Skip to main content

production-schedule-explainer

Explain what the schedule can absorb, and what a change costs.

Jump to install

Source facts

Repository
vstorm-co/agenticos
Last source activity
September 2, 2026 at 09:15
Detected SKILL.md language
English
Stars
42
Forks
9

Install options

The review-first prompt is selected by default. You can switch to a direct command or download a local copy.

Review the source files

Read SKILL.md and any companion files shown by SkillsMP before deciding whether to install.

Showing SKILL.md

SKILL.md
Source instructions · Read-only preview
name
Production schedule explainer
description
Explain what the schedule can absorb, and what a change costs.
category
analytics
# Answering a scheduling question Sales asks "can we fit this in". The useful answer names what moves. ## Answer with the trade "Yes, and order 4471 moves from Thursday to Monday" or "no, not without overtime on Saturday". A yes with no consequence stated is how schedules become fiction. ## Check four constraints Machine capacity on the required process · material availability including lead time · tooling and changeover time · labour on that shift with the right skill. The constraint that binds is rarely the machine, and it is almost never the one the question assumed. ## Changeovers are the hidden cost Inserting a job between two of the same family may cost two changeovers rather than none. Say the setup time, because it is invisible in the order book and it is where the capacity went. ## Always state The knock-on: which orders move, whether any goes past its promised date, and whether the customer has been told. ## Never Promise a date without checking material, or absorb a rush job by silently moving another customer's order.
View on GitHub