Skip to main content
GitHub-Repository

eureka

eureka enthält 7 gesammelte Skills von jhlee0409, mit Repository-Berufsabdeckung und Skill-Detailseiten auf SkillsMP.

gesammelte Skills
7
Stars
0
aktualisiert
2025-12-21
Forks
0
Berufsabdeckung
4 Berufskategorien · 100% klassifiziert
Repository-Explorer

Skills in diesem Repository

domain-constants-config
Softwareentwickler

Manage centralized domain constants and configuration in the project. Use when adding new status types, modifying UI labels, updating color schemes, or creating configuration objects for domain entities.

2025-12-21
figma-design-parser
Softwareentwickler

Parse Figma design files into structured screen hierarchies. Use when working with Figma API, extracting text/labels from design nodes, traversing node trees, detecting cover frames, or parsing screen IDs (AUTO_0001, PSET_0002, etc.).

2025-12-21
gemini-ai-integration
Softwareentwickler

Integrate Google Gemini API for AI-powered QA checklist generation and structured output. Use when working with Gemini API calls, generating QA checklists from design specs, parsing AI responses, or implementing structured output with JSON schema.

2025-12-21
nextjs-localstorage-persistence
Webentwickler

Implement localStorage persistence in Next.js 14 App Router with SSR-safe patterns. Use when storing data in localStorage, handling hydration errors, implementing state persistence, or creating type-safe storage utilities.

2025-12-21
portal-dropdown-components
Webentwickler

Build React Portal-based dropdown, modal, and overlay components. Use when creating dropdown menus, select components, modals, tooltips, or any UI that needs to escape overflow containers. Includes positioning, scroll handling, keyboard navigation, and accessibility patterns.

2025-12-21
qa-workflow-manager
Softwarequalitätssicherungsanalysten und -tester

Manage QA test case workflows, status transitions, and verification checklists. Use when working with QA status states (Reviewing, DevError, ProdError, DevDone, ProdDone, Hold, Rejected, Duplicate), progress tracking (Waiting, Checking, Working, DevDeployed, ProdDeployed), activity logging, or test case management.

2025-12-21
wbs-gantt-management
Projektmanagementspezialisten

Implement WBS (Work Breakdown Structure) and Gantt chart functionality. Use when working with task scheduling, date range calculations, drag-and-drop timeline interactions, or project planning features.

2025-12-21