| description | Maintains project state in a markdown vault (key decisions, open questions, risks, contradictions, dependencies) from meeting transcripts, structured notes, PDF documents, or owner chat updates. Governs working tracks as the mandatory container for all productive activity (research, analysis, synthesis). Use for updating project-vault after meetings, dialog briefings, decision records, and next-meeting agendas. Triggers: project state, transcripts, meeting notes, PDF documents, chat updates, risks, dependencies, contradictions, ADR-style decisions, track creation and lifecycle, inbox processing. |
Project Vault — Personal Project Storage
Check owner's name in AGENTS.md in repo's root.
Users: owner + AI assistant.
Vault Core
Key artifacts, maintained up-to-date:
project-vault/decisions/ — atomic decision cards (DEC-NNNN-slug.md) + summary _index.md
project-vault/open-questions/ — atomic open question cards (Q-NNNN.md) + summary _index.md
project-vault/risks/ — atomic risk cards (RISK-NNNN.md) + summary _index.md
project-vault/contradictions/ — atomic contradiction cards (CON-NNNN.md) + summary _index.md
project-vault/archive/ — mirror structure for closed entities (risks, questions, contradictions, events, tracks)
project-vault/dependencies.md — external blockers
project-vault/state/overview.md — concise current state
project-vault/state/constraints.md — regulatory and architectural constraints
project-vault/tracks/ — operational tracks (TRK-NNNN.md + summary _index.md); tracks archive: archive/tracks/
project-vault/work/ — dated work records (WRK-YYYY-MM-DD-hhmmss.md + summary _index.md), template: work/_template.md
project-vault/methods/ — reusable method descriptions (U.MethodDescription, A.3.2) + summary _index.md
Auxiliary:
project-vault/events/ — event chronicle (YYYY-MM-DD-NN.md) + summary _index.md
project-vault/sources/ — captured originals (captures/) and analysis digests (digests/) + summary _index.md
project-vault/agenda-next.md — next meeting agenda (on demand)
Inbox Procedure
Inbox: on request "process inbox" (and similar), process files from inbox/ using project-vault skill procedures. After full processing — clear inbox/.
External research (independent Knowy research, narrativizations, articles, conference talks, tutorials) process via Procedure R — with two-way binding to any project entities that accept references (Q, RISK, CON, DEC, TRK).
PDF pre-processing: if .pdf files are found in the inbox — before substantive processing, convert each PDF to Markdown using the pdf2md skill (script scripts/extract_pdfs.py with parameters --source <inbox_dir> --first N). Use the resulting .md file (in inbox/_markdown/) as source material for further processing per the standard procedures (Procedure A, T.4). Do not analyze the original PDF directly — only via the converted Markdown. If the pdf2md skill is unavailable or the conversion fails — record this in the inbox processing result and notify the user.
Procedure A — State Update from Source
Input 1 — Meeting Transcript
- Save the captured source to
project-vault/sources/captures/.
- Create
project-vault/sources/digests/YYYY-MM-DD_slug.md using customized project-vault/sources/_digest-template.md or otherwise default template templates/digest-meeting.md.
- Q Registry in Context: before filling, read active rows in
project-vault/open-questions/_index.md (status: open).
- Fill digest only with what is verifiable from the source: context, links to created atomic files (DEC, Q, RISK, CON), reconciliation against Q registry. Decision/question/risk wording — only in atomic files, never copied into digest.
- For key decisions: create/update
project-vault/decisions/DEC-NNNN-slug.md using customized project-vault/decisions/_decision_template.md or otherwise default template templates/decision.md; accepted only upon explicit approval in the source.
- Execute common steps below.
When input is insufficient:
- If transcript lacks enough information to fill a digest meaningfully → create a minimal digest noting "insufficient data" and stop.
- If a decision is mentioned but not explicitly approved → set
status: proposed, note in digest "not yet accepted — pending owner confirmation".
- If a contradiction is suspected but not clearly stated → create CON entry with
status: proposed and note "requires clarification".
Input 2 — Dialogue News (no new transcript)
- Create
project-vault/sources/digests/YYYY-MM-DD_slug.md using template templates/digest-dialogue.md.
- For key decisions — create/update DEC-* with
sources pointing to digest.
- If signals to active Q-* exist — record reconciliation.
- Execute common steps below.
When input is insufficient:
- If the user statement is opinion/preference rather than a verifiable decision → create a digest noting "opinion expressed, not a decision" and skip DEC creation.
- If the dialogue contradicts an existing
accepted decision → create CON entry and flag the decision with revisit_by or note in _index.md.
Common Steps After Input 1 or 2
- Update
project-vault/state/overview.md when substantial new facts appear or when accepted decisions are made.
- When creating/closing atomic entities — create/move the corresponding file (DEC, Q, RISK, CON) and update the summary
_index.md in the respective directory. Closed entities — into project-vault/archive/ (mirror structure).
- Update
project-vault/dependencies.md when new external blockers appear.
- Update
project-vault/events/ — new file YYYY-MM-DD-NN.md and _index.md upon significant changes.
- Track maintenance: when a source (meeting, briefing, directive) introduces a new operational signal, changes the status of an existing track, or closes one:
- New signal → create
project-vault/tracks/TRK-NNNN.md with status cue (using tracks/_template.md); add row to project-vault/tracks/_index.md.
- Status change → update the track file (
status field in frontmatter and inline status fields) and the corresponding row in tracks/_index.md. Status transitions follow the elaboration lifecycle: cue → problem-framed → method-selected → work-planned → in-progress → performed → evaluated. Side transitions: blocked (from any active status), deferred (from any active status), retired (terminal).
- Track closed/retired → move track file to
project-vault/archive/tracks/; remove row from tracks/_index.md.
- Track unblocked → restore previous active status and update
tracks/_index.md.
- Do NOT create a track for every DEC/RISK/Q — only for operational lines that represent distinct work streams with blockers. A track typically spans multiple related DEC/RISK/Q/CON entities.
- Assignments to repo owner: if a source (transcript, meeting protocol) contains an explicit assignment to the owner of this repo (referred by name) — only one directly expressed, without guessing or reading in:
- Read
project-vault/tracks/_index.md and select the most suitable existing track by topical similarity.
Procedure R — External Research (reference material)
Scope: material that is neither a meeting transcript nor dialogue news: independent research (Knowy), narrativization, article, conference talk, tutorial. The purpose of processing is for the material to be taken into account in decision-making, not left as an "orphan".
- Save the capture to
project-vault/sources/captures/.
- Create a digest
project-vault/sources/digests/YYYY-MM-DD_slug.md (source_kind: independent_research / web_article / conference / research_article).
- Read the entity registries (
project-vault/open-questions/_index.md, risks/_index.md, contradictions/_index.md, decisions/_index.md, tracks/_index.md) — determine which entities accept references and are relevant to the material's topic.
- Fill the "Reconciliation" section in the digest with a signal strength for each affected entity (
strong / partial / weak / supporting / no_signal).
- Propagate signals into the entity files themselves (mandatory, two-way link): for each affected entity (Q, RISK, CON, DEC — any that has a
sources/source field or a "Related entities" section), append the signal to its file — as a frontmatter field signal_YYYY-MM-DD or as a body note "Signal YYYY-MM-DD" with a link to the digest. Listing IDs only in the digest's "Reconciliation" (one-way link) is not sufficient.
- Bind the digest to at least one reference-bearing entity: add the digest to a track's "Related entities" → "Sources"/"Artifacts", or to the
sources/source/"Related entities" of a suitable Q/RISK/CON/DEC (by topical similarity).
- Create atomic entities (DEC/Q/RISK/CON) only if the material introduces a new decision/risk/question/contradiction. Purely reference material does not require them.
- If the material is truly outside the scope of all entities — explicitly write "not bound — outside the project scope" in the digest (a deliberate decision, not an omission).
- Update
project-vault/sources/_index.md (capture↔digest pair); on substantial contribution — overview.md and events/.
Procedure T — Track-Bound Productive Work
Scope: any productive activity (research, analysis, synthesis, architecture elaboration, artifact writing) is performed only within a track. Small one-step requests ("find a file", "explain a concept", "fix a typo") do not require a track.
T.1 — User Request Arrives
- Determine whether the request is productive activity (research, analysis, synthesis, multi-step work) or a small one-step task.
- If it is a small task — perform it without a track, report the result.
- If the request does not point to a specific track (e.g., "let's continue", "let's keep going"):
a. Get the top-5 tracks by last-modified time:
Get-ChildItem project-vault\tracks\TRK-*.md | Sort-Object LastWriteTime -Descending | Select-Object -First 5.
b. Additionally review all active tracks (not performed, not evaluated, not retired) for deadlines in "Next moves": single out those with a (deadline YYYY-MM-DD) date within 3 calendar days of today (including overdue ones — marked "overdue").
c. Show the combined list: top-3 by freshness + tracks with an approaching deadline (marked "approaching deadline YYYY-MM-DD" or "overdue deadline YYYY-MM-DD"). Sort: first overdue, then nearest deadline, then fresh. Propose the most urgent. Wait for confirmation.
- If it is productive activity with an explicit topic — check
project-vault/tracks/_index.md for a suitable track:
- Exactly one suitable → report in chat: "Continuing track TRK-NNNN (title), current status — X. Transitioning to Y." Wait for confirmation.
- Several similar → show all candidates with their statuses, propose the most suitable. Wait for confirmation.
- None suitable → report: "Creating a new track for [request essence]." Wait for confirmation.
- After confirmation — act on the track.
T.2 — New Track Creation
- A new track always starts with status
cue.
- Further advancement — strictly per FPF-core:
cue → problem card formulation (C.22.2 ProblemCard@Context) → problem-framed → method selection (G.5/A.15) → method-selected → work plan (A.15.2) → work-planned → execution (A.15.1) → performed → result evaluation → evaluated.
- At each transition: announce in chat the intent to move the track to the next status with a brief rationale (what exactly changed), wait for confirmation, then update the track and
_index.md.
- Track creation: file
TRK-NNNN.md per template tracks/_template.md + a row in tracks/_index.md.
T.3 — Track Continuation
- When continuing an existing track: report in chat the current status, the next status, and a brief rationale for the transition. Wait for confirmation.
- After confirmation: update
status in frontmatter and in the track's status fields, update the row in _index.md.
- If work within the track creates new artifacts (
artifacts/) — list them in the track's "Related entities" section.
- If a substantive step that produced a result was performed — create a WRK file per Procedure W.2 and add a line to the track's "Completed moves".
- If a blocker is discovered during work — move the track to
blocked, record the blocker in the track's status fields. On unblocking — restore the previous active status.
T.4 — Inbox Processing and Tracks
When processing the inbox:
- If the material contains research or valuable artifacts → file it into the relevant existing track or create a new one (per T.1–T.2).
- If the material contains a transcript/meeting protocol → process it per the existing Procedure A, update related entities (DEC, Q, RISK, CON). If the meeting affects an existing track — update its status/blockers/next moves.
Procedure AR — Artifact Creation
Scope: any artifact (artifacts/YYYY-MM-DD-slug.md) is created bound to a track and recorded as a WRK.
AR.1 — Track binding and plan check
- Determine which track the artifact being created belongs to. Check against
project-vault/tracks/_index.md: the artifact's topic must match the track's essence.
- Check whether the work of creating the artifact is in this track's "Next moves":
- There is an explicit item → use it as
plan_item_ref in the future WRK.
- No explicit item, but the topic matches → before creating the artifact, add an item to the track's "Next moves", announce in chat.
- No track fits → create a new track (Procedure T.2) with status
cue, then add an item to "Next moves".
- Report in chat: "Artifact [essence] belongs to track TRK-NNNN, plan item — [N or 'new item added']. Proceeding." Wait for confirmation.
AR.2 — Collecting relevant materials
- Read the track's ProblemCard@Context — the core of the problem.
- Collect all relevant materials from the track: links to DEC, Q, RISK, CON, artifacts, WRK, digests — everything related to the topic of the artifact being created.
- If necessary — read the atomic files of related entities (DEC, CON, Q, RISK) for full context.
- If the artifact relies on FPF patterns — load the corresponding references from fpf-core.
AR.3 — Preparing and writing the artifact
- Create the file
artifacts/YYYY-MM-DD-slug.md.
- Follow guardrail 6: the artifact must be self-contained and alienable — readable without consulting other project entities. References to DEC-NNNN, Q-NNNN, etc. are prohibited; instead of an entity code, give a brief substantive description.
- Follow the language rule: narration in Russian, English inclusions — only proper names, technology names, and terms without a stable Russian equivalent.
AR.4 — Recording completed work (WRK)
- After writing the artifact — immediately create a WRK file per Procedure W.2.
- In
plan_item_ref, specify the item from the track's "Next moves" identified at step AR.1.
- In
output_refs, specify the created artifact.
- Update the track's "Completed moves" and
work/_index.md.
- If the artifact closes a PlanItem — delete the item from the track's "Next moves" (the completed item is already recorded by the WRK in "Completed moves"). Do not strike through
~~...~~ and do not mark [x]. If partial — leave it with a clarification.
Procedure W — Work Record
Scope: every completed substantive step within a track is recorded as an atomic file project-vault/work/WRK-YYYY-MM-DD-hhmmss.md. A work record is U.Work (A.15.1): a dated occurrence of work. The record is a separate episteme denoting the occurrence.
W.1 — When to create a WRK
Create a WRK file when:
- A substantive step was performed within a track that produced a new result (artifact, decision, analysis, structural change to project-vault).
- The result of the step must be traceable in the running log
work/_index.md.
Do not create a WRK for:
- Item 0 in "Next moves" (reconnaissance, freshness check).
- Small administrative actions (updating
_index.md without substantive work).
- Fixing obvious errors (typos, formatting).
W.2 — Creating a WRK
- Determine
hhmmss — the current time (the moment the step is completed).
- Create the file
project-vault/work/WRK-YYYY-MM-DD-hhmmss.md per template work/_template.md.
- Fill in the frontmatter:
id, completed (completion moment, YYYY-MM-DD hh:mm:ss), performer, performed_under (track).
plan_item_ref — the number of the item from the track's "Next moves" that was performed (optional for the thin form).
enacted_method — the FPF pattern applied (one or more, comma-separated).
input_refs — incoming entities: preceding WRKs, DEC, artifacts, source tracks (optional for the thin form).
output_refs — created/changed entities: artifacts, decisions, tracks, risks, questions, contradictions.
status: performed (completed), partial (partial), probe (reconnaissance), rework-needed.
- Write the body: 1–3 paragraphs describing the completed work. Do not duplicate the content of the output artifact.
- Add a line to the track's "Completed moves":
[[WRK-YYYY-MM-DD-hhmmss]] — FPF-pattern: brief essence.
- Add a line to
project-vault/work/_index.md (table: ID, Track, FPF-pattern, Essence). Append new entries to the bottom of the table (chronological order). A few works done in parallel may make the order slightly non-chronological — that is acceptable, do not re-sort.
- If the step closes a PlanItem — delete the item from the track's "Next moves" (the completed item is recorded by the WRK in "Completed moves"), renumber the remaining items if necessary. Do not strike through
~~...~~ and do not mark [x]. If partial — leave it with a clarification.
- If the step created new entities (DEC, RISK, Q, CON, TRK) — update the corresponding
_index.md.
W.3 — Resuming a track
When returning to a track, the reading order is:
- ProblemCard@Context in the track body — problem side, context, scope cut.
- "Next moves" — the remaining PlanItems.
- "Completed moves" — the list of WRKs. If necessary — open the atomic file for details.
- Item 0 in "Next moves" (if present) — resumption actions.
Procedure E — Next Meeting Agenda
Update project-vault/agenda-next.md using template templates/agenda.md: top questions, blockers, contradictions, risks; slots from project-vault/decisions/ (close proposed, return deferred with approaching revisit_by).
When blocked:
- If
agenda-next.md does not exist yet → create from template.
- If there are no open questions/risks/contradictions → fill only the "0–5 Goal" slot and note "agenda empty — no open items."
Guardrails
- Any new claim — link to source (digest, capture).
- No basis in source — do not mark as resolved.
- Two incompatible formulations — atomic file in
contradictions/ + row in _index.md.
- Do not set decision status to
accepted without explicit wording in sources.
- Reports are off-limits without request: do not create or update
project-vault/reports/* without explicit request.
5a. Agenda is off-limits without request: do not create or update project-vault/agenda-next.md without explicit request. When requested, fill using Procedure E.
- Artifacts must be self-contained and alienable (
artifacts/): every artifact must be readable and understandable without consulting any other project entity. References to internal project entities (DEC-NNNN, Q-NNNN, RISK-NNNN, CON-NNNN, INV-NN, FR-XXX-NN, etc.) are prohibited. Instead of an entity code, always provide a brief substantive description inline.
- Track discipline: a track (
tracks/TRK-NNNN.md) must have exactly one current status. Status is stored in both frontmatter (status:) and the inline table. When updating a track, update both. Do not delete tracks — retired tracks go to archive/tracks/. A track must have at least one blocker.
- Track-bound work: any productive activity (research, analysis, synthesis) must be performed within a track (Procedure T). Before acting, announce intent in chat, get user confirmation, then proceed. Do not skip statuses — always start at
cue and advance step by step.
- Work records mandatory: every completed productive step within a track that produces a new result must be recorded as a WRK file (
project-vault/work/WRK-YYYY-MM-DD-hhmmss.md) per Procedure W. The track's "Completed moves" list and work/_index.md must be updated accordingly.
- One track — one ProblemCard@Context: ProblemCard lives in the track body. If work discovers a new independent problem signal (different EntityOfConcern, different scope cut) — create a child track with its own ProblemCard, not a second ProblemCard in the same track.
- File name uniqueness: file names (except
_index.md) must not repeat across different project-vault directories. For example, if artifacts/YYYY-MM-DD_slug.md is created, then a sources/digests/YYYY-MM-DD_slug.md with the same name must not be created — the digest or artifact gets a distinguishing name (via a different slug). The rule eliminates collisions in references (Obsidian, grep) and eases navigation.
After Changes
Briefly list modified and created files.
Evolution
If the user is dissatisfied with a result or clarifies the process, offer to update this skill. When updating:
- If the trigger is wrong → fix the
description in frontmatter.
- If a procedure is incomplete → add steps or failure paths in the relevant Procedure section.
- If a template is missing fields → update the template file in
templates/.
- If the vault schema changed → update
references/architecture.md.