| description | Create or update executable `.planr/plans/*.plan.md` contracts in this repository. Use when scope, ownership, phase breakdown, verification, or acceptance criteria must be defined before implementation, including bug-to-plan conversions and review-finding follow-up plans. Not for executing fixes (`planr-fix`), giving a verdict-only status answer (`planr-status`), or running a findings-first audit (`planr-review`). |
Planr Plan
Use this skill to write an execution contract, not a design memo.
A planr-plan is invalid if it skips the real code, omits per-phase checklists, leaves verification vague, or treats completion as something later agents can assume instead of prove.
CLI-First Rule
- Read ../planr-shared.md first.
- If
.planr/project/*.md is missing or still generic starter text, run ./.planr/tooling/planr project init, then inspect the target repo and rewrite those files before making strong architecture or ownership decisions.
- Use
./.planr/tooling/planr plan new ... to scaffold new plan files instead of hand-writing boilerplate.
- There is no general plan-update command today. After scaffolding, edit the existing plan body directly.
Required Inputs
- the user request, task doc, bug doc, or review finding that the plan is based on
- the existing implementation files likely to own the change
- adjacent tests and architecture docs when ownership or boundaries matter
- nearby
.planr/plans/*.plan.md examples when creating a new plan shape from scratch
Required Plan Shape
Create or update a file under .planr/plans/*.plan.md with:
- frontmatter fields:
name
overview
todos
isProject
- body sections:
## Scope Decision
## Ownership Target
## Existing Leverage
## Phase 1: ... and later phases as needed
## Out Of Scope
## Verification
## Acceptance Criteria
Prefer Acceptance Criteria as the canonical heading. Do not rely on only Success Criteria.
Global live status belongs in .planr/status/current.json. The plan file stays the scoped execution contract.
File Placement And Naming
- Store tracked plan artifacts in
.planr/plans/
- Use the canonical filename shape
<slug>_<hash>.plan.md
- Prefer the shared
.planr CLI to scaffold the initial file when practical
- Do not create new numbered
docs/tasks/*.md files
- If converting an existing
docs/tasks/*.md artifact, promote one .planr/plans/*.plan.md successor and delete the old task doc only when the user explicitly asked for the hard cut
Task-Shaped Plan Extensions
When the user explicitly wants a tracked task artifact, a bug-to-plan conversion, a review-finding follow-up, or a hard-cut implementation contract, planr-plan should produce the richer task-shaped variant rather than inventing a separate planning skill.
In that case, include these sections unless the user explicitly asked for a smaller variant:
## Source
## Why this task exists
## Hard-Cut
## Relevant Files
## Notes
These sections support the same .planr execution contract; they do not replace Scope Decision, Ownership Target, phase checklists, verification, or acceptance criteria.
Phase Rules
Every phase must contain a tickable checklist in the body using - [ ].
Each checkbox must be:
- concrete
- falsifiable
- narrow enough that it can be proved with code or tests
- written so a reviewer can compare it against the repo diff
Do not:
- pre-check boxes in a new plan
- combine multiple meaningful outcomes into one checkbox
- hide verification as an implied final step
- use vague boxes like
clean up leftovers without naming what that means
- leave a hard-cut deletion ambiguous between "remove the old value" and "delete the dead concept"; the phase checklist must name which one is intended
Core Rules
- State what the plan covers and what competing interpretations were rejected.
- Read the real code before writing phases.
- Cite concrete files, symbols, and tests under
Existing Leverage.
- Separate
Runtime owner, First fix owner, and Canonical long-term owner.
- If the work removes a legacy mode, enum, config key, or selector option, decide explicitly whether the surrounding concept still has more than one meaningful current-state behavior.
- Treat frontmatter
todos as summary state only. The phase checklist plus verification evidence is the real completion bar.
Required Workflow
- Start from the source request and inspect the real owner layers before planning.
- If this is a new tracked plan, scaffold it with
./.planr/tooling/planr plan new ....
- Write
Scope Decision, Ownership Target, Existing Leverage, phase checklists, Out Of Scope, Verification, and Acceptance Criteria.
- For task-shaped work, add
Source, Why this task exists, Hard-Cut, Relevant Files, and Notes when they help later execution.
- Make every checkbox concrete, falsifiable, and reviewable against repo evidence.
- Make verification commands and blocked or unverified conditions explicit enough that later
planr-fix and planr-review runs do not need to reinterpret the contract.
Additional Resource
- Read ../planr-shared.md first for shared CLI coverage and shared
.planr rules.
- For the full template, reconciliation gate, and planning checklists, see reference.md