Project Spec
Generate a project specification from an outcome-focused prompt. The spec captures what the system must do and the qualities it must exhibit — not how to build it.
Output location
If the repository has an established location for specs or plans, use it. Otherwise, write the spec to .agents/projects/{name}.spec.md where {name} is a brief kebab-case identifier derived from the prompt. This aligns with the project-plan skill, which will write to a corresponding .plan.md file. Keep the spec self-contained — if supplementary content is needed, that's a sign the spec should be tightened rather than split.
Workflow
- Parse the prompt — identify the desired outcome, stakeholders, and domain context.
- Research — build understanding from both internal and external sources.
- Codebase: scan for existing patterns, constraints, and conventions that shape the problem space. Check
.agents/projects/ for existing specs that overlap.
- External: briefly check whether external sources add value. Skip if the domain is well-understood and codebase exploration already provided sufficient context. Look up authoritative information from external sources — prefer official docs, RFCs, and established references over informal sources. Validate assumptions, discover non-obvious constraints, and challenge the operator's framing.
- Draft the spec — use the section structure below. Write for a product manager audience: behavioral outcomes, not technical design.
- Assume over ask — when context allows a reasonable assumption, make it and document it. Reserve open questions for genuine ambiguity where multiple valid paths exist. If you must ask, include a recommended answer.
- Flag for review — mark decisions that need operator verification before planning can proceed (see Review flags).
- Present next steps — after writing the spec, briefly tell the operator what to review and how to proceed. Do not dump the entire spec contents back into the conversation.
Spec section structure
Problem
- Why this work matters. What pain or opportunity motivates it.
- Success signal — how you know this change solved the problem.
- The case against — why might we choose not to do this?
Stakeholders
Who is affected and what they need from this change. Distinguish primary actors from secondary beneficiaries.
Functional requirements
What the system must do. Write each as a behavioral outcome with measurable conditions folded in. No implementation detail. Number as FR1, FR2, etc. Include only requirements whose absence would materially change the outcome.
Non-functional requirements
Quality attributes the system must exhibit: performance, reliability, security, accessibility, observability. State measurable targets where possible. Number as NFR1, NFR2, etc. Include only attributes that carry real risk or differentiate the outcome.
Assumptions
Assumptions made during spec generation. These carry into planning — if an assumption is wrong, the operator should flag it before proceeding.
Downstream effects
Second-order consequences. Who is negatively affected — users, teams, system qualities. Apply the maintenance test: how does this change affect the product and your life as a maintainer in 6–12 months? Include only effects that would influence a decision to proceed or alter the approach.
Out of scope
What we are explicitly not doing. Include only items a reasonable reader might assume are in scope.
Open questions
Decisions that need operator input before planning can proceed. Number as Q1, Q2, etc. Each includes the question and a recommended answer with rationale as a sub-bullet.
Review flags
Mark decisions that need operator verification with ⚠️ **RF1** (<description>) inline in the section where the issue arises — a flag on an assumption goes in Assumptions, a flag on FR3 goes in Functional requirements. Number sequentially across the document (RF1, RF2, etc.). Unresolved RF markers block downstream workflows.
Use when context supports a direction but verification is warranted — "I went with X, confirm this." For genuine ambiguity where multiple valid paths exist, use open questions. Use sparingly; most uncertainties should be resolved via assumptions in the Assumptions section.
Examples
- Example 1 (
assets/example-1.md): Dark mode toggle with persistence and OS-sync. Demonstrates measurable NFRs, qualitative specificity, and tight out-of-scope.
- Example 2 (
assets/example-2.md): HTTP proxy with CDN caching. Demonstrates quantitative measurement methods, review flags, and open questions with recommendations.
Rules
- Behavior, not mechanism. "Users can toggle between light and dark themes" — not "Create a useTheme hook with useSyncExternalStore"
- Measurable where possible. "Pages load in under 2s on 3G" — not "Pages should be fast".
- Quantitative — state the measurement method, tool, or scenario. Unmeasurable requirements are not spec-ready: define the measurement or remove the requirement.
- Qualitative — ensure compliance is determinable without subjective judgment. Cite a standard, define concrete criteria, or describe structural specifics. Subjective terms ("intuitive", "clean", "user-friendly"): make specific or remove.
- Technical outcomes are acceptable for technical domains (e.g., "cache hit rate ≥ 95%"), but implementation is not (e.g., "use Redis with LRU eviction")
- Use requirement labels for cross-references. Refer to FR1, NFR3 rather than re-stating the requirement. This keeps discussion concise and unambiguous.
- Assume over ask. Document assumptions rather than querying the operator for answers that context can provide. Reserve open questions for genuine ambiguity.
- Research before assuming. Verify assumptions with a search before committing them — not guessing from convenience.
- Challenge the framing. If research reveals a flawed premise or suboptimal approach, say so and propose the alternative — not validate the prompt as-given.
- Remove resolved markers. When a review flag or open question is resolved, remove the marker entirely and capture the answer in the relevant section (Assumptions, Functional requirements, etc.) — not leave a resolved marker in place.
- Check existing projects in
.agents/projects/ before drafting to avoid duplication.