| description | Update Flo's Structured daily planner from natural language. Use when the user asks to update, reorganize, clean up, reschedule, color-code, icon-code, split, log, or reconcile tasks/events/time blocks in Structured, especially today's plan, including messy voice-transcribed updates, quarter-hour scheduling, overlap handling, recurring task instances, travel/appointment splitting, and Structured built-in icons/colors. |
Structured Day Planner
Update the user's Structured day plan with careful time hygiene, visual categorization, and explicit conflict handling.
Workflow
-
Read the current Structured plan first.
- Use today's plan for relative requests like "today" or "my plan of the day".
- Use the user's current timezone when available.
- Preserve existing tasks unless the user clearly changes, replaces, completes, or removes them.
-
Parse the user's update into proposed changes.
- Treat voice-transcription quirks generously.
- If the user gives conflicting corrections in one message, the latest correction wins.
- Split compound events into useful blocks: travel there, appointment, travel back, follow-up activity.
- For recurring tasks, change only today's occurrence by default. Do not edit the whole series unless requested.
-
Apply every unambiguous change.
- Do not wait on unrelated ambiguities before making clear updates.
- Mark completed past/logged blocks complete when the user says they already happened.
- Remove accidental/log-only blocks only when the user says they are not needed.
-
Stop and ask about ambiguous or conflicting changes.
- Ask before deleting, moving, or replacing an existing task that might still be intended.
- Ask before resolving overlaps.
- Summarize what was already changed, then list the unresolved choices.
-
Verify by reading the plan back.
- Confirm no unintended overlaps remain.
- Confirm task titles, times, colors, and
symbol values persisted.
- Report concise final schedule changes and assumptions.
Time Rules
- Start and end every timed block on a quarter-hour boundary:
:00, :15, :30, or :45.
- Durations may be any length that preserves quarter-hour start/end boundaries.
- If the user gives a precise non-quarter time, ask before rounding unless the intended rounding is obvious and low-risk.
- Do not create overlapping blocks unless the user explicitly confirms the overlap is intentional.
- If a duration is missing but the context makes one natural, infer minimally and state the assumption.
Overlaps and Ambiguity
When overlap or duplicate intent appears, apply unrelated clear edits first, then ask.
Offer concrete options when useful:
- Move one block.
- Shorten one block.
- Delete/cancel one block.
- Split one block around the other.
- Split parallel time between tasks.
- Keep the overlap only if the user confirms it is intentional.
Common patterns:
Visual Categorization
- Use Structured's built-in
symbol field for icons. Do not use emoji prefixes in task titles unless the user asks.
- Read
references/structured-icons.md when choosing icons.
- Use colors to make categories visually distinct, but do not hard-code a permanent category-to-color palette.
- Prefer continuity with the user's existing color habits on that day.
- If the day has no obvious pattern, choose distinct colors from the available palette:
day, dawn, sunshine, nature, forest, twilight, night, midnight, classic.
- After setting a
symbol, read the task back. Structured accepts only a curated subset of icon names; readback is the verification step.
Response Style
- Keep updates concise.
- If asking after partial updates, use this shape:
- "I updated X and Y."
- "I am unsure about Z because it overlaps/duplicates A."
- "Options: move A, shorten B, split the time, or keep both overlapping."
- Final response should list the resulting schedule and any unresolved questions.