| description | Closes an aiwf milestone — verifies all ACs met, runs scoped doc-lint, finalizes the tracking doc, promotes status to done, prepares the wrap commit. Use when the user says "wrap M-NNNN" or "finish the cache milestone" and self-review per `aiwfx-start-milestone` has passed. Commit and push require explicit human approval. |
aiwfx-wrap-milestone
Closes a milestone. Verifies completeness, reconciles the tracking doc, promotes the milestone to done, prepares the single wrap commit.
When to use
The milestone's implementation is complete and self-reviewed (aiwfx-start-milestone step 6 ran clean). The user says: "wrap M-NNNN", "finish M-0007", "close out the cache milestone".
If the milestone isn't actually done — failing tests, unmet ACs, broken build — stop and report. Don't paper over.
Workflow
1. Verify completion
- Re-read the milestone spec. Walk every AC in frontmatter
acs[]. Confirm each has at least one test that exercises it green.
- Run
aiwf show M-NNNN; confirm every AC's status is terminal (met, deferred, or cancelled) — none open. Under tdd: required, also confirm every met AC has tdd_phase: done (the kernel's acs-tdd-audit will surface it otherwise).
- Run
aiwf check. Zero error-severity findings on the milestone. The relevant codes: acs-shape, acs-tdd-audit, milestone-done-incomplete-acs, acs-body-coherence. Warnings (e.g. acs-body-coherence) are advisory but worth resolving before wrap.
- Run the full test suite. All pass.
- Run the project's build. Green.
- Run any project-specific lint or type-check. Clean.
If anything is red, stop and report. Wrap does not paper over failure.
2. Final code review
- Skim for
TODO / FIXME left behind. If they're intentional, document them in the milestone spec's ## Reviewer notes section. If they're unintentional, fix or open as gaps (aiwf add gap --title "..." --discovered-in M-NNNN).
- Skim for debug code, commented-out blocks, scratch logging. Remove.
- Confirm public-API or schema changes are reflected in README, inline docs, or wherever the project publishes its surface.
3. Doc-lint sweep (scoped)
Invoke wf-doc-lint against the milestone's change-set (every file the milestone branch touched since diverging from its base). Surface the report inline.
If the report is clean, note "doc-lint: clean" and continue. If findings:
- Broken code references — fix in this milestone, or open a gap.
- Removed-feature docs — same.
- Orphan files / TODOs — record under the spec's
## Reviewer notes for the reviewer to consider; don't block wrap.
wf-doc-lint reports only — it does not rewrite prose. Any prose changes happen here as deliberate edits.
4. Finalize the milestone spec's wrap-side sections
The v1 separate tracking doc is gone. The milestone spec itself carries the wrap-side sections; finalize them in place:
-
## Work log — confirm one entry per AC with the final outcome and commit SHA. The phase timeline is in aiwf history M-NNNN/AC-<N>; don't duplicate dates here.
-
## Decisions made during implementation — confirm every mid-flight decision is captured (each should already have an ADR-NNNN or D-NNN from aiwfx-record-decision invocations during work).
-
## Validation — paste the test-suite and build results.
-
## Deferrals — list any work this milestone deliberately punted; for each, open a gap entity so it survives:
aiwf add gap --title "<deferred-work>" --discovered-in M-NNNN
Then mirror the resulting G-NNN id here. Deferred ACs (status deferred) get a one-line note pointing at the receiving milestone or gap.
-
## Reviewer notes — trade-offs, deliberate omissions, places where the obvious approach was rejected. The reviewer agent reads this first.
For ACs that were cancelled mid-implementation, link to the D-NNN decision (or the conversation context) explaining why under the cancelled AC's body section. The kernel only guards the structural state (status: cancelled, position-stable in acs[]); the why is the human's narrative.
5. Promote the milestone status
aiwf promote M-NNNN done
aiwf validates in_progress → done, rewrites frontmatter, commits with aiwf-verb: promote trailers. The promote commit is separate from the implementation commits — it captures the moment of closure.
6. Update the roadmap
aiwf render roadmap --write
The roadmap reflects the milestone's new status without hand-edits.
7. Stage all changes and prepare the wrap commit
The milestone spec carries all the wrap-side prose now (Work log, Validation, Deferrals, Reviewer notes). Stage it:
git add work/epics/E-NNNN-<slug>/M-NNNN-<slug>.md
git status
git diff --staged --stat
Draft a conventional commit message: feat(<scope>): <one-line summary> (M-NNNN).
8. 🛑 Commit gate
Show the user:
git diff --staged --stat
- The proposed commit message.
- A summary of what landed: AC count green, doc-lint summary, deferrals opened (with gap ids).
Stop and wait for explicit "commit" approval.
9. After commit approval
git commit -m "<approved-message>"
10. 🛑 Push gate
Confirm with the user before pushing. Then:
git push -u origin milestone/M-NNNN-<slug>
Open the PR if the project's flow is PR-driven. Reference the milestone id in the PR title.
11. After merge
- If the project uses an epic-integration branch, merge the milestone branch into the epic branch (
--no-ff to preserve the milestone shape).
- Delete the milestone branch on origin.
- Run
aiwf render roadmap --write once more if the merge introduced any state aiwf would notice.
Constraints
- 🛑 Never commit or push without explicit human approval (steps 8, 10).
- All ACs must be green before wrap proceeds. Wrap does not bury failure.
- Branch-coverage hard rule applies — re-run the audit if any code changed since
aiwfx-start-milestone's self-review.
- Deferrals must be captured as gaps. Don't leave deferred work as a
## Deferrals bullet that nothing else points at.
Anti-patterns
- Wrapping with red tests. Either fix the tests, escalate the AC failure, or cancel the milestone (
aiwf cancel M-NNNN). Don't wrap broken work as done.
- Wrapping with open ACs. The kernel's
milestone-done-incomplete-acs finding will fire — --force lands the verb but leaves the standing check red. Resolve every AC to a terminal state (met/deferred/cancelled) before wrap.
- Silent deferrals. Every "we'll do that later" gets a gap entity.
- Skipping doc-lint. Doc drift compounds; the milestone wrap is the cheap moment to catch it.
- Slipping unrelated code into the wrap commit. If the change isn't part of this milestone, it's a separate
wf-patch.
Next step
If this is the last milestone in the epic: → aiwfx-wrap-epic E-NNNN.
Otherwise: → aiwfx-start-milestone <next-M>.