Project Status
Track project progress, metrics, milestones, and generate comprehensive status reports for stakeholders and team members.
When to Use This Skill
Trigger when user says:
- "project status"
- "how is [project] doing"
- "progress report"
- "project metrics"
- "what's the status"
- "generate status report"
Best for:
- Project tracking and monitoring
- Stakeholder updates
- Sprint retrospectives
- Progress reporting
- Milestone tracking
- Resource allocation
Tier 1: Guided Tracking (Beginner)
Project Overview
Create Project
Let's set up a new project:
**Project Name:** [Project name]
**Description:** [Brief description]
**Start Date:** [When project started]
**Target End Date:** [When project should finish]
**Status:** Planning | In Progress | On Hold | Completed | Cancelled
**Team Members:**
- [Name] - [Role]
- [Name] - [Role]
**Key Milestones:**
1. [Milestone name] - [Target date]
2. [Milestone name] - [Target date]
3. [Milestone name] - [Target date]
Project Template
# [Project Name]
**Status:** [Current status]
**Start Date:** [date]
**Target Completion:** [date]
**Actual Completion:** [date or N/A]
**Progress:** [X]%
## Description
[Brief project description and objectives]
## Team
- [Name] - [Role]
- [Name] - [Role]
## Milestones
- [ ] [Milestone 1] - [Target date] - [Status]
- [ ] [Milestone 2] - [Target date] - [Status]
- [ ] [Milestone 3] - [Target date] - [Status]
## Recent Updates
- [Date]: [Update]
## Current Focus
[What's being worked on now]
## Blockers
[None or list of blockers]
## Next Steps
- [ ] [Next step]
- [ ] [Next step]
Update Project
Update project progress:
**Project:** [Which project]
**Update Type:** Status | Progress | Milestone | Blocker | Team | Next Steps
**Details:**
[Specific update information]
**Impact:**
[How this affects the project]
Tier 2: Confident Reporting (Intermediate)
Structured Status Reports
Daily Project Status
# Daily Project Status - [Date]
## 📊 Project: [Project Name]
**Overall Status:** 🟢 On Track / 🟡 At Risk / 🔴 Behind Schedule
**Progress:** [X]% complete ([days] days elapsed / [total] days total)
**Completion Date:** [Target date] (on track / [days] ahead / [days] behind)
---
## ✅ Completed Today
- [Task completed]
- [Task completed]
## 🎯 In Progress
- [Task 1] - [Owner] - [X]% complete
- [Task 2] - [Owner] - [X]% complete
## ⏰ Upcoming (Next 7 Days)
- [Task] - [Due date]
- [Task] - [Due date]
## 🚧 Blockers
1. **[Blocker]** - [Owner]
- **Impact:** [description]
- **Resolution:** [plan]
## 📈 Metrics
- **Tasks Completed:** [count] / [total]
- **Tasks in Progress:** [count]
- **Tasks Blocked:** [count]
- **Velocity:** [tasks per day avg]
## 💬 Notes
[Additional notes, updates, announcements]
Weekly Status Report
# Weekly Project Status - [Week of]
## 📊 Executive Summary
**Project:** [Project Name]
**Status:** 🟢 On Track / 🟡 At Risk / 🔴 Behind Schedule
**Completion:** [X]% complete
**ETA:** [date] ([days] ahead/behind schedule)
---
## 📈 Progress This Week
**Completed Tasks:** [count]
**Tasks Completed:** [list of major completions]
**Milestones Achieved:**
- [ ] [Milestone] - [Date achieved]
**Velocity:** [tasks per day] ([+X%/-X% vs last week])
---
## 🎯 Focus for Next Week
**Priority Items:**
1. [Task] - [Owner] - [Due date]
2. [Task] - [Owner] - [Due date]
3. [Task] - [Owner] - [Due date]
**Upcoming Milestones:**
- [Milestone] - [Target date] - [Status]
---
## 🚧 Blockers & Risks
**Active Blockers:** [count]
- [Blocker] - [Days active] - [ETA]
**Risks Identified:**
1. [Risk] - [Likelihood] - [Impact]
- **Mitigation:** [plan]
---
## 📊 Metrics Dashboard
**Progress:**
[██████████░░░░░░░░░░░░░] 40%
**Burn Chart:**
Tasks
60 | ●
50 | ● ●
40 | ● ●
30 | ● ●
20 |● ●
10 |●●●●●●●●●●●●●●●●●
|___________________
M T W T F M T
Week 1 Week 2
**Task Distribution:**
- ✅ Completed: [count]
- 🔄 In Progress: [count]
- 📋 Planned: [count]
- 🚧 Blocked: [count]
---
## 💡 Insights & Recommendations
**What's Going Well:**
- [Observation]
- [Observation]
**Areas of Concern:**
- [Concern] - [Impact]
**Recommendations:**
- [Action item]
- [Action item]
---
## 📝 Notes & Announcements
[Additional information]
Milestone Tracking
Milestone Template
milestones:
- id: M1
name: "Design Complete"
description: "All design assets and specifications finalized"
target_date: date
actual_date: date or null
status: Not Started | In Progress | Completed | Delayed
completion_percentage: X%
dependencies: []
deliverables:
- [Deliverable 1]
- [Deliverable 2]
blockers: []
- id: M2
name: "Development Phase 1"
description: "Core features implemented"
target_date: date
actual_date: date or null
status: Not Started | In Progress | Completed | Delayed
completion_percentage: X%
dependencies: [M1]
deliverables:
- [Deliverable 1]
- [Deliverable 2]
blockers: []
Milestone Progress Calculator
def calculate_milestone_progress(milestone):
"""Calculate overall milestone progress"""
deliverable_progress = sum(
deliverable['completion']
for deliverable in milestone['deliverables']
) / len(milestone['deliverables'])
if not all(dep['status'] == 'Completed' for dep in milestone['dependencies']):
deliverable_progress *= 0.5
if milestone['blockers']:
deliverable_progress *= 0.8
return deliverable_progress
Resource Tracking
Team Allocation
team_allocation:
member_1:
project: [project_name]
role: Developer
allocation: 100%
tasks:
- id: T1
name: "Feature X"
status: In Progress
completion: 60%
estimated_hours: 20
actual_hours: 12
- id: T2
name: "Feature Y"
status: Planned
completion: 0%
estimated_hours: 15
actual_hours: 0
member_2:
project: [project_name]
role: Designer
allocation: 80%
tasks:
- id: T3
name: "UI Design"
status: Completed
completion: 100%
estimated_hours: 10
actual_hours: 12
Capacity Planning
def calculate_team_capacity(team):
"""Calculate team capacity vs workload"""
capacity = {}
for member in team:
available_hours = 40 * member['allocation']
estimated_workload = sum(
task['estimated_hours'] - task['actual_hours']
for task in member['tasks']
if task['status'] != 'Completed'
)
capacity[member['name']] = {
'available_hours': available_hours,
'workload_hours': estimated_workload,
'utilization': estimated_workload / available_hours,
'overallocated': estimated_workload > available_hours
}
return capacity
Integration with Other Skills
- daily-agenda: Extract project tasks for daily planning
- standup-bot: Update project status from standup data
- session-summary: Log project progress in session notes
Tier 3: Anticipatory Insights (Advanced)
Predictive Analytics
Completion Prediction
def predict_completion(project, historical_data):
"""Predict project completion date based on current velocity"""
current_velocity = calculate_velocity(project['completed_tasks'], project['days_active'])
similar_projects = find_similar_projects(project, historical_data)
avg_historical_velocity = calculate_average_velocity(similar_projects)
predicted_velocity = (current_velocity * 0.6) + (avg_historical_velocity * 0.4)
remaining_tasks = project['total_tasks'] - len(project['completed_tasks'])
predicted_days = remaining_tasks / predicted_velocity
predicted_completion = project['start_date'] + timedelta(days=predicted_days)
confidence = calculate_confidence(project, similar_projects)
return {
'predicted_date': predicted_completion,
'predicted_days': predicted_days,
'confidence': confidence,
'on_track': predicted_completion <= project['target_date'],
'days_ahead_or_behind': (predicted_completion - project['target_date']).days,
'velocity_trend': calculate_velocity_trend(project),
'risk_factors': identify_completion_risks(project)
}
Risk Assessment
def assess_project_risks(project):
"""Identify and score project risks"""
risks = []
if project['progress'] < expected_progress(project):
risk_score = (expected_progress(project) - project['progress']) * 10
risks.append({
'type': 'Schedule',
'description': 'Behind schedule',
'score': risk_score,
'severity': 'High' if risk_score > 30 else 'Medium' if risk_score > 15 else 'Low',
'mitigation': 'Increase team allocation or reduce scope'
})
if project['team_utilization'] > 0.9:
risks.append({
'type': 'Resource',
'description': 'Team overallocated',
'score': 25,
'severity': 'Medium',
'mitigation': 'Add team members or reduce workload'
})
if len(project['active_blockers']) > 3:
risk_score = len(project['active_blockers']) * 10
risks.append({
'type': 'Blocker',
'description': f'{len(project["active_blockers"])} active blockers',
'score': risk_score,
'severity': 'High' if risk_score > 30 else 'Medium',
'mitigation': 'Prioritize blocker resolution, escalate if needed'
})
delayed_milestones = [m for m in project['milestones'] if m['delayed']]
if delayed_milestones:
risk_score = len(delayed_milestones) * 15
risks.append({
'type': 'Milestone',
'description': f'{len(delayed_milestones)} milestones delayed',
'score': risk_score,
'severity': 'High' if risk_score > 30 else 'Medium',
'mitigation': 'Reassess timeline, reallocate resources'
})
return {
'total_risk_score': sum(r['score'] for r in risks),
'risk_level': 'Critical' if sum(r['score'] for r in risks) > 75 else 'High' if sum(r['score'] for r in risks) > 50 else 'Medium' if sum(r['score'] for r in risks) > 25 else 'Low',
'risks': sorted(risks, key=lambda x: x['score'], reverse=True),
'recommendations': generate_mitigation_plan(risks)
}
Advanced Metrics
Earned Value Management (EVM)
def calculate_ev_metrics(project):
"""Calculate Earned Value Management metrics"""
bac = sum(task['estimated_hours'] for task in project['tasks'])
planned_completion_percentage = project['days_active'] / project['total_days']
pv = bac * planned_completion_percentage
ev = sum(
task['estimated_hours'] * (task['completion'] / 100)
for task in project['tasks']
)
ac = sum(task['actual_hours'] for task in project['tasks'])
sv = ev - pv
spi = ev / pv if pv > 0 else 0
cv = ev - ac
cpi = ev / ac if ac > 0 else 0
etc = (bac - ev) / cpi if cpi > 0 else (bac - ev)
eac = ac + etc
return {
'bac': bac,
'pv': pv,
'ev': ev,
'ac': ac,
'sv': sv,
'spi': spi,
'cv': cv,
'cpi': cpi,
'etc': etc,
'eac': eac,
'schedule_status': 'Ahead' if sv > 0 else 'Behind' if sv < 0 else 'On Track',
'cost_status': 'Under Budget' if cv > 0 else 'Over Budget' if cv < 0 else 'On Budget',
'projected_completion': project['start_date'] + timedelta(days=eac/8)
}
Burndown Chart Analysis
def analyze_burndown(project):
"""Analyze burndown chart and generate insights"""
daily_remaining = calculate_daily_remaining(project)
trend = calculate_linear_trend(daily_remaining)
ideal_burndown = calculate_ideal_burndown(project)
actual_burndown = daily_remaining
deviation = calculate_deviation(ideal_burndown, actual_burndown)
predicted_days = extrapolate_completion(trend)
return {
'trend': 'Improving' if trend['slope'] < 0 else 'Stable' if abs(trend['slope']) < 0.1 else 'Declining',
'current_velocity': abs(trend['slope']),
'deviation_from_ideal': deviation,
'predicted_completion_days': predicted_days,
'on_track': predicted_days <= project['total_days'],
'insights': generate_burndown_insights(trend, deviation),
'recommendations': generate_burndown_recommendations(trend, deviation)
}
Intelligent Status Generation
Context-Aware Reports
def generate_contextual_status(project, audience):
"""Generate status report tailored to audience"""
if audience == 'executive':
return {
'focus': 'high-level metrics and strategic alignment',
'sections': [
'Executive Summary',
'Key Milestones',
'Budget & Timeline',
'Risks & Mitigation'
],
'detail_level': 'Low',
'metrics': ['progress', 'timeline', 'budget', 'risk_score']
}
elif audience == 'team':
return {
'focus': 'detailed task status and blockers',
'sections': [
'Daily Progress',
'Task Breakdown',
'Blockers',
'Next Steps'
],
'detail_level': 'High',
'metrics': ['tasks_completed', 'tasks_in_progress', 'blockers', 'velocity']
}
elif audience == 'client':
return {
'focus': 'deliverables and value',
'sections': [
'Deliverables Status',
'Key Achievements',
'Timeline',
'Questions'
],
'detail_level': 'Medium',
'metrics': ['deliverables', 'timeline', 'quality_metrics']
}
Examples
Example 1: Daily Status Update
User: "What's the status of the Mobile App project?"
Tier 1 Response:
# Project Status: Mobile App
**Overall Status:** 🟢 On Track
**Progress:** 45% complete (45 days elapsed / 100 days total)
**Target Completion:** May 15, 2026
**Current Date:** March 27, 2026
---
## Description
Build native iOS and Android mobile app for our e-commerce platform with shopping cart, payments, and user accounts.
## Team
- Alex (Tech Lead)
- Sarah (iOS Developer)
- Jordan (Android Developer)
- Taylor (Backend)
- Sam (Designer)
## Milestones
- [x] Requirements Complete - Feb 15
- [x] Design Complete - March 1
- [ ] Core Features - April 15 (In Progress - 70%)
- [ ] Testing Phase - May 1
- [ ] Launch - May 15
## Recent Updates
- March 26: Shopping cart integration completed
- March 25: Payment API testing started
- March 24: User authentication backend deployed
## Current Focus
- Completing payment integration
- Testing core features
- Bug fixes from QA
## Blockers
None
## Next Steps
- [ ] Complete payment integration (Sarah/Jordan)
- [ ] Start integration testing (Taylor)
- [ ] Prepare for testing phase (Alex)
Example 2: Weekly Status Report
User: "Generate weekly status report"
Tier 2 Response:
# Weekly Project Status - Week of March 21-27, 2026
## 📊 Executive Summary
**Project:** Mobile App
**Status:** 🟢 On Track
**Completion:** 45% (up from 38% last week)
**ETA:** May 15, 2026 (on track)
---
## 📈 Progress This Week
**Completed Tasks:** 12
**Major Completions:**
- Shopping cart UI (iOS & Android)
- Payment API integration (Backend)
- User authentication testing (QA)
**Milestones Achieved:**
None (next milestone: Core Features - April 15)
**Velocity:** 2.4 tasks/day (+20% vs last week)
---
## 🎯 Focus for Next Week
**Priority Items:**
1. Complete payment integration (iOS/Android) - Sarah/Jordan - April 2
2. Start integration testing - Taylor - April 1
3. Bug fixes from sprint review - All - Ongoing
4. Performance optimization - Taylor - April 3
**Upcoming Milestones:**
- Core Features Complete - April 15 (14 days remaining) - 70% complete
---
## 🚧 Blockers & Risks
**Active Blockers:** 0
**Risks Identified:**
1. **Third-party payment provider downtime** - Low likelihood - High impact
- **Mitigation:** Implement fallback payment methods
2. **App store approval delays** - Medium likelihood - Medium impact
- **Mitigation:** Submit 2 weeks early, have contingency plan
---
## 📊 Metrics Dashboard
**Progress:**
[██████████░░░░░░░░░░░░░] 45%
**Burn Chart:**
Tasks
60 | ●
50 | ● ●
40 | ● ●
30 | ● ●
20 |● ●
10 |●●●●●●●●●●●●●●●●●
|___________________
M T W T F M T
Last week This week
**Task Distribution:**
- ✅ Completed: 45 tasks
- 🔄 In Progress: 12 tasks
- 📋 Planned: 30 tasks
- 🚧 Blocked: 0 tasks
---
## 💡 Insights & Recommendations
**What's Going Well:**
- Velocity improved 20% this week
- No active blockers
- Shopping cart completed on schedule
**Areas of Concern:**
- Integration testing not yet started (3 days behind plan)
- App store approval timeline is tight
**Recommendations:**
- Start integration testing this week (Taylor)
- Submit app to app stores by April 10 (2-week buffer)
- Schedule daily standups to maintain momentum
---
## 📝 Notes & Announcements
- New design system component library ready for review (Sam)
- Backend API documentation updated (Taylor)
- Team hackathon scheduled for April 5
Example 3: Predictive Analysis
User: "Analyze project health and predict completion"
Tier 3 Response:
# Project Health Analysis - Mobile App
## 📊 Executive Summary
**Project:** Mobile App
**Health Score:** 82/100 🟢 Good
**Status:** On Track with Minor Concerns
**Confidence:** High (85%)
---
## 🔮 Completion Prediction
**Target Date:** May 15, 2026 (49 days remaining)
**Predicted Completion:** May 12, 2026 (3 days early)
**Confidence Interval:**
- Optimistic: May 5 (10 days early) - 25% probability
- Likely: May 12 (3 days early) - 50% probability
- Conservative: May 18 (3 days late) - 25% probability
**Prediction Factors:**
| Factor | Impact | Weighted Score |
|---|
| Current Velocity | +3 days | 1.5 points |
| Historical Trend | +2 days | 1.0 points |
| Team Capacity | +1 day | 0.5 points |
| Risk Factors | -2 days | -1.0 points |
| Complexity | -1 day | -0.5 points |
| ------------------------- | ------- | ------------- |
| Total | +3 days | 1.5 points |
---
## 📈 Velocity Analysis
**Current Velocity:** 2.4 tasks/day
**Historical Average:** 2.0 tasks/day
**Trend:** ⬆️ +20% improvement
**Velocity Trend (Last 4 Weeks):**
3.0 | ●●
2.5 | ●●
2.0 | ●●
1.5 | ●●
|___________________
Week 1 2 3 4
**Insights:**
- Velocity consistently improving over past 4 weeks
- Team working at +20% above historical average
- Sustainable pace (not overworking)
---
## 💰 Earned Value Management
**EVM Metrics:**
BAC (Budget at Completion): 1,200 hours
PV (Planned Value): 540 hours (45%)
EV (Earned Value): 590 hours (49%)
AC (Actual Cost): 520 hours
SV (Schedule Variance): +50 hours ✅ (ahead)
SPI (Schedule Performance): 1.09 ✅ (9% ahead)
CV (Cost Variance): +70 hours ✅ (under budget)
CPI (Cost Performance): 1.13 ✅ (13% under budget)
ETC (Estimate to Complete): 540 hours
EAC (Estimate at Completion): 1,060 hours (12% under budget)
**Interpretation:**
- ✅ Ahead of schedule by 50 hours (about 3 days)
- ✅ Under budget by 12% (140 hours saved)
- ✅ Efficient execution (CPI > 1.0)
---
## 🚧 Risk Assessment
**Total Risk Score:** 23/100 🟢 Low
**Risks by Category:**
1. **Schedule Risk** - Score: 10/100 (Low)
- Project ahead of schedule
- No delayed milestones
- **Mitigation:** Continue current pace, maintain focus
2. **Resource Risk** - Score: 15/100 (Low)
- Team utilization: 85% (healthy)
- One team member (Taylor) at 95% capacity
- **Mitigation:** Monitor Taylor's workload, redistribute if needed
3. **Technical Risk** - Score: 20/100 (Low-Medium)
- Third-party payment provider (unreliable history)
- App store approval uncertainty
- **Mitigation:** Implement fallbacks, submit early
4. **Scope Risk** - Score: 0/100 (None)
- No scope creep detected
- Requirements stable
- **Mitigation:** Continue scope management
**Top 3 Risk Factors:**
1. **Payment provider downtime** - Probability: 15% - Impact: High
- Mitigation: Implement multiple payment gateways as fallback
2. **App store rejection** - Probability: 25% - Impact: Medium
- Mitigation: Submit 2 weeks early, have contingency plan
3. **Taylor capacity issues** - Probability: 40% - Impact: Low
- Mitigation: Redistribute integration testing to Sarah/Jordan
---
## 📊 Health Score Breakdown
| Metric | Score | Weight | Weighted Score |
|---|
| Progress vs Plan | 95 | 25% | 23.75 points |
| Velocity Trend | 90 | 20% | 18.00 points |
| Budget Performance | 90 | 15% | 13.50 points |
| Milestone Adherence | 100 | 15% | 15.00 points |
| Team Capacity | 85 | 10% | 8.50 points |
| Risk Level | 77 | 10% | 7.70 points |
| Stakeholder Satisfaction | 85 | 5% | 4.25 points |
| ------------------------- | ----- | ------ | ------------- |
| TOTAL | | 100% | 90.70 / 100 |
**Health Grade:** A (90.7/100)
**Insights:**
- ✅ Excellent milestone adherence (100%)
- ✅ Strong progress vs plan (95%)
- ✅ Good velocity trend (90%)
- ⚠️ Risk level could be improved (77%)
---
## 💡 AI Recommendations
### Immediate Actions (This Week)
1. **Start integration testing** (Taylor) - Currently 3 days behind plan
- Impact: Maintains schedule buffer
- Priority: High
2. **Monitor Taylor's capacity** (Alex)
- Impact: Prevents burnout and delays
- Priority: Medium
### Short-term (Next 2 Weeks)
3. **Submit to app stores** (All)
- Target: April 10 (5 days early)
- Impact: Provides approval buffer
- Priority: High
4. **Implement payment fallbacks** (Taylor)
- Impact: Reduces technical risk
- Priority: Medium
### Long-term (Next Month)
5. **Plan post-launch support** (Alex)
- Impact: Smooth transition to maintenance
- Priority: Low
6. **Document lessons learned** (All)
- Impact: Improves future projects
- Priority: Low
---
## 🎯 Success Metrics
**On-Track Indicators:**
✅ EV > PV (ahead of schedule)
✅ CPI > 1.0 (under budget)
✅ Velocity improving
✅ No critical blockers
✅ Stakeholder satisfaction high
**Warning Indicators:**
⚠️ Taylor at 95% capacity (monitor)
⚠️ Third-party dependency (payment provider)
**Critical Indicators:**
🔴 None
---
## 📈 Project Health Trend
**Health Score History:**
100 | ●
90 | ●●● ●
80 | ●●
70 | ●●
60 | ●●
|___________________
Week 1 2 3 4 5 6
**Trend:** ⬆️ Improving consistently
**Confidence:** High - project health has improved 4 weeks in a row
---
## 🔮 Scenario Analysis
**Scenario 1: Everything Goes Well (Optimistic)**
- Probability: 25%
- Completion: May 5 (10 days early)
- Budget savings: ~15%
- Key drivers: Velocity continues, no blockers
**Scenario 2: Current Trend Continues (Most Likely)**
- Probability: 50%
- Completion: May 12 (3 days early)
- Budget savings: ~12%
- Key drivers: Maintain current pace, minor delays
**Scenario 3: Some Setbacks (Conservative)**
- Probability: 25%
- Completion: May 18 (3 days late)
- Budget: On plan
- Key drivers: Payment provider issues, app store delays
**Recommended Contingency:** Plan for Scenario 3, aim for Scenario 2
---
## 📋 Executive Summary for Stakeholders
**Key Message:** Project is on track and performing well, with 3-day early completion predicted. No major concerns.
**Highlights:**
- 45% complete, ahead of schedule
- 12% under budget
- Team velocity improving
- No critical blockers
**Risks:**
- Payment provider reliability (mitigated with fallbacks)
- App store approval timeline (mitigated with early submission)
**Recommendation:** Continue current approach, no intervention needed at this time.
**Next Update:** Weekly report on April 3, 2026
Best Practices
For Status Reporting
-
Be Honest and Transparent
- Report delays early
- Don't hide blockers
- Share both good and bad news
-
Focus on Actionable Information
- What needs to be done
- Who is responsible
- When it's due
-
Tailor to Audience
- Executives: High-level metrics and risks
- Team: Detailed tasks and blockers
- Clients: Deliverables and timeline
For Project Tracking
-
Update Regularly
- Daily: Task progress
- Weekly: Milestones and blockers
- Monthly: Overall project health
-
Use Consistent Metrics
- Same measurements over time
- Track trends, not just snapshots
- Compare to baselines
-
Plan for Contingencies
- Identify risks early
- Have mitigation strategies
- Build buffer into timeline
Common Mistakes
Reporting Mistakes
❌ Too Optimistic: "Everything's going great" when behind schedule
✅ Realistic: "3 days behind plan, taking steps to recover"
❌ Too Detailed: 50-page report for executives
✅ Right Detail: 1-page summary with key metrics and risks
❌ Late Reporting: Status updates 1 week late
✅ Timely: Status updates within 24 hours of period end
Tracking Mistakes
❌ Not Updated: Tasks marked "In Progress" for weeks
✅ Current: Regular progress updates, accurate status
❌ No Blockers Reported: "No blockers" but nothing getting done
✅ Honest: Report blockers even if they seem small
❌ Scope Creep: Tasks added without adjusting timeline
✅ Scope Managed: Adjust timeline when scope changes
Integration with Other Skills
Related Skills
- daily-agenda: Extract project tasks for daily planning
- standup-bot: Update project status from team standups
- session-summary: Log project progress in session notes
Workflow Integration
-
Standup Bot → Project Status
Team standups → Extract task updates → Refresh project dashboard
-
Project Status → Daily Agenda
Review project status → Identify priorities → Update daily tasks
-
Daily Agenda → Project Status
Complete daily tasks → Update project progress → Log milestones
Progressive Disclosure
Level 1 (Guided):
- Simple project overview template
- Basic status tracking
- Manual milestone updates
Level 2 (Confident):
- Structured daily and weekly reports
- Milestone progress calculation
- Team capacity tracking
- Resource allocation
Level 3 (Anticipatory):
- Predictive completion analysis
- Earned Value Management (EVM)
- Risk assessment and mitigation
- AI-powered insights and recommendations
Session Tracking
After using this skill, update personal-os/adaptation/skill-levels.md:
project-status:
level: 1
sessions_used: 1
last_used: [current_date]
progression_notes: "Created project overview, tracked first milestone"