Skip to main content

critical-risk-manager

Use this skill when building or reviewing a bow tie risk assessment, defining a critical risk, assessing control (barrier) assurance, or scoring residual risk for NZ/AU workplace hazards. Triggers on "bow tie", "bowtie", "critical risk", "control assurance", "barrier", "top event", "barrier analysis", "threat", "consequence", "risk matrix", "residual risk", "escalation factor", "critical control". Builds the structured visual risk story for high-energy / fatal-risk hazards — crane lifts, confined space, working at height, chemical handling, traffic/mobile plant, electrical, dropped objects. Grounded in HSWA 2015 (NZ) and the WHS model law (AU). Use the bow tie structure here before starting any bow tie.

Zur Installation springen

Quellinformationen

Repository
scottmss/hse-nz-au-skills
Letzte Quellaktivität
2. Juli 2026 um 02:05
Erkannte Sprache von SKILL.md
Englisch
Sterne
0
Forks
1

Installationsoptionen

Standardmäßig ist der Prompt ausgewählt, der zuerst die Quelle prüft. Sie können zu einem direkten Befehl wechseln oder eine lokale Kopie herunterladen.

Quelldateien prüfen

Lesen Sie SKILL.md und alle von SkillsMP angezeigten Begleitdateien, bevor Sie sich für eine Installation entscheiden.