Skip to main content
Jeden Skill in Manus ausführen
mit einem Klick
GitHub-Repository

h2

h2 enthält 17 gesammelte Skills von dcosson, mit Repository-Berufsabdeckung und Skill-Detailseiten auf SkillsMP.

gesammelte Skills
17
Stars
156
aktualisiert
2026-05-25
Forks
12
Berufsabdeckung
3 Berufskategorien · 100% klassifiziert
Repository-Explorer

Skills in diesem Repository

babysit-pr
Softwareentwickler

Schedule yourself to wake up every 5 minutes and shepherd an open PR — fix failing CI, address review-bot comments (push fixes for legit findings, resolve false positives, re-request review once addressed), reply to mechanical human comments with fixes, and flag architecture-level human comments back to the user. Exits the loop when the PR is green and review is clean. NEVER merges the PR.

2026-05-25
plan-work-completion-signoff
Softwarequalitätssicherungsanalysten und -tester

Verify implemented plan docs against their actual code, add completion signoff metadata, and surface any gaps as new beads. Designed for scheduler/concierge agents coordinating multi-agent signoff after implementation is done.

2026-05-02
plan-orchestrate
Projektmanagementspezialisten

Orchestrate the full planning lifecycle — from input assessment through architecture, plan writing, review cycles with convergence, and sign-off. Designed for concierge/scheduler agents coordinating multi-agent planning work.

2026-05-02
plan-tighten
Projektmanagementspezialisten

Surgically trim verbosity and within-doc duplication from a plan doc without losing fidelity. Cuts review residue, restated rationale, illustrative code that prose+signature already covers, redundant adjacent sections, and prose-then-table restatements. Preserves all API/interface specs, acceptance criteria, URP/EO/AA commitments, decision rationale where alternatives matter, and review disposition tables. Run after plan-incorporate, before plan-work-completion-signoff.

2026-05-02
prepare-to-land
Softwareentwickler

Clean up a long-running work branch before landing into main — close beads, prune review docs, strip ceremonial comments, undo accidental cross-cutting refactors that weren't part of the task. Run after implementation completes, before opening the PR to main. Specific to the final land into the trunk, NOT for ordinary feature-to-feature merges along the way.

2026-04-30
plan-review
Projektmanagementspezialisten

Independently review a plan doc and its test harness. Produces a review findings doc rated P0-P3. Run multiple times with different reviewers for independent perspectives.

2026-04-30
plan-seam-review
Projektmanagementspezialisten

Review the interfaces and seams between connected plan components to catch wiring omissions before implementation begins. Runs after individual plan reviews converge, before plan-to-beads. Supports vertical-slice (end-to-end request path) and horizontal-seam (cross-cutting contract) review modes.

2026-04-30
e2e-wiring-review
Softwarequalitätssicherungsanalysten und -tester

End-to-end wiring audit of a component or application. Traces every user-facing entry point through the full request path, identifies what is wired vs stubbed/dead, and verifies test coverage. Works for any project type — web apps, APIs, CLIs, databases, mobile apps.

2026-04-30
plan-architect
Projektmanagementspezialisten

Produce a high-level architecture doc and — if the project is large enough — a plan index that lists sub-plans to be written later. Use after shaping to create the planning structure. Does NOT write sub-plans itself.

2026-04-30
plan-summarize
Softwareentwickler

Generate a planning summary doc with review statistics, incorporation rates, convergence tracking, finding patterns, and document metrics across plan docs AND test harness docs. Supports multiple review rounds — each round gets its own section.

2026-04-06
code-review
Softwarequalitätssicherungsanalysten und -tester

Review a code diff for a bead/feature. Produces a structured review doc with severity-rated findings. Run by reviewer agents after implementation is complete.

2026-03-28
plan-to-beads
Softwareentwickler

Decompose reviewed plan docs into implementation beads (epics + tasks) with correct dependencies. Reads plan docs, identifies components, and creates properly sized bd tasks.

2026-03-28
plan-draft
Softwareentwickler

Write a detailed plan doc and its companion test harness doc for a single component. Use after plan-architect has created the plan index.

2026-03-16
code-review-incorporate
Softwarequalitätssicherungsanalysten und -tester

Incorporate code review feedback — make code changes, commit with review trailers, update disposition table, and request re-review if needed. Mirrors plan-incorporate for code reviews.

2026-03-09
plan-incorporate
Projektmanagementspezialisten

Incorporate review feedback into a plan doc. Reads review files, updates the source doc, adds a disposition table tracking every finding, and deletes review files. Supports multiple review rounds — detects existing disposition tables and adds the next round.

2026-03-02
shaping
Projektmanagementspezialisten

Use this methodology when collaboratively shaping a solution with the user - iterating on problem definition (requirements) and solution options (shapes).

2026-02-25
stress-test
Softwareentwickler

Adversarially stress-test a technical plan by verifying claims against real docs, running POC code, and updating the plan before you build.

2026-02-25