| description | Close the current sprint: verify all phases done, audit completed, post-audit E2E green, integration tests green, then update docs, commit, push, and wait for CI. Blocks if anything is off. Use when user says "close sprint", "finish sprint", "sprint done", "wrap up sprint", or when all phases are complete and it's time to finalize.
|
| allowed-tools | Bash, Read, Write, Edit, Grep, Glob, Agent |
Close Sprint
Finalize the current sprint. This is a gate — everything must be green or the sprint stays open.
Protocol
1. Find the sprint
Read docs/STATUS.md to find the active sprint. Then read sprint.md from docs/sprints/NNN-slug/.
If no active sprint — stop.
2. Checklist
Verify each item. If ANY fails — collect all failures, report them, and do not proceed.
2a. All phases complete
Every phase in sprint.md must be marked complete (✓). Check task files too — all must be done.
Blocker if: any phase or task is not done.
2b. Audit exists and was triaged
docs/audit.md must exist with a date AFTER the last phase was closed. Check the audit date vs the last phase completion date in docs/STATUS.md.
Blocker if: no audit, or audit predates last phase closure.
2c. Audit findings were handled
Sprint-relevant findings from the audit should have been addressed — either fixed in a refactor phase/task, or explicitly deferred to backlog with a note. Check that docs/BACKLOG.md has entries for deferred items if any were mentioned in docs/STATUS.md or sprint.md.
Blocker if: audit findings exist but there's no evidence they were triaged (no refactor phase, no backlog entries, no notes in sprint.md).
2d. Post-audit E2E is green
There must be an E2E report in docs/e2e-reports/ dated AFTER the audit. The report must have zero blockers.
Blocker if: no post-audit E2E report, or report has blockers.
2e. Integration tests pass
make test-integration 2>&1 | tee /tmp/integration-test-output.txt
ANY failure is a hard blocker — no exceptions. This includes tests unrelated to the sprint, pre-existing failures, and flaky tests. A failing test means something is wrong, and we fix it before closing.
If tests fail:
- Read from file. Analyze
/tmp/integration-test-output.txt — never re-run just to see different output.
- Full investigation. For each failing test: read the traceback, the test code, and the production code. Determine root cause.
- Fix on the spot. Whether the failure is from our changes or pre-existing — fix it:
- Flaky tests: find the race condition, make the test deterministic. "It passes sometimes" is not acceptable.
- Pre-existing bugs: fix the bug or fix the test if the test is wrong.
- Our regressions: fix the code.
- Re-run until all green. Repeat until 0 failures.
- If a fix is non-trivial (>15 min) or unclear — stop, report to the user with full diagnosis, and block the sprint.
Blocker if: any test fails and cannot be fixed.
3. If blocked
Quick fixes allowed
If a blocker is clearly a small bug fixable in <5 minutes (flaky test, trivial code fix, missing import), fix it inline, re-run the failing check, and continue. Note the fix in the commit message.
Serious blockers
If a blocker requires significant work (new phase, architecture change, multiple files):
Sprint NNN cannot be closed. Blockers:
1. <blocker description>
2. <blocker description>
...
Fix these and try again.
Do NOT commit or push when serious blockers remain.
4. If all green
4a. Update docs
Run /update-docs full — full deep review, not incremental. A sprint accumulates changes across many phases; incremental mode would only see commits since the last mid-sprint run and miss earlier changes.
CRITICAL: If /update-docs launches background subagents (for parallel research), you MUST wait for ALL of them to complete and review their findings BEFORE proceeding to step 4b. Do not commit or push while subagents are still running — their results may reveal doc gaps that need fixing. After all agents return, review each agent's findings, apply any missed updates, and only then continue.
4b. Fill in sprint results
Update sprint.md Results section:
## Results
**Completed:** <date>
<Brief summary: what was built, key metrics (tests added, files changed), notable decisions or discoveries.>
**Deferred:** <list items that were punted to backlog, if any>
4c. Update docs/STATUS.md
Move the completed sprint to the Sprint History table, refresh the header (Last updated, Position, Next, Blockers), and set the current sprint section to empty or the next sprint if one is planned:
**Last updated:** <today>
**Position:** <where the project sits on the ROADMAP ladder after this sprint>
**Next:** <next sprint candidate, or "активного спринта нет" + top BACKLOG `must` items>
**Blockers:** <none, or list>
## Current Sprint
No active sprint.
## Sprint History
| Sprint | Goal | Started | Completed |
|--------|------|---------|-----------|
| NNN-slug | <goal> | <started> | <today> |
| ... previous sprints ... |
Also leave an explicit closure marker while the remote gate is unresolved:
**Closure:** Ждём завершения CI для `sprint/NNN-slug`.
This marker is pipeline state, not a prose note. It must be committed in the sprint PR. Do not replace it
with "closed", remove it, or start another sprint until the required CI checks and merge result are known.
4d. Commit, push the branch, open the PR
The sprint ran on its own branch (sprint/NNN-slug, created by /new-sprint). Close it by opening a PR into main with auto-merge — CI is the gate, not a human.
git add docs/ CLAUDE.md ARCHITECTURE.md README.md src/dnd_simulator/**/__init__.py
git commit -m "sprint NNN: close — <goal summary>"
branch=$(git branch --show-current)
git push -u origin "$branch"
gh pr create --base main --head "$branch" \
--title "sprint NNN: <goal summary>" \
--body "<sprint summary + key metrics; note it was produced autonomously>"
gh pr merge "$branch" --auto --merge --delete-branch
--auto lands the PR on main automatically once the required CI checks pass — no human approval (branch protection requires the checks, not a reviewer). If CI fails, the PR stays open and main is untouched: that is the gate doing its job. After this, return to a clean base for the next sprint: git checkout main (the merge lands on remote main asynchronously; the next /new-sprint fast-forwards local main).
Note: Do NOT stage .claude/skills/update-docs/state.json here — it is committed by the /update-docs skill itself in step 4a.
This is the only skill that pushes. Opening the auto-merge PR is not the end of the step.
4e. Monitor CI through merge
After enabling auto-merge, start a monitor and keep working until every required check reaches a terminal state.
Do not end the turn while checks are queued or in progress.
Use gh pr checks <number> --watch --interval 10 in a background process with output redirected to
/tmp/sprint-NNN-ci.log, or an equivalent recurring monitor. Poll it at least once per minute and keep the
user informed. Also inspect gh pr view <number> --json state,mergedAt,mergeStateStatus,statusCheckRollup,url;
checks being green is insufficient if the PR did not merge.
- If every required check succeeds, wait until the PR state is
MERGED, then report closure. Leave the
Closure marker for the next /go reconciliation, which verifies the remote result independently and
clears the marker on main.
- If any required check fails, is cancelled, or times out, stop the monitor and escalate to the operator with
the PR URL, failed check names, and log URLs. Do not claim the sprint is closed, do not remove the marker,
and do not start unrelated fixes without operator direction.
- If auto-merge is disabled or the PR remains open after all checks succeed, escalate that merge-state problem
to the operator instead of finishing silently.
5. Report
Sprint NNN — <Title>: CLOSED
Phases: N completed
Tests: integration green, E2E green
Docs: updated
CI: all required checks green
PR: merged to main