Skip to main content

u0090-memory-risk-aware-scheduler

Build and operate the "Memory Risk-Aware Scheduler" capability for Memory and Knowledge Operations. Trigger when this exact capability is needed in mission execution.

Source facts

Repository
zwright8/OpenClaw-Code
Last source activity
June 18, 2026 at 22:48
Detected SKILL.md language
English
Stars
0
Forks
0

Install options

The review-first prompt is selected by default. You can switch to a direct command or download a local copy.

Review the source files

Read SKILL.md and any companion files shown by SkillsMP before deciding whether to install.

Showing SKILL.md

SKILL.md
Source instructions · Read-only preview
name
u0090-memory-risk-aware-scheduler
description
Build and operate the "Memory Risk-Aware Scheduler" capability for Memory and Knowledge Operations. Trigger when this exact capability is needed in mission execution.
# Memory Risk-Aware Scheduler ## Why This Skill Exists We need this skill because agents lose performance when lessons are not retained and reused. This specific skill times execution based on risk posture instead of urgency alone. ## When To Use Use this skill when the request explicitly needs "Memory Risk-Aware Scheduler" outcomes in the Memory and Knowledge Operations domain. ## Step-by-Step Implementation Guide 1. Define the scope and success metrics for `Memory Risk-Aware Scheduler`, including at least three measurable KPIs tied to repeated mistakes and context loss. 2. Design and version the input/output contract for episodic logs, knowledge nodes, and retrieval metadata, then add schema validation and failure-mode handling. 3. Implement the core capability using risk-weighted sequencing, and produce risk-gated schedules with deterministic scoring. 4. Integrate the skill into swarm orchestration: task routing, approval gates, retry strategy, and rollback controls. 5. Add unit, integration, and simulation tests that explicitly cover repeated mistakes and context loss, then run regression baselines. 6. Deploy behind a feature flag, monitor telemetry/alerts for two release cycles, and iterate thresholds based on observed outcomes. ## Required Deliverables - Capability contract: input schema, deterministic scoring, output schema, and failure modes. - Runtime profile: planning-router using risk-weighted sequencing to produce risk-gated schedules. - Orchestration integration: memory-and-knowledge-operations:planning-router routing, approval gates, retries, and rollback controls. - Validation evidence: unit, integration, simulation, regression-baseline suites and rollout telemetry. ## Operational Runbook ### Preflight - Confirm the Memory Risk-Aware Scheduler request scope, source evidence, and measurable success criteria before execution. - Verify feature flag skill_0090_memory-risk-aware-scheduler, approval gates, and rollback owner before autonomous use. ### Execution - Execute risk-weighted sequencing with deterministic scoring and reproducible trace capture. - Produce risk-gated schedules plus scorecard, assumptions, and unresolved-risk notes. ### Recovery - Fail closed when required signals, evidence, or approval gates are missing. - Rollback to the last stable baseline when posture is critical or validation fails. ### Handoff - Publish risk-gated schedules, validation evidence, and telemetry links to downstream owners. - Queue follow-up tasks for unresolved risks, threshold tuning, or approval review. ## Guardrails - [quality] Require deterministic scoring and validation evidence before promotion. - [reliability] Preserve retries, rollback controls, and failure-mode evidence for every run. - [safety] Route critical posture or missing approval gates to human review before autonomous action.
View on GitHub