Writing Plans
Use this skill to turn requirements or an approved design into an implementation plan.
Relationship To Context Skills
When the work is tracked in .my-context/tasks/, use context-task alongside this skill.
- read the task goal from
task.md
- use
notes.md for task-specific research and constraints
- write the resulting plan to
plan.md
When prior project decisions or non-obvious history may matter, use context-memory before finalizing the plan.
When to Use This Skill
Use this skill when:
- The work has multiple steps or checkpoints
- The user wants a plan before implementation
- The task spans several files or responsibilities
- The requirements are clear enough to sequence into execution tasks
Do not use this skill for tiny, direct edits that can be implemented safely without separate planning.
Core Principles
- Plan against the real codebase, not an imagined structure
- Make tasks small enough to verify independently
- Keep the plan concrete: exact files, responsibilities, and validation steps
- Prefer the smallest correct implementation
- Follow existing project patterns unless there is a strong reason not to
Workflow
1. Confirm Inputs
Before writing the plan, make sure you have:
- The approved goal or requirements
- Enough codebase context to know where the change belongs
- A reasonable task boundary
If a .my-context task exists for the work, read task.md first. If research notes already exist, read notes.md too.
If the request is too broad, split it into smaller plans.
2. Map the File Structure
Before listing tasks, identify:
- Which files will likely change
- Which new files may be needed
- What responsibility each file should have
Prefer focused responsibilities and clear interfaces. Avoid unnecessary restructuring.
If there may be relevant prior decisions, architecture notes, or durable discoveries, check context-memory before locking the file map and task boundaries.
3. Break Work Into Tasks
Each task should:
- Produce a meaningful, testable checkpoint
- Have a clear scope
- Include the files involved
- Include how the result will be verified
Good task boundaries usually separate:
- setup or scaffolding that enables later work
- core behavior changes
- UI or integration wiring
- tests and validation
- documentation or follow-up cleanup when needed
4. Make Each Task Concrete
For each task, include:
- Task name
- Goal
- Files to create or modify
- Main implementation steps
- Validation steps
- Risks or dependencies if they matter
Use exact file paths whenever you know them.
5. Include Verification
Every plan should say how to verify progress.
Examples:
- Run a focused test file
- Run the relevant lint command
- Exercise the feature manually
- Verify a specific regression case
6. Review the Plan in Isolation
After drafting the plan, send it to the plan-reviewer agent for a read-only review pass.
Give the reviewer:
- The plan path or plan content
- The original requirements or approved design
- Any project-wide constraints
- Any areas you are uncertain about
Use the review to catch:
- missing requirements
- oversized or poorly ordered tasks
- vague steps or placeholders
- weak validation steps
- unnecessary scope
Fix the plan before presenting it as ready.
If the plan belongs to a .my-context task, keep plan.md as the current source of planning truth rather than leaving the plan only in transient conversation history.
Suggested Plan Format
# <Feature Name> Implementation Plan
**Goal:** <one-sentence outcome>
**Context:** <key codebase or product constraints>
## File Map
- Modify: `path/to/file.ts` - <responsibility>
- Create: `path/to/new-file.ts` - <responsibility>
## Tasks
### Task 1: <name>
**Goal:** <what this task delivers>
**Files:**
- Modify: `path/to/file.ts`
- Create: `path/to/test.ts`
**Steps:**
1. <concrete action>
2. <concrete action>
3. <concrete action>
**Verify:**
- Run: `<command>`
- Expect: <result>
### Task 2: <name>
...
Quality Bar
Do not write plans with placeholders like:
- TBD
- TODO
- implement later
- add tests
- handle edge cases
Replace vague instructions with explicit actions.
Self-Review
After writing the plan, check:
- Does every requirement map to a task?
- Are task boundaries small enough to verify?
- Are file paths and ownership clear?
- Are validation steps specific?
- Did you avoid unnecessary scope?
Fix obvious gaps inline before sending the plan to plan-reviewer.
After plan-reviewer returns findings:
- Apply needed fixes to the plan
- Re-check for consistency after the edits
- Present the revised plan to the user
Handoff
When the plan is complete:
- If the work is tracked in
.my-context/tasks/, write or update plan.md through context-task
- Present the plan clearly to the user
- Mention that it has already passed through
plan-reviewer
- Ask whether they want changes before implementation
- If approved, switch to implementation or the relevant execution workflow