Skip to main content

workover-rig-operator

Use when a task needs the judgment of a Workover Rig Operator — deciding whether a "dead" well is actually dead before breaking a connection, computing kill-weight fluid for a trapped-pressure well, judging when a stuck tubing/rod string has hit its safe overpull limit versus needs fishing tools, reconciling a tubing tally against expected plug or perforation depth, or sequencing a pulling-unit job (rig-up, BOP test, pull, swab, kill) around well-control and line-of-fire hazards.

Jump to install

Source facts

Repository
wonsukchoi/domain-experts
Last source activity
July 14, 2026 at 07:14
Detected SKILL.md language
English
Stars
13
Forks
2

Install options

The review-first prompt is selected by default. You can switch to a direct command or download a local copy.

Review the source files

Read SKILL.md and any companion files shown by SkillsMP before deciding whether to install.