| description | Launch the factory's control plane — scaffold and fill FACTORY-ORDERS (weekly mandate + hard budget), STANDING-ORDERS (autonomous-program authority), HEARTBEAT (weekly pulse), and write lifecycle gates for every registered product. A deliberate one-time ritual (re-run to audit); invoke as /factory-launch, not auto-triggered. |
/factory-launch — set up the factory's control plane
The moment Hamzaish goes from "a repo with skills" to "a running factory": bounded
unattended work, a formal authority model, and numeric kill gates. Everything here is
operator-local (.local files, gitignored) — this is YOUR control plane, not the repo's.
Preconditions
bun run setup has been run (it scaffolds the three .local files from the .example
templates at the repo root; re-run it if they're missing — it never overwrites).
The walkthrough (one step at a time; confirm before moving on)
-
FACTORY-ORDERS.local.md — the mandate. Open it with the operator. Fill:
- the Mandate section: 1–3 lines, each naming a product + the gate it's chasing this week;
- the Budget section: the weekly dollar cap for ALL unattended work (suggest $25–50 to
start — the cap is a feature, not a limitation: scarcity forces scoping).
Explain: unattended sessions read this file FIRST and refuse work outside it.
-
STANDING-ORDERS.local.md — the authority table. Read the three programs
(overnight-build, gtm-draft, heartbeat) aloud in summary. Confirm the operator accepts
the iron law: agents research and draft; the operator publishes, sends, pays. Any
scope widening is their explicit, dated edit — never yours.
-
HEARTBEAT.local.md — the pulse. Confirm the weekly cadence (default: Monday, before
the operator's pulse block). Offer to schedule it (cron/scheduled task) or leave it
manual (run the HEARTBEAT checklist in a fresh session).
-
Gates for every registered product. Run bun run check-gates. For each registered
product flagged NO GATES ✗, write the gates block into its product.config.json
with the operator — states-and-dates, channel-matched (see the gate ladder in
FACTORY-ORDERS.example.md's pointer, or default: validation +4w · launch +30d ·
traction +90d · pmf +6mo). Dates are absolute (YYYY-MM-DD). The operator sets the
states; you propose channel-matched defaults. WIP caps to confirm while you're here:
1 active build · 2 active GTM · rest autopilot.
-
Verify. bun run check-gates exits 0 and the dashboard shows every registered
product with a next gate. bun test ./scripts/control-plane-templates.test.ts passes.
Show the operator the dashboard. Done = both green, mandate + cap filled.
Completion criteria (checkable — no "looks done")
Anti-patterns
- Filling the mandate/budget FOR the operator with invented numbers — the whole point is
their precommitment, not yours.
- Writing gates a product can't measure (name the metric's source: Stripe, PostHog, GSC).
- Treating this as config to rush through — it's the factory's constitution; 20 minutes
done honestly beats 5 minutes done cosmetically.