Planning - 实施规划与步骤分解
前置协议
强制触发规则
触发时机:prompt-enhancer 完成需求细化后(强制)
触发条件:
- ✅ 已有明确的需求和方案
- ✅ 需要实施规划和步骤分解
- ✅ 复杂任务(需要多个步骤完成)
例外情况:
- 简单任务(单步即可完成)
- 用户明确表示"直接开始"
依赖检查
前置依赖:prompt-enhancer
检查内容:
- 检查工件文件:
memory/artifacts/prompt-enhancer/
- 确认已有明确的需求和选定方案
- 如果无前置工件,需先执行 prompt-enhancer
与 goal-oriented 的协作
触发来源:goal-oriented skill 强制调用
触发流程:
goal-oriented 创建目标
↓
调用 prompt-enhancer(需求细化)
↓
生成需求方案工件
↓
调用 planning(实施规划)
↓
读取需求方案工件 → 生成实施计划 → plan-review
↓
生成实施计划工件
↓
传递给 execution 阶段
↓
任务完成后 → experience-manager 经验沉淀
工件接收:
- goal-oriented 会写入工件到
memory/artifacts/prompt-enhancer/
- planning 自动检测并读取最新工件
工件传递机制
输入工件(来自 prompt-enhancer)
工件路径: memory/artifacts/prompt-enhancer/result-{timestamp}.json
工件格式:
{
"skill": "prompt-enhancer",
"version": "2.0.0",
"requirement": {
"original": "用户原始需求",
"refined": {
"type": "功能开发|重构|优化",
"core_features": ["功能1", "功能2"],
"target_users": "目标用户",
"platform": "平台",
"tech_stack": ["技术1", "技术2"],
"success_criteria": ["标准1", "标准2"],
"timeline": "时间线"
}
},
"solution": {
"selected": "选定方案",
"reasons": ["理由1", "理由2"],
"alternatives": [
{
"name": "备选方案1",
"pros": ["优势"],
"cons": ["劣势"]
}
]
}
}
读取方式:
PROMPT_ENHANCER_ARTIFACT=$(ls -t memory/artifacts/prompt-enhancer/*.json | grep -v latest.json | head -1)
if [ -n "$PROMPT_ENHANCER_ARTIFACT" ]; then
echo "✅ Found prompt-enhancer artifact: $PROMPT_ENHANCER_ARTIFACT"
else
echo "❌ No prompt-enhancer artifact found"
echo "⚠️ Must execute prompt-enhancer before planning"
fi
输出工件(传递给后续技能)
工件路径: memory/artifacts/planning/result-{timestamp}.json
工件格式: 见 "步骤8:生成工件"
传递机制:
- 创建工件文件
- 创建 latest.json 符号链接
- 后续技能可自动检测 latest.json
Overview
planning 是强制前置技能,负责实施规划和步骤分解。将明确的需求和方案转化为可执行的实施计划,通过 plan-review 确保计划可行,降低执行风险。
核心能力:
- 步骤分解:将需求分解为可执行步骤
- 依赖识别:识别步骤间的依赖关系
- 资源规划:明确所需资源和时间
- 风险评估:识别潜在风险和应对措施
- plan-review:用户确认实施计划
核心原则:谋定后动,规划先行。好的计划是成功的一半。
关键价值:
- 明确执行路径,避免盲目行动
- 识别依赖关系,合理安排顺序
- 提前评估风险,准备应对措施
- 用户确认计划,确保理解一致
When to Use
强制使用场景:
- prompt-enhancer 完成后
- 需求已明确,方案已选定
- 任务需要多个步骤完成
不使用场景:
- 简单任务(单步即可完成)
- 用户明确表示"直接开始"
- 已有详细的实施计划
The Process
digraph planning_process {
rankdir=TB;
"接收需求方案工件" [shape=box, style=filled, fillcolor="#c8e6c9"];
"步骤分解" [shape=box, style=filled, fillcolor="#bbdefb"];
"依赖识别" [shape=box, style=filled, fillcolor="#fff9c4"];
"资源规划" [shape=box, style=filled, fillcolor="#ff9800"];
"风险评估" [shape=box, style=filled, fillcolor="#ff9800"];
"生成实施计划" [shape=box, style=filled, fillcolor="#f8bbd0"];
"plan-review" [shape=diamond, style=filled, fillcolor="#e1bee7"];
"用户确认" [shape=diamond, style=filled, fillcolor="#e1bee7"];
"调整计划" [shape=box, style=filled, fillcolor="#f8bbd0"];
"生成工件" [shape=box, style=filled, fillcolor="#81c784"];
"传递给执行技能" [shape=doublecircle, style=filled, fillcolor="#81c784"];
"接收需求方案工件" -> "步骤分解";
"步骤分解" -> "依赖识别";
"依赖识别" -> "资源规划";
"资源规划" -> "风险评估";
"风险评估" -> "生成实施计划";
"生成实施计划" -> "plan-review";
"plan-review" -> "用户确认";
"用户确认" -> "调整计划" [label="需调整"];
"用户确认" -> "生成工件" [label="确认"];
"调整计划" -> "生成实施计划";
"生成工件" -> "传递给执行技能";
}
步骤1:接收需求方案工件
从前置技能 prompt-enhancer 读取工件:
{
"requirement": {
"original": "做一个用户认证功能",
"refined": { ... }
},
"solution": {
"selected": "方案2:微信云开发",
"reasons": [ ... ]
}
}
步骤2:步骤分解
将需求分解为可执行的实施步骤
分解原则
MECE原则:相互独立,完全穷尽
粒度控制:
- 每个步骤可在 0.5-2 天内完成
- 步骤不过细(避免过度规划)
- 步骤不过粗(避免模糊不清)
分解方法
方法1:按功能模块分解
用户认证功能
├─ 注册模块
│ ├─ 步骤1:实现手机验证码发送
│ └─ 步骤2:实现注册流程
├─ 登录模块
│ ├─ 步骤3:实现手机验证码登录
│ └─ 步骤4:实现微信OAuth
└─ 找回密码模块
└─ 步骤5:实现找回密码流程
方法2:按时间顺序分解
Week 1: 基础功能
├─ Day 1-2:环境配置 + 验证码发送
├─ Day 3-4:注册登录流程
└─ Day 5:找回密码
Week 2: 优化测试
├─ Day 1-2:测试与Bug修复
├─ Day 3-4:性能优化
└─ Day 5:上线准备
方法3:按技术层次分解
前端
├─ 步骤1:登录UI组件
├─ 步骤2:表单验证
└─ 步骤3:API对接
后端
├─ 步骤4:云函数开发
├─ 步骤5:数据库设计
└─ 步骤6:第三方集成
步骤3:依赖识别
识别步骤间的依赖关系
依赖类型
| 依赖类型 | 说明 | 示例 |
|---|
| 强依赖 | 必须先完成前置步骤 | 注册 → 登录 |
| 弱依赖 | 最好先完成,但可并行 | UI设计 ↔ API设计 |
| 无依赖 | 可独立执行 | 文档编写 |
依赖图示例
步骤1:环境配置
↓
步骤2:验证码发送
↓
┌─────────┴─────────┐
↓ ↓
步骤3:注册流程 步骤4:登录流程
↓ ↓
└─────────┬─────────┘
↓
步骤5:找回密码
↓
步骤6:测试上线
步骤4:资源规划
明确每个步骤所需的资源
资源维度
人力资源:
- 谁来执行?(前端、后端、测试)
- 需要多少人?
- 是否需要协作?
时间资源:
技术资源:
- 需要什么技术栈?
- 是否需要第三方服务?
- 是否需要新工具?
资金资源:
资源规划表
| 步骤 | 人员 | 时间 | 技术 | 成本 |
|---|
| 环境配置 | 1人 | 0.5天 | 微信开发者工具 | 无 |
| 验证码发送 | 1人 | 1天 | 阿里云短信服务 | ~¥0.05/条 |
| 注册流程 | 1人 | 2天 | 云开发、云函数 | 无 |
| 登录流程 | 1人 | 2天 | OAuth、JWT | 无 |
| 找回密码 | 1人 | 1天 | - | 无 |
| 测试上线 | 1人 | 1.5天 | - | 无 |
步骤5:风险评估
识别潜在风险和应对措施
风险类型
| 风险类型 | 风险描述 | 概率 | 影响 | 应对措施 |
|---|
| 技术风险 | 微信OAuth集成复杂度 | 中 | 高 | 提前研究文档,预留buffer |
| 时间风险 | 短信服务审核时间 | 高 | 中 | 提前申请,准备备选方案 |
| 成本风险 | 短信费用超预算 | 低 | 低 | 设置发送频率限制 |
| 集成风险 | 现有系统对接困难 | 中 | 高 | 优先调研现有系统接口 |
风险矩阵
影响 ↑
高 │ [OAuth集成] [系统对接]
│ 中风险 高风险
中 │ [审核时间] [成本超支]
│ 中风险 低风险
低 │
└──────────────────────→ 概率
低 中 高
步骤6:生成实施计划
整合所有内容,生成完整的实施计划
实施计划模板
# 实施计划
## 基本信息
- **项目名称**: 用户认证系统
- **目标**: 实现注册、登录、找回密码功能
- **时间线**: 2周(10个工作日)
- **团队**: 1人(全栈)
---
## 实施步骤
### Phase 1: 环境准备(Day 1)
#### 步骤1:环境配置
**目标**: 搭建开发环境
**任务**:
- [ ] 创建微信小程序项目
- [ ] 配置云开发环境
- [ ] 初始化云数据库
- [ ] 配置项目目录结构
**产出**:
- 可运行的云开发项目框架
- 数据库表结构
**依赖**: 无
**风险**: 无
---
### Phase 2: 核心功能(Day 2-6)
#### 步骤2:验证码发送(Day 2)
**目标**: 实现手机验证码发送功能
**任务**:
- [ ] 申请阿里云短信服务
- [ ] 开发云函数:send-code
- [ ] 前端调用接口
- [ ] 测试验证码发送
**产出**:
- send-code 云函数
- 前端调用封装
**依赖**: 步骤1
**风险**: 短信服务审核(应对:提前申请)
---
#### 步骤3:注册流程(Day 3-4)
**目标**: 实现用户注册功能
**任务**:
- [ ] 设计注册UI(手机号、验证码、密码)
- [ ] 开发云函数:register
- [ ] 表单验证逻辑
- [ ] 数据存储
- [ ] 测试注册流程
**产出**:
- 注册页面
- register 云函数
- 用户数据表
**依赖**: 步骤2
**风险**: 无
---
#### 步骤4:登录流程(Day 5-6)
**目标**: 实现手机验证码和微信OAuth登录
**任务**:
- [ ] 设计登录UI
- [ ] 开发云函数:login(验证码登录)
- [ ] 开发云函数:wechat-login(OAuth)
- [ ] Token生成与存储
- [ ] 测试登录流程
**产出**:
- 登录页面
- login 和 wechat-login 云函数
- Token管理
**依赖**: 步骤3
**风险**: 微信OAuth集成复杂度(应对:预留buffer)
---
### Phase 3: 补充功能(Day 7-8)
#### 步骤5:找回密码(Day 7-8)
**目标**: 实现找回密码功能
**任务**:
- [ ] 设计找回密码UI
- [ ] 开发云函数:reset-password
- [ ] 验证码验证
- [ ] 密码重置逻辑
- [ ] 测试找回密码流程
**产出**:
- 找回密码页面
- reset-password 云函数
**依赖**: 步骤2
**风险**: 无
---
### Phase 4: 测试上线(Day 9-10)
#### 步骤6:测试与优化(Day 9)
**目标**: 全面测试,修复Bug
**任务**:
- [ ] 功能测试(注册、登录、找回密码)
- [ ] 边界测试(验证码过期、错误处理)
- [ ] 性能测试(响应时间、并发)
- [ ] Bug修复
**产出**:
- 测试报告
- Bug修复清单
**依赖**: 步骤5
**风险**: 发现重大Bug(应对:预留1天buffer)
---
#### 步骤7:上线准备(Day 10)
**目标**: 准备上线,文档完善
**任务**:
- [ ] 代码审查
- [ ] 性能优化
- [ ] 文档编写
- [ ] 提交审核
**产出**:
- 完整代码
- 技术文档
- 用户手册
**依赖**: 步骤6
**风险**: 审核不通过(应对:提前了解审核规范)
---
## 依赖关系图
步骤1: 环境配置
↓
步骤2: 验证码发送
↓
┌─────────┴─────────┐
↓ ↓
步骤3: 注册流程 步骤4: 登录流程
↓ ↓
└─────────┬─────────┘
↓
步骤5: 找回密码
↓
步骤6: 测试
↓
步骤7: 上线
---
## 资源规划
| 步骤 | 人员 | 时间 | 关键技术 |
|------|------|------|---------|
| 环境配置 | 1人 | 0.5天 | 微信开发者工具 |
| 验证码发送 | 1人 | 1天 | 阿里云短信 |
| 注册流程 | 1人 | 2天 | 云开发 |
| 登录流程 | 1人 | 2天 | OAuth、JWT |
| 找回密码 | 1人 | 1天 | - |
| 测试 | 1人 | 1天 | - |
| 上线 | 1人 | 0.5天 | - |
**总计**: 1人 × 10天
---
## 风险与应对
| 风险 | 概率 | 影响 | 应对措施 |
|------|------|------|---------|
| 短信服务审核 | 高 | 中 | 提前申请,准备备选方案 |
| OAuth集成复杂 | 中 | 高 | 提前研究文档,预留buffer |
| 系统对接困难 | 中 | 高 | 优先调研现有系统 |
| 发现重大Bug | 低 | 高 | 预留1天buffer |
---
## 关键里程碑
- **Day 1**: 环境准备完成
- **Day 4**: 注册功能完成
- **Day 6**: 登录功能完成
- **Day 8**: 所有功能开发完成
- **Day 10**: 测试通过,提交审核
---
## 成功标准
- ✅ 注册、登录、找回密码功能完整
- ✅ 登录响应时间 < 2秒
- ✅ 无P0/P1级Bug
- ✅ 通过微信审核
步骤7:plan-review(强制)
plan-review 是强制步骤,确保实施计划经过用户确认
plan-review 流程
展示计划:
## 📋 实施计划已完成
### 核心内容
- **总时长**: 10个工作日
- **步骤数**: 7个步骤
- **关键里程碑**: 4个
- **风险点**: 4个
### 关键步骤
1. 环境配置(Day 1)
2. 验证码发送(Day 2)
3. 注册流程(Day 3-4)
4. 登录流程(Day 5-6)
5. 找回密码(Day 7-8)
6. 测试(Day 9)
7. 上线(Day 10)
### 潜在风险
⚠️ 短信服务审核时间
⚠️ 微信OAuth集成复杂度
---
**请确认实施计划:**
- A) ✅ 确认,开始执行
- B) 需要调整(请说明具体问题)
- C) 需要重新规划
用户确认后:
- ✅ 用户确认 → 生成工件,传递给后续技能
- ❌ 用户要求调整 → 根据反馈调整计划
- ❌ 用户要求重规划 → 重新执行 planning
plan-review 工具调用(AskUserQuestion)
使用 AskUserQuestion 工具展示计划并获取用户确认:
AskUserQuestion(
questions=[
{
"question": "实施计划已完成,请确认是否开始执行?",
"header": "计划确认",
"options": [
{
"label": "✅ 确认,开始执行",
"description": "同意实施计划,生成工件并传递给后续技能"
},
{
"label": "需要调整",
"description": "对部分步骤有疑问,需要修改计划(请说明具体问题)"
},
{
"label": "重新规划",
"description": "对整体方案不满意,需要重新分解步骤"
}
],
"multiSelect": false
}
]
)
用户响应处理:
- 用户选择 "✅ 确认" → 生成工件,传递给后续技能
- 用户选择 "需要调整" → 根据用户反馈修改计划
- 用户选择 "重新规划" → 重新执行 planning 流程
步骤8:生成工件
创建工件文件,传递给后续技能:
{
"skill": "planning",
"version": "1.0.0",
"timestamp": "2026-03-25T10:30:00Z",
"project": {
"name": "用户认证系统",
"goal": "实现注册、登录、找回密码功能",
"timeline": "2周(10个工作日)",
"team": "1人(全栈)"
},
"implementation_plan": {
"phases": [
{
"name": "Phase 1: 环境准备",
"steps": [
{
"id": 1,
"name": "环境配置",
"duration": "0.5天",
"tasks": ["创建小程序项目", "配置云开发", "初始化数据库"],
"dependencies": [],
"risks": []
}
]
},
{
"name": "Phase 2: 核心功能",
"steps": [
{
"id": 2,
"name": "验证码发送",
"duration": "1天",
"tasks": ["申请短信服务", "开发send-code云函数", "前端调用"],
"dependencies": [1],
"risks": ["短信服务审核"]
},
{
"id": 3,
"name": "注册流程",
"duration": "2天",
"tasks": ["设计UI", "开发register云函数", "表单验证"],
"dependencies": [2],
"risks": []
}
]
}
],
"dependencies_graph": {
"1": [],
"2": [1],
"3": [2],
"4": [2, 3],
"5": [2],
"6": [5],
"7": [6]
},
"total_steps": 7,
"total_duration": "10天"
},
"resource_plan": {
"human": {
"team_size": 1,
"roles": ["全栈开发"]
},
"time": {
"total_days": 10,
"start_date": "2026-03-25",
"end_date": "2026-04-07"
},
"technology": [
"微信小程序",
"云开发",
"阿里云短信",
"OAuth",
"JWT"
],
"cost": {
"短信服务": "~¥0.05/条",
"云开发": "免费额度"
}
},
"risk_assessment": [
{
"risk": "短信服务审核时间",
"probability": "high",
"impact": "medium",
"mitigation": "提前申请,准备备选方案"
},
{
"risk": "微信OAuth集成复杂度",
"probability": "medium",
"impact": "high",
"mitigation": "提前研究文档,预留buffer"
}
],
"milestones": [
{"day": 1, "name": "环境准备完成"},
{"day": 4, "name": "注册功能完成"},
{"day": 6, "name": "登录功能完成"},
{"day": 8, "name": "所有功能开发完成"},
{"day": 10, "name": "测试通过,提交审核"}
],
"review_status": "confirmed",
"next_skills": ["experience-manager"]
}
规划方法论
WBS工作分解结构
Work Breakdown Structure:
项目
├─ 阶段1
│ ├─ 任务1.1
│ ├─ 任务1.2
│ └─ 任务1.3
├─ 阶段2
│ ├─ 任务2.1
│ └─ 任务2.2
└─ 阶段3
├─ 任务3.1
└─ 任务3.2
关键路径法(CPM)
识别影响总工期的关键路径:
环境配置(0.5天) → 验证码(1天) → 注册(2天) → 登录(2天) → 测试(1天) → 上线(0.5天)
↓
找回密码(1天)
关键路径: 环境 → 验证码 → 注册 → 登录 → 测试 → 上线 = 7天
风险管理框架
识别 → 评估 → 应对 → 监控
- 识别: 列出所有潜在风险
- 评估: 概率 × 影响
- 应对: 避免、转移、减轻、接受
- 监控: 定期检查风险状态
Examples
案例1:功能开发规划(完整工具调用流程)
用户需求: 实现搜索功能
完整执行流程:
步骤1:读取 prompt-enhancer 工件
ls -t memory/artifacts/prompt-enhancer/*.json | grep -v latest.json | head -1
Read(
file_path="memory/artifacts/prompt-enhancer/result-20260325-103000.json"
)
{
"skill": "prompt-enhancer",
"version": "2.0.0",
"requirement": {
"original": "实现搜索功能",
"refined": {
"type": "功能开发",
"core_features": ["关键词搜索", "结果排序", "搜索历史"],
"target_users": "普通用户",
"platform": "小程序",
"tech_stack": ["云开发", "云函数"],
"success_criteria": ["搜索响应<2秒", "结果准确率>90%"],
"timeline": "1周"
}
},
"solution": {
"selected": "方案2:云开发数据库搜索",
"reasons": ["成本低", "维护简单", "数据量适中"],
"alternatives": [
{
"name": "方案1:数据库LIKE查询",
"pros": ["实现简单"],
"cons": ["性能差,适合<1万条"]
},
{
"name": "方案3:Algolia托管服务",
"pros": ["功能强大", "响应快"],
"cons": ["成本高", "需要集成"]
}
]
}
}
步骤2:步骤分解(MECE原则)
分解为可执行的实施步骤:
# 实施计划
## 基本信息
- **项目名称**: 搜索功能
- **目标**: 实现关键词搜索、结果排序、搜索历史
- **时间线**: 1周(5个工作日)
- **团队**: 1人(全栈)
---
## 实施步骤
### Phase 1: 需求确认(Day 1)
#### 步骤1: 需求确认与技术选型
**目标**: 确认搜索范围和技术方案
**任务**:
- [ ] 确认搜索范围(标题、内容、标签)
- [ ] 确认搜索方式(模糊、精确)
- [ ] 确认数据量(预计多少条记录)
- [ ] 最终确认技术方案(云开发数据库搜索)
**产出**:
- 需求确认文档
- 技术选型确认
**依赖**: 无
**风险**: 数据量未知(应对:先调研现有数据量)
---
### Phase 2: 后端开发(Day 2-3)
#### 步骤2: 后端API开发
**目标**: 实现搜索API
**任务**:
- [ ] 开发云函数:search
- [ ] 实现搜索逻辑(模糊匹配、排序)
- [ ] 实现搜索历史记录
- [ ] 测试搜索API
**产出**:
- search 云函数
- API文档
**依赖**: 步骤1
**风险**: 搜索性能不达标(应对:提前测试性能)
---
### Phase 3: 前端开发(Day 3-4)
#### 步骤3: 前端UI开发
**目标**: 实现搜索界面
**任务**:
- [ ] 设计搜索框UI
- [ ] 实现搜索结果列表
- [ ] 实现加载状态和空状态
- [ ] 实现搜索历史展示
- [ ] API对接
**产出**:
- 搜索页面
- 搜索历史组件
**依赖**: 步骤2
**风险**: 无
---
### Phase 4: 测试上线(Day 5)
#### 步骤4: 测试与优化
**目标**: 全面测试,修复Bug
**任务**:
- [ ] 功能测试(搜索、排序、历史)
- [ ] 性能测试(响应时间)
- [ ] 边界测试(空搜索、特殊字符)
- [ ] Bug修复
- [ ] 上线准备
**产出**:
- 测试报告
- 上线代码
**依赖**: 步骤3
**风险**: 发现重大Bug(应对:预留buffer)
---
## 依赖关系图
步骤1: 需求确认
↓
步骤2: 后端开发
↓
步骤3: 前端开发
↓
步骤4: 测试上线
---
## 资源规划
| 步骤 | 人员 | 时间 | 关键技术 |
|------|------|------|---------|
| 需求确认 | 1人 | 1天 | - |
| 后端开发 | 1人 | 2天 | 云开发、云函数 |
| 前端开发 | 1人 | 2天 | 小程序UI |
| 测试上线 | 1人 | 1天 | - |
**总计**: 1人 × 5天
---
## 风险与应对
| 风险 | 概率 | 影响 | 应对措施 |
|------|------|------|---------|
| 数据量未知 | 高 | 中 | 先调研现有数据量 |
| 搜索性能不达标 | 中 | 高 | 提前测试性能 |
| 发现重大Bug | 低 | 高 | 预留buffer |
---
## 关键里程碑
- **Day 1**: 需求确认完成
- **Day 3**: 后端API完成
- **Day 4**: 前端UI完成
- **Day 5**: 测试通过,准备上线
---
## 成功标准
- ✅ 搜索响应时间 < 2秒
- ✅ 搜索结果准确率 > 90%
- ✅ 搜索历史功能正常
- ✅ 无P0/P1级Bug
步骤3:plan-review(使用 AskUserQuestion)
AskUserQuestion(
questions=[
{
"question": "实施计划已完成,请确认是否开始执行?",
"header": "计划确认",
"options": [
{
"label": "✅ 确认,开始执行",
"description": "同意实施计划,生成工件并传递给后续技能"
},
{
"label": "需要调整",
"description": "对部分步骤有疑问,需要修改计划"
},
{
"label": "重新规划",
"description": "对整体方案不满意,需要重新分解"
}
],
"multiSelect": false
}
]
)
步骤4:生成工件(使用 Write)
Write(
file_path="memory/artifacts/planning/result-20260325-104500.json",
content={
"skill": "planning",
"version": "2.0.0",
"timestamp": "2026-03-25T10:45:00Z",
"project": {
"name": "搜索功能",
"goal": "实现关键词搜索、结果排序、搜索历史",
"timeline": "1周(5个工作日)",
"team": "1人(全栈)"
},
"implementation_plan": {
"phases": [
{
"name": "Phase 1: 需求确认",
"steps": [
{
"id": 1,
"name": "需求确认与技术选型",
"duration": "1天",
"tasks": ["确认搜索范围", "确认搜索方式", "确认数据量", "确认技术方案"],
"dependencies": [],
"risks": ["数据量未知"]
}
]
},
{
"name": "Phase 2: 后端开发",
"steps": [
{
"id": 2,
"name": "后端API开发",
"duration": "2天",
"tasks": ["开发search云函数", "实现搜索逻辑", "实现搜索历史", "测试API"],
"dependencies": [1],
"risks": ["搜索性能不达标"]
}
]
},
{
"name": "Phase 3: 前端开发",
"steps": [
{
"id": 3,
"name": "前端UI开发",
"duration": "2天",
"tasks": ["设计搜索框UI", "实现搜索结果列表", "实现搜索历史展示", "API对接"],
"dependencies": [2],
"risks": []
}
]
},
{
"name": "Phase 4: 测试上线",
"steps": [
{
"id": 4,
"name": "测试与优化",
"duration": "1天",
"tasks": ["功能测试", "性能测试", "边界测试", "Bug修复", "上线准备"],
"dependencies": [3],
"risks": ["发现重大Bug"]
}
]
}
],
"dependencies_graph": {
"1": [],
"2": [1],
"3": [2],
"4": [3]
},
"total_steps": 4,
"total_duration": "5天"
},
"resource_plan": {
"human": {
"team_size": 1,
"roles": ["全栈开发"]
},
"time": {
"total_days": 5,
"start_date": "2026-03-25",
"end_date": "2026-03-29"
},
"technology": ["小程序", "云开发", "云函数"],
"cost": {
"云开发": "免费额度"
}
},
"risk_assessment": [
{
"risk": "数据量未知",
"probability": "high",
"impact": "medium",
"mitigation": "先调研现有数据量"
},
{
"risk": "搜索性能不达标",
"probability": "medium",
"impact": "high",
"mitigation": "提前测试性能"
},
{
"risk": "发现重大Bug",
"probability": "low",
"impact": "high",
"mitigation": "预留buffer"
}
],
"milestones": [
{"day": 1, "name": "需求确认完成"},
{"day": 3, "name": "后端API完成"},
{"day": 4, "name": "前端UI完成"},
{"day": 5, "name": "测试通过,准备上线"}
],
"success_criteria": [
"搜索响应时间 < 2秒",
"搜索结果准确率 > 90%",
"搜索历史功能正常",
"无P0/P1级Bug"
],
"review_status": "confirmed",
"next_skills": ["experience-manager"]
}
)
ln -sf memory/artifacts/planning/result-20260325-104500.json memory/artifacts/planning/latest.json
结果:完整的工具调用流程,从读取工件到生成工件,展示 planning skill 的实际执行过程。
案例2:架构重构规划
需求: 实现搜索功能
规划结果:
## 实施计划
### 步骤分解
1. 需求确认(0.5天)
- 确认搜索范围(标题、内容、标签?)
- 确认搜索方式(模糊、精确?)
2. 技术选型(0.5天)
- 方案1:数据库LIKE查询(适合<1万条)
- 方案2:Elasticsearch(适合>10万条)
- 方案3:Algolia(托管服务,快速集成)
3. 后端开发(2天)
- 搭建搜索API
- 实现搜索逻辑
- 性能优化
4. 前端开发(2天)
- 搜索框UI
- 结果展示
- 交互优化
5. 测试上线(1天)
- 功能测试
- 性能测试
- Bug修复
**总时长**: 6天
**风险**: 数据量未知(应对:先调研数据量)
案例2:架构重构规划
需求: 微服务拆分
规划结果:
## 实施计划
### Phase 1: 调研设计(Week 1)
- 服务边界划分
- API设计
- 数据库拆分方案
### Phase 2: 基础设施(Week 2)
- 容器化
- 服务注册发现
- 配置中心
### Phase 3: 核心服务拆分(Week 3-4)
- 用户服务
- 订单服务
- 商品服务
### Phase 4: 测试迁移(Week 5)
- 集成测试
- 性能测试
- 灰度迁移
**总时长**: 5周
**风险**: 数据迁移(应对:制定详细迁移方案)
Common Pitfalls
误区1:跳过planning直接执行
表现:需求明确后就直接开始写代码
正确做法:强制执行planning,生成实施计划
误区2:计划过于粗略
表现:计划只有"开发"、"测试"两个步骤
正确做法:分解到0.5-2天的粒度
误区3:忽略依赖关系
表现:并行执行有依赖的任务,导致返工
正确做法:明确依赖关系,合理安排顺序
误区4:不识别风险
表现:计划中没有风险评估
正确做法:每个步骤都要识别潜在风险
误区5:跳过plan-review
表现:生成计划后直接执行,不与用户确认
正确做法:强制执行plan-review,用户确认后再执行
References
- 《项目管理知识体系指南(PMBOK)》
- 《人月神话》- Frederick Brooks
- WBS工作分解结构
- 关键路径法(CPM)
- 风险管理框架