| metadata | {"phase":"03-planning","inputs":["task-list","dependency-graph","architecture-doc"],"outputs":["risk-register"],"prerequisites":["pc-task-breakdown"],"quality_gate":"Material delivery risks are identified, prioritized, and paired with concrete mitigation or sequencing decisions","roles":["tech-lead","architect","devops-engineer"],"methodologies":["all"],"effort":"medium"} |
Risk Assessment
Make delivery risk visible before it becomes schedule surprise or production pain.
Context
Risk assessment identifies what could derail the plan and what the team will do about it.
See context and anti-pattern notes.
Inputs
I/O contract notes define required inputs and authority.
Process
Step 1: Identify Risk Categories
Scan for risks in at least these buckets:
- architecture or design uncertainty
- dependency and coordination risk
- migration or coexistence risk
- operational or rollback risk
- security or compliance exposure
Step 2: Score What Matters
For each material risk, record:
- likelihood
- impact
- earliest point of detection
- mitigation or contingency
- owner
Do not clutter the register with trivialities. Focus on risks that could change sequence, scope, or release posture.
Step 3: Convert Risk Into Planning Action
A risk register is only useful if it changes something. For each high or medium risk, decide whether to:
- change the order of tasks
- add a spike or validation step
- reduce scope
- add contingency or observability
- defer commitment until a dependency clears
Step 4: Hand Off a Live Risk Register
Make the register concrete enough that estimation, sprint planning, and later retrospectives can reuse it. If a risk is accepted, that acceptance should be explicit.
Outputs
Produce only declared outputs at their documented quality boundary.