| description | Kill bad plans before they kill you. Quick premortem: '!premortem' or 'premortem this'. Full premortem: '!premortem full'. Auto-detects what you're working on. Integrates Base Rates, Bias Circuit-Breaker, L/I Scoring, Commitment — all 4 core features in one pass. Designed for Claude Code CLI: minimal friction, terminal-native output. |
| version | 1.5.4 |
| author | DasClown |
| license | MIT |
| metadata | {"triggers":{"immediate":["!premortem","!pm","premortem this","premortem my","kill this plan","stress test this"],"strong":["what could go wrong","am I missing anything","poke holes in this","devil's advocate"],"full_mode":["!premortem full","!pm full","full premortem"],"review":["!pm review","!premortem review","premortem calibration"],"persist":["!pm persist","!premortem log","log premortem"]},"requires":[]} |
Premortem — Kill Bad Plans Before They Kill You
Core idea: Instead of asking "will this work?" → imagine it already failed 6 months from now, then explain why. This is Kahneman's single most valuable decision tool. It breaks the AI's default agreeableness and your own optimism bias.
Philosophy: Denk dir Dinge zuende. Sei kritisch mit dir selbst. The premortem is not about being pessimistic — it's about being honest before reality forces honesty on you.
Two Modes
Quick Premortem (!premortem / !pm) — 30 seconds
For small-to-medium decisions during coding. 3 questions + quick L/I calibration.
- What's the most likely way this fails? — Rate L (1-5) + I (1-5)
- What's the worst-case failure? — Even if unlikely, what's the damage?
- What's one thing you should verify right now? — Checkable in this session
Automatic L/I: For the #1 failure, assign L × I and show the zone.
L=4 I=3 → 12 🟠 Needs mitigation
No ceremony. ~12-16 lines, 30 seconds.
Full Premortem (!premortem full / !pm full) — 2-3 minutes
For high-stakes decisions: architecture choices, deploys, major refactors, feature launches. Runs all 4 core features:
- Base Rates — Reference real failure statistics for this type of decision
- Bias Circuit-Breaker — Systematic check for Sycophancy, Optimism, Availability, Anchoring
- L/I Scoring — Likelihood × Impact scoring (1-5) for each failure mode
- Commitment — Concrete next action with a date
Context Auto-Detection
Before running, determine what the user is planning:
Git Context (if in a repo)
git log --oneline -3 → What's the current branch doing?
git diff --stat HEAD~1 → How many files changed? What type of work?
git branch --show-current → Feature branch? Fix branch? Main?
- Keywords: If commits mention "refactor", "migrate", "rewrite", "restructure" → auto-suggest
!pm
Conversation Context
- What was the user's last message? Are they describing a plan?
- Any architecture decisions, config changes, or dependency additions?
- Are they about to merge/deploy? High-risk?
If unclear after scanning, ask ONE question: "Was genau planst du gerade?" Don't ask more than that.
Quick Premortem Flow
When the user says !premortem or any immediate trigger:
### Premortem 🔪
Plan: [one-line summary of what you detected they're doing]
#### 1. Most Likely Failure
[specific, grounded in their actual context. Not generic.]
L=? I=? → L×I=? [zone]
#### 2. Worst-Case Failure
[the one that would do real damage, even if less likely]
L=? I=? → L×I=? [zone]
#### 3. Verify Now
[one concrete thing they can check right now, in this session]
→ [actual command or check they can run]
That's it. Total output: ~12-16 lines. Keep moving.
Persist
Append this premortem as one JSON line to .premortem/log.jsonl (create dir if missing).
Set occurred=null, status="open". Confirm with: "Logged - !pm review checks it later."
Full Premortem Flow
When the user says !premortem full:
Step 1: Set the Frame
🔪 FULL PREMORTEM — 6 months from now, this has FAILED.
Plan: [one-line summary]
Step 2: Failure Generation
Run all 4 features in parallel (spawn sub-agents or run as structured analysis). Produce:
## Failure Modes
[numbered list, each 1-2 sentences, specific to THIS plan]
Step 3: The 4 Features (integrated output)
## Risk Assessment
| # | Failure Mode | L | I | L×I | Mitigation |
|---|-------------|---|---|-----|------------|
| 1 | [mode] | 4 | 5 | 20 | [concrete] |
| 2 | [mode] | 3 | 4 | 12 | [concrete] |
...
Step 4: Base Rates Check
For each failure mode, ask: "What class of decision is this, and what does the base rate say?"
Source: references/base-rates.md. Quick reference:
- Software project → 70% timeline overshoot
- Refactoring → 64% exceed 50%+ of estimate
- Product launch → 70-95% failure rate
- Feature without user research → 64% fail
Example: Your "2-week estimate" → base rate says 3-4 weeks minimum.
Step 5: Bias Circuit-Breaker
After generating failures, run these checks (source: references/bias-circuit-breaker.md):
- Sycophancy check: Am I being too nice? Would I say this to a stranger?
- Optimism check: What's the inside view vs. outside view timeline?
- Availability check: Am I anchoring on the last thing I built/saw?
- Anchoring check: Is my estimate anchored to an arbitrary starting point?
If any check triggers, note it in the output:
⚠️ Bias alert: Optimism bias detected. Inside view says 2 weeks. Outside view (similar projects) says 3-4 weeks.
Step 6: Commitment
## Commitment
[ONE concrete action] by [DATE].
Example: "Test pricing at $47 with 10 users by Friday" — NOT "consider testing pricing."
Output Format (Full)
🔪 PREMORTEM REPORT
## Failure Modes (N found)
1. [failure 1]
2. [failure 2]
...
## Risk Matrix
| # | Failure | L | I | L×I | Mitigation |
|---|--------|---|---|-----|------------|
...
## Bias Check
[any triggered biases with explanation]
## Commitment
[action] by [date]
→ Top priority: [the ONE thing to fix first]
The 4 Core Features (always active in Full mode)
1. Base Rates
Every failure mode is evaluated against real statistics. See references/base-rates.md. Key data points:
| Domain | Failure Rate | Source |
|---|
| Software projects exceed time estimates | 70% | Standish CHAOS |
| Software projects exceed budget by 100%+ | 45% | Standish CHAOS |
| Startup 5-year survival rate | 50% | BLS / Statistic Brain |
| Product launches that fail | 70-95% | HBS / Nielsen |
| Wrong hires (fired within 18 months) | 40-50% | HBR / Leadership IQ |
| M&A value destruction | 70-90% | McKinsey / HBR |
| Open-source CLI tools reach < 100 stars | 95% | GitHub ecosystem data |
| Features deployed but never used | 45% | Standish CHAOS |
| Build-phase tool to distribution failure | ~80% | PM Learning Curve (build != ship) |
2. Bias Circuit-Breaker
Run AFTER generating failures (not before — don't filter yourself). Check for:
- Sycophancy: Am I being too agreeable? Rephrase the failure in the harshest honest terms.
- Optimism: Inside view vs. outside view. What would someone who's done this 10 times say?
- Availability: Is this failure mode from the last thing I read/built, or is it genuinely relevant?
- Anchoring: Did I start from an arbitrary number and insufficiently adjust?
- Scope Creep (Bonus): Is the plan bounded? What's explicitly NOT included?
See references/bias-circuit-breaker.md for detailed protocols.
3. L/I Scoring - ordinale Heuristik, KEIN cardinales Mass
WARNING: LxI ist Sortier-Heuristik, nicht objektiver Score. Ordinal x ordinal ist
mathematisch nicht vergleichbar (Cox, "What's Wrong with Risk Matrices?", 2008).
Primar pro Dimension screenen:
- I=5 -> ROT immer - aber die AKTION hangt von L ab:
- I=5 & L>=3 -> Pravention: Eintrittspfad mitigieren. Hoch + wahrscheinlich = Plan andern.
- I=5 & L<=2 -> "insurable tail": Eintritt kaum senkbar -> Schadensbegrenzung bauen
(Rollback / Backup / Kill-Switch / Circuit-Breaker)
ODER strukturelle Verwundbarkeit bewusst akzeptieren UND dokumentieren.
Verbotener Default: I=5 ignorieren, weil L niedrig ist.
- L=5 -> mindestens ORANGE, egal welches I.
- Sonst nach LxI sortieren - als grobe Triage-Reihenfolge, nicht als Wahrheit.
Drop "15-25 Rot / 9-12 Orange" - suggerierte Prazision, die nicht existiert.
Likelihood (L): See references/li-scoring.md for full scoring anchors and decision rules.
Impact (I): 1 = minor, 2 = some rework, 3 = delay/reputation, 4 = major loss, 5 = project-killing
See references/li-scoring.md for tie-break rules (equal LxI).
4. Commitment
Every full premortem ends with ONE concrete commitment:
- Format: "[Specific action] by [Date]"
- NOT: "Consider X" or "Think about Y" or "Look into Z"
- DE-FENCE Pattern (Distribution Engagement): Wenn der Engpass Distribution ist (nicht Build), dann muss das Commitment ein Verteil-Akt sein, kein Bau-Akt. "dev.to-Artikel publishieren" OK - "CLI bauen" NICHT OK
- Examples: "Write integration tests for the payment flow by Thursday" OK - "Consider testing more" NICHT OK
See
references/commitment.md for the commitment protocol.
5. Distribution Playbook
Wenn der Engpass Distribution ist (nicht Build): siehe references/distribution.md.
Der Commitment-Mechanismus in Schritt 6 muss ein Verteil-Akt sein (DE-FENCE Pattern).
!pm review - Calibration Loop
-
OPEN COMMITMENTS: Read .premortem/log.jsonl. List every record where status="open".
- due < today -> "OVERDUE"
- due <= +3d -> "due soon"
- else "open"
- Ask: done / postponed / cancelled? -> set status = done | missed | dropped
-
UNRESOLVED PREDICTIONS: For records >14d old with any occurred=null:
"Premortem from [date] - '[plan]'. Failure '[desc]' (you gave L=[L], p=[p]):
actually occurred? [y/n]" -> set occurred = true | false
-
BRIER SCORE: Over all resolved predictions, calculate and interpret
(see references/calibration.md for formula and band mapping).
Report with n: "Brier X.XX over N resolved predictions."
Note systematic direction: underestimating or overestimating risk?
When to Use
Good targets:
- Architecture decision (monolith vs. microservice, library choice, DB schema design)
- Before a big refactor ("I'm going to rewrite the auth module")
- Before deploying to production
- Before committing to a timeline or estimate
- Before a major purchase or SaaS decision
- When you're too confident about a plan (that's the danger signal)
- Before expanding a working tool to multiple new deliverables (e.g. Skill -> CLI + MCP + Package = Scope Explosion)
Bad targets:
- One-line changes or trivial fixes (just do it)
- Questions with a factual answer (just answer it)
- Problems you can't change anymore (premortem requires agency)
- When you're already in crisis mode (premortem is PRE, not DURING)
Auto-detection: If the user describes a plan spanning 3+ files, an architecture decision, or uses words like "refactor," "rewrite," "migrate," "restructure" — suggest a quick premortem: "Want me to premortem this before you start?"
Anti-Patterns
- Generic failures: "The code might have bugs" is useless. Be specific to THIS plan.
- Going through the motions: Actually think. The user can spot a phoned-in premortem.
- Sugarcoating: The whole point is to hear what you DON'T want to hear.
- Too many questions: Auto-detect context. Ask max ONE question if unclear.
- Analysis paralysis: Quick mode exists for a reason. Don't full-premortem a CSS fix.
- No self-audit: Du hast den Skill gebaut — also MUSST du ihn selbst benutzen. Jeder Commit, jeder Push.
- Scope Explosion: "Klingt cool, mach CLI + MCP + Package" = 3 Projekte, fertig wird keins. Ein Deliverable, max zwei. Alles andere ist Ablenkung.
- Building statt Distributing: Wenn das Tool 9.5/10 ist aber 0 Nutzer hat, ist der Engpass nicht Features. Es ist Reichweite. Bauen verschiebt das Problem nur auf ein anderes Frontend.
- "KI fuer KI" vergessen: Wenn deine Intention "KI fuer KI, nicht fuer Menschen" war, aber der Plan ein CLI ist (Mensch tippt Enter, Mensch liest Output) - dann widerspricht der Plan deiner Intention. Pruef das frueh.
Pro-Tipp
Gewohnheit aufbauen: Vor jedem git commit -m "refactor" → !pm. Vor jedem git push mit Breaking Changes → !pm full. 30 Sekunden jetzt sparen Stunden später.
Beispiel aus der Praxis: "20 Tulpen — zack, Abfahrt." Der Plan: D2C Blumen-Dropshipping in 2 Wochen live. Premortem nach 5 Minuten: Kühlkette killt die Marge, VAT/EORI frisst den Gewinn, Reklamationen sind unkalkulierbar. Ergebnis: Nicht bauen. 5 Minuten gespart vs. 6 Monate Learned. Das ist der Wert.
Beispiel 2 - Selbst-Premortem auf den Premortem-Skill: 6 Monate nach dem Build hat der Skill 9.5/10 Qualitat, aber 0 Nutzer. Der Autor will CLI + MCP Server bauen. Premortem: Scope Explosion (L=5 I=4 -> 20 ROT), Wartungsfalle (L=4 I=3 -> 12 ORANGE), Nutzerloser CLI (L=4 I=3 -> 12 ORANGE). Bias-Check: Optimismus (Bau-Launch-Reflex statt Promote-Learn-Iterate). Base Rate: 95% der Open-Source-CLIs erreichen < 100 Sterne. Commitment: Nicht bauen. Stattdessen dev.to-Artikel publishieren fur Reichweite. Ergebnis: 30 Minuten Content vs. Wochen Build-Verschwendung. Der Skill wurde auf sich selbst angewandt - und hat seine eigene Uber-Engineering-Phase gekillt.
Siehe CHANGELOG.md für die Versionshistorie.