| description | Use when an architect must run the detailed-design portion of technical design, preserve the full lifecycle-stage doctrine for detailed design, and define the concrete runtime, project, flow, data, interface, non-functional, security, recovery, hardware, and implementation-plan surfaces needed for execution. |
| version | 1.2.0 |
| author | Architect Skill Pack |
| license | MIT |
| metadata | {"hermes":{"tags":["architect","lifecycle","technical-design","detailed-design","implementation"],"related_skills":["arch-lifecycle-delivery","arch-lifecycle-tech-detailed-technical-arch-diagramming","arch-lifecycle-tech-detailed-core-flow-diagramming","arch-lifecycle-tech-overview-methodology"]}} |
Technical Detailed Methodology
Overview
This skill serves the architect role's 技术方案设计 → 详细设计 方法论 skill.
It is the second half of technical design and should only start on top of a stable overview design.
The detailed-design stage is now intentionally kept leaner:
- keep separate specialist companion skills only for the two highest-value recurring artifact classes
- keep the other detailed-design surfaces inside this methodology skill as part of one integrated detailed-design packet
That keeps the live skill family clearer and avoids over-splitting the stage into too many tiny children.
When to Use
Use when:
- solution design and overview design have already been reviewed
- the architect must define concrete technical realization surfaces for implementation
- the task is about 技术架构、项目架构、关键流程、数据结构、接口、非功能需求、安全、备份恢复、风险、硬件、实施计划
Canonical Stage Doctrine (Full Preservation)
| 详细设计 | 技术架构 | 系统设计中的功能通过什么技术栈实现?如何选型的?项目结构是什么样的?
系统运行起来后,服务、进程、任务、调用链路如何协作,稳定性如何保障?
依赖与组件等实现方式,基于需求调研中得到的业务解决方案,合理利用技术栈、工具链、中间件的组合、以实施落地为目的对该业务方案进技术细化
| 技术架构图,示例如下:
|
| | 项目架构 | 代码、模块、组件、依赖如何组织,如何保证可维护性与可扩展性?
项目结构、模块分层、组件依赖、技术选型说明 | 项目架构图 |
| | 关键流程 | 有哪些关键业务流程?通过什么图表来体现?
不同角色不同阶段的处理过程,以及各种分支情况的条件及处理逻辑,要覆盖所有流程分支,不重不漏 | 状态机,示例如下:
流程图,示例如下:
|
| | 数据结构 | 程序中流转的数据是怎么定义的? | |
| | | 与外部系统交互的接口数据是怎么定义的? | |
| | 数据架构 | 需要什么样的数据、如何存储与使用?
*存储到数据库中的表结构定义,主键、字段类型、字段含义、唯一键、索引等 * | ER图(drawio-skill / draw.io 源文件) |
| | | 数据一致性、唯一性、索引设计、冷热分层、归档清理、备份恢复、敏感数据保护如何设计? | 数据约束说明 |
| | 系统接口 | 对外接口如何定义? 入参、出参、幂等、异常、结果码、超时、重试、限流、鉴权、审计要求 | 接口定义文档 |
| | 非功能性需求 | 有哪些系统监控、业务监控、数据监控需求?核心指标、告警阈值、通知方式、响应人、处理时限分别是什么? | 监控告警清单 |
| | | 吞吐、延迟、并发、容量目标分别是什么?压测口径、验收标准是什么? | 性能指标与压测方案 |
| | | 是否需要限流、熔断、降级、隔离、容灾、扩缩容能力?故障时如何保证核心服务可用? | 高可用方案 |
| | | 鉴权、授权、数据脱敏、密钥管理、审计留痕、防刷、防重、防越权分别如何设计? | 安全设计说明 |
| | | 需要备份哪些数据?恢复点目标(RPO)与恢复时间目标(RTO)是什么?恢复流程如何验证? | 备份恢复方案 |
| | | 当前已知风险有哪些?触发条件、影响范围、预防措施、应急预案分别是什么? | 风险清单 |
| | 硬件需求 | 需要哪些、什么样的硬件部署服务? 硬件、网络、机器、节点、拓扑等 | |
| | 实施计划 | 人力安排、团队配置、开发周期、测试周期、联调周期等细项 | |
Architect Execution Layer
- make the system implementable, not only understandable
- keep runtime structure, code structure, dynamic flows, data structures, interfaces, and NFR controls distinguishable
- use separate artifacts when one view cannot answer all detailed questions cleanly
- do not hide reliability, recovery, or security assumptions in vague prose
Recommended Detailed-Design Packet
Keep as separate specialist skills
These two are worth separate live skills because they are recurring, visually intensive, and easy to confuse with neighboring artifact types:
arch-lifecycle-tech-detailed-technical-arch-diagramming
arch-lifecycle-tech-detailed-core-flow-diagramming
Keep inside this methodology skill
These usually do not need separate live skills by default unless a future workload proves they recur independently often enough:
- 项目架构
- 数据结构 / 数据架构
- 系统接口
- 非功能性需求
- 安全 / 高可用 / 备份恢复 / 风险
- 硬件需求 / 实施计划
Reason:
- they are important surfaces
- but they are often better handled as one integrated detailed-design packet than as many tiny sibling skills
- splitting them too far makes the family harder to load and reason about
Practical Subsections To Cover Inside This Stage
1. 项目架构
Answer:
- how code / modules / components / dependencies should be organized
- how maintainability and extensibility are protected structurally
2. 数据结构 / 数据架构
Answer:
- what data objects move through the program
- what external interaction structures look like
- what persistent structures exist
- what consistency / indexing / archival / backup / sensitive-data rules apply
2A. Cross-module boundary tightening rules (high-value review TODO pattern)
When iterating a subsystem detailed-design document from reviewer TODOs, do not only “answer the comment”; use the TODO to check whether a diagram, object, or flow leaked across module boundaries.
Default tightening rules:
- if a flow is documenting ETL / pipeline execution, keep query/read-definition concerns out of that flow unless the query layer is a direct runtime participant
- if a release / rollback diagram is about family-definition or pipeline-definition switching, name the downstream runtime precisely (for example, later pipeline batches / replay batches) rather than a vague cross-layer label like “query layer”
- if a control-plane object belongs to a higher module, move it back to that module’s document instead of letting the current module absorb it “for completeness”
- when a reviewer says “this looks like a higher-layer concern”, prefer scope reduction over adding more explanatory arrows
Typical examples worth preserving:
Family Definition onboarding / release belongs to the ETL / pipeline side; Read API Definition belongs to the query-serving side unless the current module truly governs both
- a subsystem-level detailed design may mention adjacent layers for context, but its dynamic diagrams should still track the module that actually executes the path
2B. Transport envelope vs external payload-reference rule
Do not default queue/event examples to payload_ref object-storage indirection.
Prefer this order:
- first design the collector / batcher so one queue message stays within the transport limit
- keep the real payload inline in the event envelope when that is operationally reasonable
- use a separate object-reference indirection only as an explicit oversized-payload exception path, not as the default shape
Why:
- it keeps the transport contract simpler
- it avoids inventing a second truth hop for ordinary messages
- it makes replay, inspection, and definition onboarding examples more concrete
If inline payload is chosen, still carry a digest / stable id for idempotency and audit.
2C. Analytical replica sync modeling rule
When a local or edge analytical replica can connect directly to the upstream warehouse, model the sync path as a thin sync executor/config layer first; do not over-design exporter/importer/file-hop stages unless they are actually required.
Preferred expression in detailed design:
- state clearly whether the replica is full snapshot or incremental
- state exactly which upstream layers/tables are mirrored (for example raw + stage + governed views)
- keep the executor role thin: credentials injection, attach/config, sync SQL/materialization, watermark recording
- keep the replica out of the public serving hot path unless it is truly the serving backend
3. 系统接口
Answer:
- inputs / outputs
- idempotency
- exceptions / result codes
- timeout / retry / rate-limit
- auth / audit requirements
4. 非功能性需求 / 安全 / 可靠性 / 恢复
Answer:
- monitoring / alerting
- throughput / latency / concurrency / capacity
- HA / resilience / degrade / isolation / DR
- authz / authn / masking / key management / audit
- backup / RPO / RTO / restore validation
- known risks and emergency handling
5. 硬件需求 / 实施计划
Answer:
- hardware / network / machine / node / topology assumptions
- staffing / team configuration
- development / testing / integration schedule details
Companion Diagram / Artifact Skills
arch-lifecycle-tech-detailed-technical-arch-diagramming
arch-lifecycle-tech-detailed-core-flow-diagramming
Practical handoff pattern: overview design → detailed design packet
When a subsystem already has an approved/usable 概要设计 and the next user ask is “start detailed design now”, prefer this execution order:
- Read the overview design first and inherit its fixed boundaries.
Do not rediscover the system from scratch unless the overview is clearly unstable.
- Check whether the target directory already contains child-module detailed-design placeholders.
If they exist but are empty or near-empty, do not rush to fill all child docs first.
- Write a subsystem-level detailed-design hub document first.
This hub should answer the cross-module questions that implementation cannot avoid:
- runtime technical architecture
- main data/control flows
- core objects / envelopes / enums and their execution semantics
- upstream/downstream integration list
- auth / connection paths
- NFR / rollback / observability / recovery baseline
- Co-locate the key diagrams with that hub document first.
At minimum, produce:
- 技术架构图
- 核心流程图
Add state/data-flow views only when they reduce ambiguity.
- Only after the hub stabilizes, split into child module detailed-design docs.
This avoids writing four inconsistent module docs while the shared runtime model is still moving.
- When landing child docs into pre-created module folders, use explicit artifact names and migrate links cleanly.
Preferred pattern:
- place each child doc inside its module directory
- name it as
<module>-详细设计文档 when the workspace/user wants the artifact level made explicit
- update the subsystem hub note to point to the new canonical child-doc names
- leave the old bare-name placeholder note as a tiny redirect/stub instead of keeping an empty file or duplicating content
Why this pattern works:
- it preserves implementation-level concreteness without fragmenting the design too early
- it keeps shared contracts and runtime semantics in one place first
- it gives later module docs a stable parent packet to inherit from
- it avoids broken wiki links and avoids confusing a folder placeholder with the real module-level detailed-design artifact
Runtime-backed product/control-plane mapping rule
When the product being detailed is not the runtime itself, but a business/control plane built on top of a mature runtime or web-console base, the detailed-design packet must explicitly contain two distinct layers:
PRD / prototype demotion rule for this class of design
When a runtime-backed product already has:
- business-solution documents,
- overview technical design,
- and PRD / prototype materials,
treat them with a strict priority order for detailed design:
- business solution + overview design define server-side truth, runtime boundaries, and object ownership
- verified code / runtime entry points define what is actually reusable and callable
- PRD / prototype is used only to check page completeness, user-visible flows, and whether major product-facing capabilities were missed
Do not directly lift PRD/prototype material such as:
- pseudo backend endpoints
- page-level field dictionaries
- speculative table names
- mock implementation notes
- page interaction wording that pretends to be runtime truth
into the detailed-design server contract unless that information is independently validated by the business solution, overview design, or code.
Safe use of PRD in detailed design:
- use it to verify functional-domain coverage
- use it to discover missing user-visible states or pages that the design has not yet explained
- use it to pressure-test whether the control-plane objects are complete
Unsafe use of PRD in detailed design:
- treating PRD example fields/interfaces as authoritative backend design
- allowing prototype/UI terms to silently redefine runtime objects
- letting page-level implementation hints override the already-approved server-side architecture
Review heuristic:
- if a detailed-design paragraph can no longer answer "which higher-level design or verified runtime fact makes this true?", it is probably PRD leakage and should be rewritten or removed.
Reviewer-TODO handling rule for architecture/design documents
When the user reviews a design document and leaves inline TODO comments, do not only answer whether the comment is "reasonable". Classify each TODO into one of these buckets before changing the document:
- runtime truth correction — the current text conflicts with verified runtime/code behavior
- layering correction — the current text collapses Team Panel / Gateway / Runtime boundaries
- object-model clarification — two objects or flows are under-specified and need sharper semantics
- terminology correction — a name is misleading relative to the runtime mapping
- business binding correction — a business object is being incorrectly equated with an execution object or workflow
For each TODO, prefer the smallest fix that restores the correct layer boundary. In particular, be suspicious when:
- browser/WebUI internal endpoints are described as if they were the formal Team Panel -> Gateway contract
- external message-platform group-chat ingress is conflated with browser-native team collaboration
- a business solution object (for example an industry solution) is treated as identical to an execution workflow instead of a blueprint that may bind a collaboration template
- PRD-origin terms are used where the runtime-backed object model should be named instead
- Team Panel / control-plane layer
- complete functional-domain inventory
- business objects and ownership boundaries
- product-facing flows, states, and governance semantics
- Gateway / runtime-mapping layer
- how each business object maps to a concrete runtime object, file, task, session, job, or SDK entry point
- which parts are direct reuse vs extension vs net-new build
Minimum coverage rule for this class of detailed design:
- for each functional domain, list the required feature points, not just the module name
- for each business object, state its control-plane truth, runtime counterpart, and the mapping rule between them
- cover both:
- static mapping — e.g. employee -> profile, connector grant -> credential/env injection, skill grant -> skill/runtime visibility
- dynamic mapping — e.g. private chat -> single-agent run entry, orchestration task -> kanban task + dispatcher path, loop mission -> cron job
- name the real backend/code entry points from source verification, not README-level inference
- classify every mapping as:
- existing directly reusable
- reusable with extension
- must be newly built by the product layer
This rule is especially important when a mature web UI already exists. Do not collapse:
- the web workbench shell
- the product's business objects
- the gateway/runtime adapter
into one blurred module just because the code lives in one repo.
Canonical document placement rule
When writing design documents inside an existing project/vault/repo, land the artifact in the project's canonical design path first. Do not draft into ad-hoc temp locations and report completion there unless the user explicitly asked for a scratch copy.
Default behavior:
- detect the project's real design/document directory first
- write the formal artifact to that canonical path
- if permission or tooling constraints force a temporary draft elsewhere, copy it into the canonical destination before claiming completion
- when both a scratch copy and canonical file exist, clearly state which one is authoritative
This prevents a common architect failure mode: doing the thinking correctly but leaving the team looking at the wrong file.
See also references/runtime-backed-product-mapping.md for a concrete pattern covering business-object -> runtime-object mapping on top of an existing runtime/web-console base.
Diagram Set Selection Rule
Detailed design should not default to one big diagram plus prose.
Choose the minimum diagram set that removes implementation ambiguity:
- 技术架构图 for stable runtime structure, control plane vs execution plane, and major storage/query boundaries
- 核心流程图 for the main happy path and key exception branches
- 时序图 when reviewers need actor-by-actor ordering, timing, or lifecycle visibility across components
- 数据流 / 对象关系图 when confusion is really about what objects exist, which layer owns them, and how they move
- 状态机 / 回滚图 when correctness depends on state closure, active-version switching, compensation, or rollback semantics
Rule of thumb:
- if a reviewer could ask “but in what order do these components actually talk?” → add a sequence diagram
- if they could ask “what data/object is flowing here?” → add a data-flow/object relation diagram
- if they could ask “how does version switch / rollback actually close?” → add a state or rollback-focused diagram
Do not wait for the user to explicitly request each companion diagram when the ambiguity is predictable.
Child-module detailed-design companion-diagram rule
When a subsystem-level detailed-design hub document already contains the top-level technical architecture, core flow, release/rollback, and data/object relationship visuals, do not mechanically duplicate a “技术架构图” inside every child-module detailed-design note.
Instead, choose child-module diagrams by the specific implementation ambiguity they remove:
- if the module risk is step order / actor sequencing, add a module-level sequence diagram
- if the module risk is internal stage boundaries / branch closure, add a module-level flowchart or state/closure diagram
- if the module risk is object ownership / truth-vs-replica layering, add a module-level data-flow or layered object diagram
- only add a child-module technical-architecture diagram when the module truly has enough internal runtime structure to justify its own stable architecture view
Default anti-pattern to avoid:
- one subsystem hub has a good top-level architecture diagram
- then every child module gets another smaller architecture diagram that repeats the same planes with renamed boxes
- result: visual duplication rises, but implementation ambiguity remains
Preferred child-module diagram choices by common module type:
- collector / ingress modules: collection-to-enqueue control flow, checkpoint/state-advance gates, oversize/failure closure
- pipeline / execution modules: single-item sequence diagram plus internal stage-flow / branch diagram
- query / serving modules: hot-path sequence/flow plus cold-path refresh/control-path diagram
- storage / replica modules: layered ownership / truth-store vs serving-store vs replica diagram
Fast review test:
- if the child-module figure still reads mostly like a reduced copy of the subsystem architecture, it is probably the wrong diagram
- if the figure lets an implementer answer “who runs first, where does version freeze, where does failure stop, which store is truth, which path is hot vs cold” in ~30 seconds, it is likely the right child-module companion artifact
Naming Boundary For Detailed Design Artifacts
When the deliverable is a system-level detailed design document, name it as the system/subsystem detailed design artifact itself (for example XX详细设计方案) rather than a lower-level working label such as “子模块设计”.
Reserve names like “子模块设计” for true module-collection indexes, not for the canonical subsystem-level detailed design document.
Common Pitfalls
-
Over-splitting detailed design into too many tiny skills.
The detailed stage has many surfaces, but not every surface deserves its own always-live specialist skill.
-
Reusing overview-level abstractions as if they were sufficient for implementation.
Detailed design must be concrete enough to guide execution.
-
Treating NFR/security/recovery as optional appendices.
These are part of the real design, not postscript polish.
-
Stopping after one general flow diagram.
When time-order, object ownership, or rollback semantics are central, one high-level flowchart is not enough.
-
Delivering only one generic flowchart for a subsystem detailed design.
A subsystem-level detailed design often needs more than one visual artifact. Do not wait for the user to explicitly ask for sequence/data-flow/release-flow diagrams if the text still leaves runtime order, control-plane behavior, or object boundaries ambiguous.
-
Naming the subsystem detailed-design master note too generically.
For vault/document delivery, prefer the canonical artifact name 《<子系统名>详细设计方案》 for the subsystem-level detailed-design master document. Do not publish the main detailed-design document under a generic working name such as 子模块设计 unless the user explicitly asked for that as a folder/index, because it confuses the artifact's level and role.
Diagram Completeness Rule For Detailed Design
When writing a subsystem-level detailed-design document, proactively decide whether the packet needs companion diagrams beyond the top technical architecture figure. Use this default test:
- if the reader may ask "运行时先后顺序是什么" → add a sequence diagram
- if the reader may ask "控制面对象和运行时对象怎么衔接" → add a data/object-flow diagram
- if the reader may ask "发布、切版本、回滚怎么发生" → add a release/rollback sequence or flow diagram
- if one core flow chart cannot answer all three cleanly, split the visuals instead of overloading one figure
This is a default architect responsibility, not an optional embellishment to wait for user prompting.
Verification Checklist
Verification Checklist