When a decision is costly to reverse and risks are still implicit rather than enforced. ## When NOT to Use - Work is small, local, and cheaply reversible — skip the ceremony. - You are mid-incident under time pressure — act now (OODA / scientific method); pre-mortem is pre-execution. - You would only emit generic risks ("scope creep", "requirements unclear") that do not bind to this plan. - Risks are already enforced by live gates (CI, canary, rollback, alerts) with no residual unlisted path. - A mature risk register already covers the same specific failure paths with owners and checks. ## Procedure 1. **Set the failure frame in past tense:** "It is [post-deadline date]. The plan failed: [rollback / data loss / no adoption / SLA breach]." Explaining a happened failure is required; predicting one is not enough. 2. **Generate failure reasons before filtering:** sweep technical, process, assumptions, dependencies/external, and people. Force a second pass: "What did the plan most need to be true that was not?" Collect breadth first (aim for many distinct reasons); do not rank mid-sweep. 3. **Prioritize:** group by theme; score likelihood × impact; keep the top 3–5 concrete risks (drop generics that do not bind). 4. **Failure-first reverse analysis (absorbed reverse path):** for each top risk, (a) restate the failed outcome in past tense, (b) list **necessary/enabling conditions** that had to be true for that failure, (c) **invert** each condition into a verifiable prevention requirement (avoid/require rule + check), (d) bind **owner, verification checkpoint, and ship/stage gate**. 5. **Mitigate and update the plan:** for each top risk, attach mitigation steps, spike/contingency if needed, and the reverse-analysis prevention requirements as explicit plan gates. A pre-mortem with no plan change is incomplete. 6. **Stop when** top risks each have a bound mitigation or prevention gate, or when further reasons are only generic restatements — then ship the updated plan, do not keep brainstorming. ## Output 1. **Failure scenario** — past-tense disaster frame with date and failed outcome. 2. **Failure reasons** — unfiltered list, then prioritized top 3–5 with likelihood × impact. 3. **Reverse paths** — for each top risk: necessary conditions → inverted prevention requirements. 4. **Mitigations** — owner, verification checkpoint, ship/stage gate per top risk. 5. **Plan deltas** — concrete tasks, spikes, contingencies, and gates added to the plan. ## Verification - **Falsify/stop:** if no plan-specific failure path can be stated in past tense with necessary conditions, stop — you are generating theater, not risk. If a "mitigation" has no verification checkpoint, it is not done. - **Over-application guard:** do not pre-mortem reversible chores, mid-incident firefighting, or systems that already enforce the same paths. Do not leave abstract risks as "mitigate later"; either invert them into gates or drop them as non-actionable.