schedule-backlog
This is a backlog-scheduling workflow, not an implementation workflow.
Default behavior is proposal-first:
- evaluate a coherent backlog slice
- map it into roadmap phases
- summarize the proposal before mutating
ROADMAP.md, BACKLOG.md, or ISSUES.md
Defaults
- Default mode is proposal-only.
- Default proposal size is small to medium and reviewable.
- Prefer existing incomplete phases when they fit the work cleanly.
- Do not renumber completed phases.
Inputs
Accept any combination of:
- a focus area, phase number, or text query
- a proposal size
- a maximum number of new phases
- whether issue-impact notes should be included
- whether approved changes should later be applied
Multi-agent pattern
Recommended roles:
Standards reader: extracts roadmap and decision constraints.
Backlog triage lead: selects candidate backlog items.
Issue cross-checker: identifies issue prerequisites or obsoletions.
Roadmap integrator: drafts the phase proposal.
Reporter: writes the proposal and approval guidance.
Global constraints
- Do not implement backlog items in this workflow.
- Do not invent requirements that are not in
BACKLOG.md, ROADMAP.md, ISSUES.md, DECISIONS.md, or README.md.
- Keep the proposal reviewable and coherent.
- Treat non-user-visible engineering work as issue-ledger material unless the roadmap explicitly needs a separate engineering phase.
Human checkpoints
- Required: ask when a proposed placement would require renumbering a completed phase or making a non-obvious sequencing tradeoff.
- Optional: ask after the proposal only when the requested apply step would commit to a non-obvious prioritization or sequencing choice.
- When a checkpoint involves a genuine tradeoff between substantive alternatives, present at least two options with brief pros and cons, state which you recommend and why, and let the human decide.
- Stay autonomous while reading, triaging, and drafting the proposal itself.
Roadmap workflow
Phase 0: Preflight (Standards reader)
- Read, in order, when they exist:
ROADMAP.md
DECISIONS.md
BACKLOG.md
ISSUES.md
README.md
Phase 1: Select the backlog slice (Backlog triage lead)
- Respect any user focus first.
- Otherwise choose a reviewable subset using:
- roadmap alignment
- priority
- cohesion
- dependency clarity
- Separate any misclassified engineering-only items that belong in
ISSUES.md, not the roadmap.
Phase 2: Cross-check issue and decision impacts (Issue cross-checker)
For each candidate group, identify:
- prerequisite issues
- issues that would likely become obsolete
- decisions or roadmap constraints that affect scheduling
Phase 3: Draft the proposal (Roadmap integrator)
For each suggestion, provide:
- target phase or new phase proposal
- included backlog items
- why the grouping fits
- prerequisites
- issue impacts
If a new phase is needed, include:
- preferred placement
- goal
- high-level tasks
- exit criteria
Phase 4: Draft the proposal summary (Reporter)
The proposal summary must contain:
# Roadmap Update Summary
- current roadmap shape
- backlog slice reviewed
- short recommendation summary
## Suggestions
## Backlog Hygiene Notes
- duplicates or misclassified items
## Open Questions
- only when a sequencing decision truly needs the human
## Approval Options
- how the user can approve, reject, or modify each suggestion
Guardrails
- Do not schedule a huge backlog sweep in one proposal.
- Do not bury prerequisites or sequencing risk.
- Do not mutate roadmap files in the same step as drafting the proposal unless the request already includes applying a clear, low-ambiguity proposal.
- Do not present engineering refactors as user-visible roadmap work unless the roadmap truly needs them there.
Definition of done
- The proposal summary includes every required section (
Summary, Suggestions, Backlog Hygiene Notes, Open Questions, Approval Options).
ROADMAP.md, BACKLOG.md, and ISSUES.md were not mutated in this run unless the user's request explicitly included an apply step with a clear, low-ambiguity proposal.
- Each proposal entry names its target phase (existing or new), included backlog items, grouping rationale, prerequisites, and issue impacts.
- Misclassified engineering-only items are flagged in
Backlog Hygiene Notes rather than silently included in a roadmap phase.
Final handoff
After drafting the proposal:
- Summarize the best proposal options.
- Tell the user how to approve, reject, or modify each suggestion.