build-parallelism

Optimize MSBuild multi-project scheduling with max CPU count, graph build analysis, and dependency graph cleanup.

Source facts

Repository
visionarycoder/vc.Ifx
Last source activity
September 10, 2026 at 04:35
Detected SKILL.md language
English
Stars
0
Forks
0

Install options

The review-first prompt is selected by default. You can switch to a direct command or download a local copy.

Review the source files

Read SKILL.md and any companion files shown by SkillsMP before deciding whether to install.

Showing SKILL.md

SKILL.md
Source instructions · Read-only preview
name
build-parallelism
title
Build Parallelism
description
Optimize MSBuild multi-project scheduling with max CPU count, graph build analysis, and dependency graph cleanup.
doc_type
skill
status
active
last_updated
2026-07-29T00:00:00.000Z
target_audience
ai
complexity
medium
estimated_tokens
1210
prerequisites
["build-perf-baseline","ste-agent-writing-standard","terminology-dictionary"]
related_skills
["build-perf-diagnostics","incremental-build"]
appliesTo
**/*.{csproj,sln,slnx,props,targets,binlog}
tags
["msbuild","parallelism","build","performance","scheduling"]
# Build Parallelism Agent improves wall clock time by increasing useful parallel work across the MSBuild project graph. ## When to Use Agent uses this skill when: - Multi-project builds leave CPU capacity idle - `-m` gives little or no benefit - User wants graph-build or scheduling guidance - Build time is dominated by graph shape rather than one slow task ## When Not to Use Agent does not use this skill when: - Build scope is one project with no graph breadth - Primary issue is broken incremental skipping - Primary issue is one slow compile or analyzer step inside one project ## Required Inputs | Input | Required | Notes | |---|---|---| | Build scope | Yes | Solution, solution filter, or multi-project entry point | | Current command | Yes | Existing build command and `-m` usage | | Binlog or replay log | No | Helpful for proving node utilization and critical path | | Constraints | No | CI limits, toolchain limits, or graph-mode restrictions | ## Diagnostic Workflow | Step | Agent action | Test | Pass | |---|---|---|---| | 1. Confirm graph scope | Agent verifies that the build includes parallelizable projects | Agent lists the participating projects or solutions | Graph contains independent branches | | 2. Confirm worker settings | Agent checks `/maxcpucount` or `-m` usage | Agent inspects the command line | Parallel worker count exceeds 1 | | 3. Measure scheduling | Agent compares wall clock to total project time and node activity | Agent reads binlog or replay evidence | Build shows either good overlap or a clear serial bottleneck | | 4. Fix graph or command | Agent applies `-m`, `/graph`, `BuildInParallel`, or dependency cleanup | Agent ties change to the observed limit | Change targets the real bottleneck | | 5. Verify | Agent reruns the same build scope | Agent compares wall clock and project overlap | Wall clock improves or the graph limit is proven structural | ## Decision Matrix | Evidence | Agent uses | Expected result | |---|---|---| | Command runs with one worker | `-m` or `/maxcpucount` | More concurrent project builds | | Many projects evaluate redundantly | `/graph` | Better scheduling and fewer redundant evaluations | | Custom `MSBuild` task batches sequentially | `BuildInParallel="true"` | More concurrency inside custom orchestration | | One project exists only for build order | `ReferenceOutputAssembly="false"` or dependency cleanup | Shorter critical path | | Only a subset matters | `.slnf` or narrower entry point | Less unnecessary graph work | ## Diagnostic Signals | Signal | Interpretation | |---|---| | Wall clock is close to sum of project times | Graph is mostly serial or one project dominates | | Slowest project dwarfs all others | Critical path optimization matters more than extra workers | | Idle nodes appear while one project runs | Dependency chain or custom target serialization exists | | `/graph` is unavailable because references are dynamic | Project discovery pattern limits graph scheduling | ## Validation | Check | Test | Pass | |---|---|---| | Worker use | Agent reruns with `-m` | Multiple worker nodes appear in evidence | | Scheduling gain | Agent compares wall clock before and after | Wall clock drops measurably for the same scope | | Graph correctness | Agent confirms graph mode works with existing references | Build succeeds without dynamic-reference regressions | | Critical-path proof | Agent reports whether one project still dominates | Remaining limit is explicit rather than guessed | ## Common Pitfalls | Pitfall | Agent correction | |---|---| | Agent expects `-m` to help a single-project build | Agent treats that case as intra-project work, not graph work | | Agent adds workers without reading the critical path | Agent measures serial bottlenecks first | | Agent uses `/graph` on dynamic project discovery blindly | Agent confirms `ProjectReference`-driven graph compatibility | | Agent ignores custom `MSBuild` task serialization | Agent checks `BuildInParallel` where custom orchestration exists |