Task Planning
When to Use This Skill
Load this skill when:
- Creating an implementation plan from feature requirements (Planner agent)
- Revising a plan after critic feedback (Planner agent, revision mode)
- Validating a plan's structure before approving it (Coordinator)
- Checking plan integrity (dependency cycles, missing criteria)
DAG Decomposition Methodology
Step 1: Identify Atomic Deliverables
Decompose the feature into the smallest independently testable units of work. Each task must be a deliverable, not a module or abstraction.
Good task titles (deliverable-focused):
- "Add search API endpoint returning paginated results"
- "Create user profile page with avatar upload"
- "Implement rate limiting middleware for public endpoints"
Bad task titles (module/abstraction-focused):
- "Create SearchHandler class"
- "Set up database schema"
- "Write utility functions"
Decomposition rules:
- Each task produces something a user or developer can observe or test
- Each task modifies 1-5 files (if more, split it)
- Each task has clear start and end states
- Each task can be verified independently of future tasks
Step 2: Map Dependencies
For every task, ask: "What must be DONE before this task can START?"
dependency_rules:
- A task depends on another ONLY if it literally cannot be implemented without the other's output
- Shared utilities are a dependency; shared concepts are NOT
- Database schema tasks typically come first
- API endpoints depend on their data layer
- UI components depend on their API endpoints
- Integration tests depend on the components they test
Step 3: Check for Cycles
If task A → B → C → A exists, the plan is invalid. To detect:
algorithm: topological_sort
1. Build adjacency list from depends_on fields
2. Compute in-degree for each task
3. Initialize queue with all tasks where in-degree = 0
4. While queue is not empty:
a. Dequeue task, add to sorted order
b. For each dependent: decrement in-degree
c. If in-degree reaches 0, enqueue it
5. If sorted order length < total tasks → CYCLE EXISTS
- Remaining tasks form the cycle — redesign their dependencies
Cycle resolution strategies:
- Extract shared dependency into its own task
- Merge tightly coupled tasks into one
- Use interface/contract as the dependency boundary instead of implementation
Step 4: Topological Ordering
Order tasks so that every task appears after all its dependencies. Within the same dependency level, order by:
- Foundation tasks first (fewer dependents → more dependents)
- Lower task ID as tiebreaker (preserves planner intent)
Pre-Mortem Analysis Framework
Before execution begins, assume the project has FAILED. Identify why.
Failure Mode Identification
For each task and for the project as a whole, identify potential failure modes:
| Category | Example Modes |
|---|
| Integration | API contract mismatch, incompatible data formats, version conflicts |
| Data | Migration failures, data loss, schema drift, concurrent access |
| Performance | N+1 queries, unbounded fetches, missing indexes, memory leaks |
| Security | Injection points, auth bypass, data exposure, CSRF |
| Edge Cases | Empty states, max limits, Unicode input, concurrent mutations |
| Dependencies | External API down, library breaking change, missing peer deps |
| Scope | Underestimated complexity, hidden requirements, ambiguous specs |
Likelihood × Impact Scoring
For each failure mode, assess:
likelihood: low | medium | high
low = unlikely given the codebase and approach
medium = possible, has happened in similar projects
high = probable without explicit mitigation
impact: low | medium | high | critical
low = cosmetic issue, easy fix
medium = feature degraded, user-visible but recoverable
high = feature broken, requires significant rework
critical = data loss, security breach, or cascading failures
Mitigation required if: likelihood ≥ medium OR impact ≥ high.
Pre-Mortem Template
pre_mortem:
overall_risk_level: medium
critical_failure_modes:
- mode: "Database migration fails on existing data with NULL values"
likelihood: medium
impact: high
mitigation: "Add NOT NULL with DEFAULT in migration, backfill script, test with production data snapshot"
- mode: "Search endpoint returns unbounded results on empty query"
likelihood: high
impact: medium
mitigation: "Enforce max page_size=100, require at least one filter parameter"
assumptions:
- "PostgreSQL 14+ is available in all environments"
- "Existing auth middleware handles JWT validation"
- "No concurrent schema migrations are running"
Task Writing Standards
Required Fields
Every task in plan.yaml must have ALL of these fields:
| Field | Type | Description |
|---|
id | string | Format: task-NNN (zero-padded to 3 digits) |
title | string | Deliverable-focused, action-verb start |
description | string | Detailed requirements for the implementer |
depends_on | string[] | Task IDs this depends on (empty if none) |
acceptance_criteria | string[] | Specific, verifiable criteria (≥1) |
failure_modes | object[] | Per-task risk analysis |
estimated_effort | enum | small | medium | large |
files_to_modify | string[] | Relative paths to create/modify |
files_to_read | string[] | Relative paths for context |
specification_adherence | object | { required_patterns[], forbidden_patterns[], tech_choices[] } |
Acceptance Criteria Standards
Criteria must be specific and verifiable — a verifier must be able to confirm pass/fail with evidence.
Good criteria:
- "GET /api/search?q=test returns 200 with JSON body containing
results array"
- "File
src/middleware/rateLimit.ts exports rateLimitMiddleware function"
- "Error response for invalid input returns 400 with
{ error: string } body"
- "Component renders loading skeleton when
isLoading is true"
Bad criteria:
- "Search works correctly"
- "Error handling is implemented"
- "Code is clean and well-structured"
- "Performance is acceptable"
Effort Estimation Guidelines
small: 1-2 files, simple logic, clear pattern to follow
Examples: add a config value, create a simple utility, update a type
Typical time: 1 executor delegation
medium: 3-5 files, moderate complexity, some design decisions
Examples: new API endpoint with validation, component with state management
Typical time: 1-2 executor delegations
large: 6+ files, complex logic, cross-cutting concerns
Examples: auth system, search with indexing, real-time sync
Typical time: 2-3 executor delegations (consider splitting)
Rule: If estimated_effort is large, consider splitting into smaller tasks.
plan.yaml Output Format
plan_id: "plan-YYYYMMDD-HHmmss"
feature: "verbatim user request"
created_at: "2026-03-01T14:30:22.000Z"
updated_at: "2026-03-01T14:30:22.000Z"
status: "draft"
pre_mortem:
overall_risk_level: medium
critical_failure_modes:
- mode: "description of what could go wrong"
likelihood: medium
impact: high
mitigation: "prevention or recovery strategy"
assumptions:
- "assumption the plan depends on"
tasks:
- id: "task-001"
title: "Deliverable-focused title"
description: "Detailed requirements for implementer"
depends_on: []
acceptance_criteria:
- "Specific, verifiable criterion"
failure_modes:
- mode: "what could go wrong"
likelihood: low
impact: medium
mitigation: "how to handle it"
estimated_effort: small
files_to_modify:
[, ]
[]
plan.md Output Format
# Implementation Plan: {feature_name}
**Created:** {created_at}
**Status:** {status}
**Risk Level:** {overall_risk_level}
## Summary
{1-3 paragraph summary of the approach}
## Pre-Mortem Analysis
### Critical Risks
| Risk | Likelihood | Impact | Mitigation |
| ------ | ------------ | -------- | ------------ |
| {mode} | {likelihood} | {impact} | {mitigation} |
### Assumptions
- {assumption}
## Task Plan
### Task {id}: {title}
- **Effort:** {estimated_effort}
- **Depends on:** {depends_on or "none"}
- **Files:** {files_to_modify}
- **Acceptance Criteria:**
1. {criterion}
## Dependency Graph
{text-based DAG visualization}
## Critique History
{iterations with objections and responses}
Verification
A valid plan satisfies ALL of these checks:
- Structural integrity: Every
depends_on references an existing task ID
- No cycles: Topological sort produces a valid ordering of all tasks
- Criteria completeness: Every task has ≥1 acceptance criterion
- Criteria quality: Every criterion is specific and verifiable (no vague language)
- Pre-mortem present:
pre_mortem section exists with ≥1 failure mode and ≥1 assumption
- DAG edges consistent:
dag_edges matches the depends_on fields in tasks
- Effort estimated: Every task has a valid
estimated_effort
- Files specified: Every task has non-empty
files_to_modify
- IDs sequential: Task IDs follow
task-NNN format, are unique, and sequentially ordered
- No orphans: Every task is either a root (no deps) or reachable from a root via the DAG