| description | Author, edit, and validate GridLAB-D .glm topology files for the smart meter simulator. Use when creating or modifying a grid topology (.glm), adding buses/lines/loads/PV, debugging "validate-topology" errors, fixing missing-bus / disconnected-graph / PV-not-mapped issues, or understanding which GLM object types and fields this backend's parser actually reads. |
Authoring GLM topologies for the simulator
This backend does not run GridLAB-D. It ships its own subset parser
(src/smart_meter_simulator/adapters/glm_converter.py) that turns a .glm file into the
neutral GridTopology model (core/topology.py) via
adapters/glm_topology_loader.py. Only the object types and fields listed below are read;
everything else in a real GLM file is silently ignored. Author to this parser, not to the
full GridLAB-D spec.
Reference model to copy from: src/smart_meter_simulator/data/grids/grid_bus_network.glm.
Workflow
- Edit / create the
.glm (use the patterns below).
- Validate before running:
uv run cli --mode validate-topology --grid-topology glm:<path-to>.glm
Prints a JSON summary() (num_buses, num_lines, num_pv, pv_capacity_kw,
static_load_kw, inferred substation) plus a validation block. Exit code 1 = invalid.
- Confirm the counts match intent (a typo'd object type just vanishes — no error).
- Point the simulator at it: set
GRID_TOPOLOGY=glm:<path> in .env, or pass
--grid-topology to uv run cli. Then uv run app.
Parser behavior (important constraints)
- Reads top-level
object { ... } blocks. module, clock, class blocks are skipped.
// line comments are stripped; #define X = val + ${X} expansion is supported.
- An object's identity fields are
name and parent (special-cased); all other
key value; lines become string properties. No type/unit checking — a misspelled
field name is just dropped.
- Object type → role mapping (anything else is ignored):
| role | accepted object types |
|---|
| bus | node, meter, substation |
| line | overhead_line, underground_line, triplex_line |
| line config | line_configuration (+ overhead/underground/triplex variants) |
| load | load |
| inverter | inverter, inverter_dyn |
| PV | solar |
Object recipes
Bus
object meter { // or node / substation
name "ref_lv_bus_1";
phases ABCN;
nominal_voltage 230.00;
}
- Slack/substation inference (
get_substation_bus): first match wins —
a bus named ref_lv_bus_1, sourcebus, or swing_bus; else any bus with
bustype SWING;; else the first bus declared. Name your reference bus accordingly or
you'll get a "No substation/slack bus could be inferred" warning.
Line
object overhead_line {
name "Line_0";
phases ABCN;
from "ref_lv_bus_35";
to "ref_lv_bus_36";
length 142.26;
}
from and to must reference existing bus names (else hard error).
- Impedance resolution order (Ω/km): explicit
resistance_ohm_per_km/reactance_ohm_per_km
on the line → same on the referenced configuration → *_ohm_per_mile (converted) →
averaged z11/z22/z33/z1/impedance (complex, see below) → generic r1/x1/
resistance/reactance. If none are present, the simulator falls back to the
LINE_RESISTANCE_OHM_PER_KM / LINE_REACTANCE_OHM_PER_KM env defaults.
- Length unit is parsed from the unit suffix inside the length value text (e.g.
length 100 ft;). A bare number has no unit and falls back to the LINE_LENGTH_UNIT env.
- Optional capacity:
capacity_kw / rating_kw / emergency_rating_kw.
Line configuration (optional, referenced by lines)
object line_configuration {
name "lc_default";
z11 0.642+0.083j ohm/km; // complex impedance; 'i' or 'j' accepted
impedance_length_unit km; // or impedance_unit; defaults to mile for configs
}
object underground_line {
name "Line_5"; from "a"; to "b"; length 0.3;
configuration "lc_default"; // <-- links the config in
}
Load
object load {
name "Load_0";
parent "ref_lv_bus_8"; // must be an existing bus
phases ABCN;
constant_power_A 2547.0+25.0j; // VA, complex (P + Qj)
nominal_voltage 230.00;
}
- Power is summed across
constant_power_A/B/C (or a single constant_power).
- Values are in VA / var, not kW. The summary divides by 1000 for
static_load_kw.
parent is required and must resolve to a bus, else hard error.
PV (two-object chain — order matters)
PV capacity is what feeds the meter generator's per-bus PV (PV_ON_EVERY_BUS,
pv_capacity_kw_by_node), so the chain must be intact:
object inverter {
name "PV_Inverter_ref_lv_bus_4";
parent "ref_lv_bus_4"; // inverter's parent = the BUS
rated_power 10000.0; // W -> 10 kW
inverter_efficiency 0.96;
}
object solar {
name "PV_ref_lv_bus_4";
parent "PV_Inverter_ref_lv_bus_4"; // solar's parent = the INVERTER
efficiency 0.20;
area 538.20 sf; // fallback sizing if no rated_power
}
- The bus a PV attaches to is found by walking
solar.parent → inverter → inverter.parent.
If the inverter is missing or its parent isn't a bus, the PV gets bus="" → hard error.
- Capacity_kw priority: inverter
rated_power (W÷1000) → solar rated_power (W÷1000) →
area × efficiency (area auto-converted from sf/sqft/ft^2 to m²; efficiency
default 0.20).
Transformer (optional — MV/LV or nested MV/MV units)
Couples two existing buses. from = primary (HV) terminal, to = secondary (LV).
Multiple transformers are supported (nested cascades and per-zone units); the single
external-grid slack auto-seats on the grid-edge HV bus (the HV terminal that is not any
transformer's LV side). When no transformer object is present the engine falls back to
the configured single feeder-head transformer (TRANSFORMER_*) above the substation bus.
object transformer_configuration {
name "xfmr_cfg";
connect_type WYE_WYE;
power_rating 500; // kVA -> sn_mva 0.5
primary_voltage 12700; // informational; the ratio comes from the bus vn_kv
secondary_voltage 240;
resistance 0.011; // per-unit R -> vkr% = R·100 = 1.1
reactance 0.020; // per-unit X -> vk% = |R+jX|·100
}
object transformer {
name "feeder_tx";
phases ABCN;
from "mv_src"; // HV bus (must exist)
to "ref_lv_bus_1"; // LV bus (must exist)
configuration "xfmr_cfg"; // links the config; omit to use TRANSFORMER_* defaults
}
- Voltage ratio is taken from the connected buses'
nominal_voltage (L-N ×√3 for 3-phase),
not from primary_voltage/secondary_voltage — size the bus voltages correctly.
- Missing
power_rating/resistance/reactance fall back to the configured
TRANSFORMER_SN_MVA/VK_PERCENT/VKR_PERCENT (and PFE_KW/I0_PERCENT).
- An HV tap is always created; the OLTC regulates the LV side when
TRANSFORMER_OLTC_ENABLED.
Validation rules (what validate() flags)
Errors (exit 1): no buses; duplicate bus name; line missing from/to or referencing a
nonexistent bus; load missing/nonexistent parent; PV with no resolvable bus; transformer
missing a terminal, referencing a nonexistent HV/LV bus, or with HV == LV.
Warnings (still exit 0): duplicate line name; duplicate transformer name; no inferable
substation; weakly-disconnected graph (nx.is_weakly_connected fails — usually an orphan bus
or a line endpoint typo; transformers count as graph edges so a transformer-only link keeps
the graph connected).
Quick debugging map
- "references missing bus" →
from/to/parent string doesn't exactly match a bus name.
- PV count is 0 / lower than expected → broken solar→inverter→bus chain, or
solar parented
directly to a bus instead of to an inverter.
static_load_kw looks 1000× off → you put kW where the parser expects VA.
- Lines exist but voltages look flat/wrong → no impedance on lines/configs, so the
LINE_* env fallbacks are being used; add resistance_ohm_per_km/reactance_ohm_per_km.
- Object silently absent from summary → object type not in the accepted set, or it's nested
inside a skipped