Shape
Converge with the PM on what the problem actually is before the EM goes solo on how to solve it. Plans fuse a PM-owned PRD half (the problem, what "solved" means) with an EM-owned SDD half (architecture, fix-locus, sequencing); the pipeline has rigor for the SDD half and almost none for the PRD half. /shape is that missing front-half: a short, collaborative problem-convergence beat whose only exit is a ratified problem-set that altitude-routes to the horizon-appropriate downstream ceremony (coordinator:plan, coordinator:roadmap-planning, or coordinator:goal-setting).
/shape is a strategic ceremony, not a tactical clarification round. It operates at the altitude of product intent, scope boundaries, and success criteria — the questions only the PM can resolve. Tactical uncertainties (naming, file structure, which test framework, commit shape, refactor mechanics) are EM remit and do NOT belong in a /shape exchange, no matter how genuinely unsure the EM is — resolving them is the EM's job (global CLAUDE.md § PM Altitude).
Announce at start: "Using /shape to converge on the problem before we plan a solution."
When NOT to invoke
- Trivial work (single-file change, obvious scope) → just do it.
- PM doesn't know what to build / needs approaches explored →
coordinator:brainstorming. The discriminating test: if the PM HAS a problem and wants confirmation you understood it (vs. not knowing what to build at all) → coordinator:shape, not coordinator:brainstorming.
- Problem already converged (a prior
/shape, an existing approved spec, a known next-step on a live workstream) → straight to the appropriate downstream skill (see § Transition).
/shape and coordinator:brainstorming are siblings, not twins: brainstorming turns vague intent into a design spec (a solution artifact in docs/specs/); /shape converges on the problem (a problem-set in docs/problems/) and defers solutioning entirely. Both chain into a downstream planning ceremony.
Once `/shape` has started, do NOT invoke any implementation skill, write any code, scaffold anything, or dispatch any executor until the problem-set is written and PM-ratified. The only exit from `/shape` is a ratified problem-set that transitions to the horizon-appropriate downstream ceremony via the altitude-router (see § Transition).
This gate is about finishing what you started. If the problem was already converged (prior /shape, existing spec, known workstream next-step), skip /shape entirely and go straight to the appropriate downstream skill. But once /shape starts, see it through.
Process (lightweight — this is NOT brainstorming's full design dialogue)
- Restate the problem(s) as received, in the PM's vocabulary, falsifiably. Not "I understand" — the actual problem, stated so the PM can catch a misread.
- Surface your single biggest uncertainty per the forced-articulation contract below. This is the load-bearing step — do it honestly or the ceremony is theatre.
- PM corrects/confirms. Iterate until convergence. The goal is a shared mental model; the written problem-set is its residue, not its substitute.
- If the PM has a proposed solution-shape, reflect that back too and flag where you'd push back — but do NOT design. Solutioning is
coordinator:plan's job.
- On convergence, scaffold the problem-set artifact (below) via
coordinator-doc-new, fill its body, set estimated_horizon, and ratify with the PM, then confirm the horizon and chain into the appropriate downstream ceremony (see § Transition).
Forced-articulation contract (defeats confidence-coupled-with-helpfulness)
A yes/no "do I have the shape? ✓" is a banned response shape — EM confidence is coupled with helpfulness, so it self-reports green every time and reveals nothing (the same failure mode that made plan-coverage-checker no-opt-out). Step 2 must instead produce the thing that reveals a misunderstanding:
- (a) The single least-certain item must be the scope boundary whose wrong guess would cost the most rework. Phrase it as "name the boundary that, if guessed wrong, invalidates the most of the plan" — NOT "name something I'm unsure about." A trivially-chosen item ("I'm slightly unsure whether to put X in a helper or inline") is explicitly non-responsive.
- (b) State the probability-weighted consequence. "If I'm wrong about X, then Y and Z are rework." A low-stakes selection self-evidently fails this test — the PM can see at a glance whether the stated consequence is credible.
- (c) The surfaced uncertainty must be a PM-altitude question — product intent, scope boundary, or success criteria. Tactical/EM-decided uncertainties (naming, test framework, commit shape, file structure) are disqualified as off-altitude — not merely low-stakes — regardless of how unsure you are, per
global CLAUDE.md § PM Altitude. Resolving them is your job; surfacing them is noise.
- Also flag any intent you inferred that the PM did not state — inferred scope, inferred priority, inferred constraint.
This does not make the mechanism un-gameable in absolute terms (no self-report is), but it raises the cost of the dodge above the cost of honest articulation — the right bar for an offer-shaped mechanism, per eager-agent-calibration.md § offer-shape.
The problem-set artifact
Scaffold via: coordinator-doc-new --type problem-set --title "<problem title>" — emits docs/problems/YYYY-MM-DD-<slug>.md with status: draft and the canonical section skeleton. Tiny by design — a bulleted problem list, not a design doc. The scaffolder creates docs/problems/ if absent.
Fill the skeleton and ratify:
- List problems under
## Problems (numbered, NOT prioritized — no P<n> prefix; plain enumeration only, since these are unordered problem statements).
- List explicit non-goals under
## Out of scope (architectural reasons) with hard architectural reasons (not "later").
- On PM convergence, flip
status: draft → ratified, fill ratified_by, ratified_date, and estimated_horizon in the frontmatter, and stamp the > Ratified by PM <name> <date> blockquote.
Integrity marker: status: ratified plus the > Ratified by PM … blockquote are what make this a real PM oracle rather than EM self-talk. A problem-set without ratification is status: draft and does NOT count as an oracle. Plans link it via the problem_set: frontmatter key.
Transition
Once the PM ratifies the problem-set, the altitude-router selects the downstream ceremony based on the work's horizon. The horizon is detect-then-confirm: surface your horizon read to the PM at ratification and let them confirm before chaining. Never pick a rung silently.
Horizon routing:
estimated_horizon | Work shape | Downstream ceremony |
|---|
session | One or two sessions of work | coordinator:plan — the ratified problem-set becomes the plan's coverage oracle (plan-coverage-checker consumes it). |
week | Roughly a week, multi-session but bounded | coordinator:roadmap-planning — the problem-set seeds a roadmap with sprint-sized stubs. |
initiative | Weeks-to-quarters, multi-goal scope | coordinator:goal-setting — the problem-set seeds an OKR-shaped goal artifact. When the vision decomposes into multiple goal-slices, /shape may fan out 1→N spinoff-goal stubs (deferred-baton fan-out) rather than chaining into a single goal-setting ceremony. |
Precedence: A PM axiom or directive to use a specific downstream skill, and an architectural-tier flag from the forced-articulation contract that resolves the horizon unambiguously, take precedence over the detect-then-confirm router. The router is the DEFAULT exit for ambiguous or undirected convergence.
Ambiguous horizon: If the horizon is genuinely unclear after the convergence exchange, ask explicitly: "Does this feel like a session, a week, or an initiative?" Do not silently pick.
Ceremony placement: /shape is the third vertex beside coordinator:brainstorming (vague what) and straight-to-the-downstream-ceremony (converged shape — altitude-router selects the rung), per ceremony-calibration.md.