| description | Creates a pre-launch checklist covering engineering readiness, marketing preparation, customer support, legal review, and communications for product or feature launches. Use when the user asks about product launch checklists, go-live preparation, launch readiness, pre-launch planning, or feature release preparation.
Do NOT use for go-to-market strategy (use go-to-market-strategy), product roadmaps (use product-roadmap), or PR pitches (use pr-pitch).
|
| license | Apache-2.0 |
| metadata | {"author":"foundry-skills","version":"1.0.0","tags":"checklist planning project-management template strategy","category":"business-strategy","subcategory":"product-management","depends":"","disclaimer":"none","difficulty":"beginner"} |
Product Launch Checklist
When to Use
Use this skill when:
- A user is preparing to launch a new product, major feature, or significant update and needs a structured pre-launch checklist covering all cross-functional workstreams
- A user asks for a "go-live checklist," "launch readiness review," "release preparation document," or "pre-launch audit" for a product or feature
- A user needs to coordinate engineering, marketing, customer support, legal, and communications teams ahead of a specific launch date
- A user wants to build a go/no-go decision framework with specific criteria and decision-makers before a release
- A user is running a phased rollout, beta release, or feature flag deployment and needs a structured checklist to manage it
- A user has a fixed launch date (tied to a conference, seasonal event, or contractual deadline) and needs to work backward to ensure all dependencies are resolved
- A user is launching into a regulated industry (healthcare, fintech, edtech) and needs to ensure compliance checkpoints are embedded in the pre-launch process
Do NOT use this skill when:
- The user needs a full go-to-market strategy with segmentation, positioning, pricing, and channel strategy -- use
go-to-market-strategy
- The user wants a product roadmap showing what will be built and when -- use
product-roadmap
- The user needs a PR pitch, press release, or journalist outreach strategy -- use
pr-pitch
- The user wants a feature specification or product requirements document -- use
feature-spec
- The user needs a post-launch retrospective or incident post-mortem -- use
incident-postmortem or retrospective
- The user is asking about agile sprint planning or release management within a development cycle -- use a sprint planning skill
- The user wants competitive positioning or launch messaging strategy -- the checklist assumes messaging is already decided; use
go-to-market-strategy first
Process
Step 1: Gather Launch Context Before Building the Checklist
Do not generate a generic checklist before understanding the launch. Ask the user for the following inputs, and use their answers to customize every section:
- What is being launched: New standalone product, major feature (changes core user flows), minor feature (additive, low-risk), API or integration, mobile app update, infrastructure change, or pricing/packaging change
- Launch date and flexibility: Fixed (conference keynote, contractual deadline, seasonal) or flexible (internal target with wiggle room)
- Target audience: All existing users, a specific segment (enterprise accounts, free tier, geographic market), a beta group, or net-new prospects only
- Rollout strategy: Big-bang (all users simultaneously), phased by percentage (10% / 25% / 50% / 100%), feature-flagged by segment, or canary (small percentage of production traffic)
- Scale: Daily active users, expected traffic increase, geographic distribution, third-party dependencies that could be stressed
- Cross-functional teams involved: At minimum, ask which of these are in scope: Engineering, QA, Design, Product, Marketing, Sales, Customer Success, Support, Legal/Compliance, Finance, Security, DevOps
- Known risks: Anything already flagged as a concern -- performance unknowns, unresolved bugs, compliance questions, marketing dependencies on external vendors
Use these answers to mark sections as Required, Optional, or Not Applicable in the final checklist. A minor feature update for internal users does not need a PR section. A launch involving PII data collection requires the full legal and security section.
Step 2: Build the Engineering Readiness Checklist
Engineering readiness is the gating dependency for everything else. Build this section with the following specifics:
-
Code completeness and review:
- All planned features merged and code-reviewed by at least one senior engineer
- No open pull requests that are required for the launch scope
- Feature branch merged to main/release branch; no pending cherry-picks
- Deployment artifacts built, versioned, and stored in the artifact registry (not built at deploy time)
-
Test coverage:
- Unit tests passing with coverage at or above the team's agreed threshold (typically 70-80% for new code)
- Integration tests covering all new API endpoints and service-to-service calls
- End-to-end tests passing in staging environment (not just local)
- Regression suite passing -- confirm no existing functionality is broken
- If the feature involves real-time or WebSocket behavior: concurrent connection tests completed
- If the feature involves file uploads, data imports, or batch processing: volume tests with representative data size
-
Performance and load testing:
- Load test results documented: transactions per second, P50 / P95 / P99 latency, error rate at expected peak load
- Expected peak load defined in concrete terms (e.g., 2x current DAU, spike to 500 concurrent users within first 30 minutes of launch)
- Database query performance reviewed: no queries with full table scans at projected data volume, index plan verified
- Third-party API rate limits reviewed: confirm the launch will not hit rate limits on payment processors, email providers, notification services, or other external dependencies
-
Security review:
- OWASP Top 10 review completed for any new user-facing input fields, file uploads, or authentication flows
- New data collection reviewed: confirm what PII is stored, where, and for how long
- Authentication and authorization tested: confirm new features respect existing access control rules
- Dependency audit run: no known critical or high CVEs in newly added packages (use a tool like Snyk, Dependabot, or similar)
- Penetration test or security review required if the feature handles payments, health data, or sensitive documents
-
Infrastructure and deployment:
- Database migrations tested in staging with production-like data volume (not just an empty schema)
- Migration runtime measured: if migration takes more than 60 seconds, plan for maintenance window or zero-downtime migration pattern
- Environment variables and configuration changes documented and deployed to staging; not relying on manual steps at launch time
Step 3: Build the Marketing and Communications Checklist
Marketing readiness depends entirely on the launch type. A major external launch needs all items. An internal beta needs almost none. Apply judgment based on Step 1 answers.
-
Messaging and positioning:
- Core value proposition statement finalized and approved by Product and Marketing leadership
- Key messages defined: what the feature does, who it is for, what problem it solves, and one key differentiator
- Elevator pitch (2-3 sentences) agreed upon -- this becomes the source of truth for all written copy
- Screenshots, product demo video, or interactive walkthrough created and approved
-
Owned channel content:
- Blog post or changelog entry written, reviewed, and scheduled (for major features: full blog post; for minor features: changelog entry is sufficient)
- Email to existing users drafted, segmented appropriately (do not email users who cannot access the feature yet), reviewed for deliverability (subject line, preview text, plain-text version)
- In-app announcement or tooltip flow configured and QA'd -- the in-product experience is often the highest-reach channel
- Website product page or feature page updated to reflect the new capability
- Help center articles written and indexed (not drafted -- fully published and searchable before launch)
-
Paid and social channels:
- Social media posts written for each active platform (do not copy-paste -- adapt for platform tone and format)
- Paid campaigns paused or updated to reflect the new capability if relevant
- Social media monitoring set up to catch user reactions, complaints, or questions on the day of launch
-
Sales and partner enablement:
- Sales team briefed with talk track, FAQ, and objection handling (minimum 48 hours before launch, not on launch day)
- Competitive positioning memo updated if the new feature changes the competitive landscape
- Partner or integration marketplace listings updated if applicable
-
Internal communications:
- Company-wide announcement prepared (Slack, email, or all-hands -- match the launch scale to the communication scope)
- Customer Success team briefed separately from Support: they need to know how to proactively discuss the feature with key accounts
- Executive team briefed with launch metrics they will be watching
Step 4: Build the Customer Support Checklist
Support is the most common under-resourced workstream in a launch. Deficiencies here directly cause public negative reviews, social media complaints, and churn.
-
Training:
- Support team training completed at least 48 hours before launch (not the morning of)
- Training must include: what the feature does, how to demo it, known issues and workarounds, and what to do when they do not know the answer
- Recorded training session available for asynchronous viewing by distributed team members in other time zones
- QA completed: at least 2-3 support agents have personally used the feature in staging, not just watched a demo
-
Documentation:
- FAQ document created with the top 10-15 questions predicted from the feature (derived from beta feedback, similar past launches, or support pattern analysis)
- Troubleshooting guide created for the top 3-5 error states users will encounter
- Response templates created for expected contact types (e.g., "I cannot find the new feature," "The real-time editing is not working for me")
- Known issues register published internally, updated in real time during launch, with workaround for each item
-
Escalation and staffing:
- L1 / L2 / L3 escalation path defined for launch-specific issues (L1: support agent; L2: senior support or CS; L3: engineering on-call)
- Engineering escalation contact (specific person, not just "the engineering team") designated for launch day
- Staffing plan for launch window: if you have 8,000 DAU and typically receive 0.5% daily support contacts, plan for 2-3x that volume in the first 24 hours
- Support queue monitoring assigned: a specific person watches the queue volume and type of contacts during launch, not just a passive wait
-
Feedback collection:
- In-app feedback mechanism configured (NPS survey, thumbs up/down, or "Was this helpful?" prompt) with appropriate timing delay (do not prompt after 5 seconds of use -- wait for a meaningful interaction)
- Support tagging convention defined: new contacts related to the launch should be tagged with a specific label so volume can be tracked
- First-week feedback review scheduled: who reads the feedback, when, and how it feeds back to the product team
Step 5: Build the Legal and Compliance Checklist
Legal review timelines are often the longest lead-time item in a launch. Identify legal dependencies in Step 1 and initiate legal review at least 2-3 weeks before the launch date.
Step 6: Build the Go/No-Go Decision Framework
The go/no-go meeting is not a status update -- it is a decision gate. Structure it properly.
-
Decision criteria: Define which items are hard blockers (launch cannot proceed) versus soft blockers (launch proceeds with a documented risk and mitigation plan)
- Typical hard blockers: unsolved critical security vulnerability, rollback procedure not documented, support team not trained, critical regulatory item unresolved
- Typical soft blockers: non-critical bugs with workarounds, some marketing assets not ready, minor performance issues within acceptable thresholds
-
Decision meeting logistics:
- Schedule 24-48 hours before launch time -- this gives time to execute a contingency plan if the decision is "no-go"
- Attendees: PM (facilitator), Engineering Lead, Head of Support, Marketing Lead, and legal representative if compliance items are in scope
- Duration: 30 minutes maximum -- this is a decision meeting, not a working session
- Pre-read: send the completed checklist with current status for each item at least 2 hours before the meeting
-
Decision outcomes:
- Go: All hard blockers resolved, soft blockers documented with owners and timelines
- Conditional go: Launch proceeds with specific conditions (e.g., launch only to internal users first, reduce initial rollout to 5%)
- No-go with date: Launch delayed to a specific new date (not "TBD") with the specific items that must be resolved
- Scope reduction: Launch on the planned date with reduced scope (remove the riskiest sub-feature, launch to a smaller segment)
-
Contingency communication:
- If the decision is no-go: who communicates the delay, to whom, and when (within 1 hour of decision, not next-day)
- For external launches with scheduled communications: have a "launch postponed" holding statement ready to publish
Step 7: Create the Launch Day Run Sheet
The run sheet converts the checklist into a time-ordered sequence of actions with named owners.
-
Pre-launch window (T-24 hours to T-2 hours):
- Final staging verification: engineering team confirms staging environment is in the expected state
- Go/no-go meeting (if scheduled here, see Step 6)
- Communications assets final review: blog post, email, social posts all queued and reviewed one final time
- On-call engineers confirmed available and briefed on their specific watch areas
- Monitoring dashboards and alert channels confirmed functional (not just set up -- actively verified)
-
Launch window (T-2 hours to T+2 hours):
- Internal notification to stakeholders that launch is beginning
- Deployment or feature flag activation executed by the named engineer, not a general instruction to "the engineering team"
- Initial smoke test by PM or QA within 5-10 minutes of deployment: manually verify the feature works as expected for a real user
- First metrics check at T+15 minutes: error rate, latency, feature adoption signal (first 15 minutes of data should look normal or positive)
- External communications sent at T+30 minutes (not before the smoke test passes)
- First internal update sent to stakeholders at T+1 hour with brief status ("launch proceeding normally, X users have accessed the feature, no critical issues")
-
Post-launch monitoring (T+2 hours to T+24 hours):
- Metrics review at T+4 hours: error rate trend, P95 latency, feature adoption curve (is it matching projections?)
- Support queue review at T+4 hours: volume and type of contacts; escalate any unexpected patterns
- Social media sentiment check at T+4 hours
- T+24 hour metrics snapshot: DAU impact, feature activation rate, error rate, support contact volume -- document these as the baseline for post-launch review
-
Rollback triggers (must be specific numbers, not qualitative descriptions):
- Error rate exceeds 2% of requests (baseline: document the pre-launch error rate so you have a real comparison)
- P95 latency exceeds the pre-launch baseline by more than 50% sustained for 10+ minutes
- A P0 bug is confirmed by engineering (data loss, security vulnerability, authentication bypass)
- Support contact volume exceeds 5x the normal daily rate within the first 4 hours
- Payment or billing-related errors exceed 0% (any payment error is a P0)
Output Format
## Launch Checklist: [Product/Feature Name]
**Version:** [1.0] | **Created:** [Date] | **Owner:** [PM Name]
---
### Launch Overview
| Field | Detail |
|---|---|
| **Launch name** | [Descriptive name, not just a ticket number] |
| **Launch date and time** | [Date, time, timezone] |
| **Launch type** | [New product / Major feature / Minor feature / Beta / Internal] |
| **Target audience** | [All users / Segment description / Beta group / Internal only] |
| **Rollout strategy** | [Big-bang / Phased: 10%→25%→50%→100% / Feature-flag by segment / Canary] |
| **Go/no-go decision** | [Date, time, timezone -- Decision maker: Name] |
| **Post-launch review** | [Date, time -- Owner: Name] |
| **Estimated reach on day 1** | [Number of users or percentage of DAU] |
---
### Engineering Readiness
#### Code and Testing
- [ ] All features merged to release branch; no pending required PRs
- [ ] Unit tests passing (coverage: [X]% -- threshold: [Y]%)
- [ ] Integration tests passing in staging
- [ ] End-to-end tests passing in staging
- [ ] Regression suite passing -- no existing features broken
- [ ] [Feature-specific test]: [description and result]
#### Performance
- [ ] Load test completed at [X] concurrent users (representing [Y]% peak load)
- P50 latency: [X]ms (target: <[Y]ms)
- P95 latency: [X]ms (target: <[Y]ms)
- P99 latency: [X]ms (target: <[Y]ms)
- Error rate: [X]% (target: <[Y]%)
- [ ] Database query plan reviewed; no full table scans at projected volume
- [ ] Third-party API rate limits reviewed: [service name, limit, expected usage]
#### Security
- [ ] OWASP review completed for new input surfaces
- [ ] New data collection reviewed and documented: [what PII, where stored, retention period]
- [ ] Authorization rules tested: new feature respects existing access controls
- [ ] Dependency audit: no critical/high CVEs in new packages
#### Infrastructure and Deployment
- [ ] Database migration tested in staging with production-like data volume
- Migration runtime: [X] seconds (reversible: Yes / No)
- [ ] Environment variables deployed to production (not manual steps at launch time)
- [ ] Feature flags configured:
- Flag name: [flag_name] | Initial state: [OFF / ON for X% / ON for group Y]
- [ ] CDN cache invalidation plan: [assets affected, invalidation trigger]
- [ ] Artifact built and stored in registry (not built at deploy time): [version tag]
#### Observability
- [ ] Monitoring dashboard live: [link]
- Watches: error rate, latency P50/P95/P99, throughput, [feature-specific metric]
- [ ] Custom metrics configured: [list feature-specific metrics]
- [ ] Alert rules configured:
- Alert: error rate > [X]% → [channel and on-call]
- Alert: P95 latency > [X]ms sustained [Y] min → [channel and on-call]
- [ ] Structured logs flowing to log aggregation platform
- [ ] On-call roster updated: Primary: [Name], Secondary: [Name], Escalation: [Name]
#### Rollback
- [ ] Rollback procedure documented: [link]
- [ ] Rollback tested in staging: confirmed working on [date]
- [ ] Rollback decision authority: [Name and contact]
- [ ] Data rollback strategy (if migration not reversible): [describe]
**Engineering readiness sign-off:** [Engineering Lead] -- [Date]
---
### Marketing and Communications
#### Messaging
- [ ] Core value proposition statement approved by: [Name, Date]
- [ ] Elevator pitch (2-3 sentences) finalized
- [ ] Product screenshots / demo video created and approved
#### Content Assets
- [ ] Blog post / changelog: [Status] | Publish date: [Date] | Author: [Name]
- [ ] User email: [Status] | Send date: [Date] | Segment: [Description] | List size: [N]
- [ ] In-app announcement / tooltip: [Status] | Trigger condition: [Description]
- [ ] Website product page update: [Status] | URL: [URL]
- [ ] Help center articles: [X] articles published | Links: [list]
#### Social and Paid
- [ ] Social posts prepared: [Platforms] | Scheduled for: [Date/Time]
- [ ] Social monitoring configured for launch day: [Tool / Keyword list]
- [ ] Paid campaigns updated / paused as needed: [Status]
#### Enablement
- [ ] Sales team briefed: [Date] | Talk track link: [link] | Objection handler: [link]
- [ ] Customer Success team briefed: [Date] | Account priority list for proactive outreach: [link]
- [ ] Partner / integration marketplace listings updated: [Status or N/A]
#### Internal
- [ ] Company-wide announcement: [Channel] | [Date/Time]
- [ ] Executive briefing sent: [Date] | Key metrics they are watching: [list]
**Marketing readiness sign-off:** [Marketing Lead] -- [Date]
---
### Customer Support Readiness
- [ ] Support team training completed: [Date] (≥48 hours before launch)
- Training format: [Live session / Recording / Both]
- Attendance confirmed: [X of Y agents trained]
- [ ] Agents have personally used the feature in staging: [Confirmed by: Name, Date]
- [ ] FAQ document published: [Link] | [X] questions covered
- [ ] Troubleshooting guide published: [Link] | Top errors covered: [list]
- [ ] Response templates created for:
- [ ] "I cannot find the new feature"
- [ ] "The feature is not working for me"
- [ ] [Feature-specific expected question 1]
- [ ] [Feature-specific expected question 2]
- [ ] Known issues register created: [Link] | Updated in real time by: [Name]
- [ ] Escalation path defined:
- L1 → L2: [condition and contact]
- L2 → Engineering on-call: [condition and contact: Name, channel]
- [ ] Launch window staffing plan: [number of agents], [hours of coverage], [queue owner]
- [ ] Support tagging convention: [tag name for launch-related contacts]
- [ ] Feedback collection configured: [mechanism, trigger timing, review owner]
**Support readiness sign-off:** [Support Lead] -- [Date]
---
### Legal and Compliance
| Item | Status | Required | Owner | Completed Date |
|---|---|---|---|---|
| Terms of service review | [ ] | [Yes / No / N/A] | [Name] | |
| Privacy policy review | [ ] | [Yes / No / N/A] | [Name] | |
| Cookie consent / CMP update | [ ] | [Yes / No / N/A] | [Name] | |
| GDPR compliance review | [ ] | [Yes / No / N/A] | [Name] | |
| CCPA compliance review | [ ] | [Yes / No / N/A] | [Name] | |
| [Regulation specific to industry] | [ ] | [Yes / No / N/A] | [Name] | |
| WCAG 2.1 AA accessibility audit | [ ] | [Yes / No / N/A] | [Name] | |
| Enterprise contract review | [ ] | [Yes / No / N/A] | [Name] | |
| Security review sign-off | [ ] | [Yes / No / N/A] | [Name] | |
**Legal readiness sign-off:** [Legal / Compliance Lead] -- [Date]
---
### Go/No-Go Decision
**Meeting:** [Date] at [Time] [Timezone]
**Facilitator:** [PM Name]
**Attendees:** [List]
**Pre-read sent by:** [Date/Time, at least 2 hours before]
#### Hard Blockers (Launch cannot proceed if any are unresolved)
| Criterion | Status | Owner |
|---|---|---|
| No unresolved critical or high security vulnerabilities | [ ] | Engineering Lead |
| Rollback procedure documented and tested | [ ] | Engineering Lead |
| Support team trained (≥48 hours prior) | [ ] | Support Lead |
| All required legal/compliance items resolved | [ ] | Legal Lead |
| Load test passed at projected peak load | [ ] | Engineering Lead |
| [Feature-specific hard blocker] | [ ] | [Owner] |
#### Soft Blockers (Documented risk; launch may proceed with mitigation)
| Criterion | Status | Mitigation Plan | Owner |
|---|---|---|---|
| All marketing assets complete | [ ] | [Mitigation if incomplete] | Marketing Lead |
| No P2 or lower open bugs | [ ] | [Workaround documented] | Engineering Lead |
| [Other soft blocker] | [ ] | | |
**Decision:** [ ] Go | [ ] Conditional Go -- Condition: [describe] | [ ] No-Go -- Reschedule to: [Date]
**Decision maker:** [Name]
**If no-go, notify:** [Names and channels, within 1 hour of decision]
---
### Launch Day Run Sheet
| Time | Action | Owner | Dependencies | Status |
|---|---|---|---|---|
| T-24h | Final staging verification and smoke test | Engineering | Staging env stable | [ ] |
| T-24h | Communications assets final review | Marketing | All assets queued | [ ] |
| T-24h | Go/no-go meeting (if not held earlier) | PM | Checklist complete | [ ] |
| T-2h | On-call engineers confirmed available | PM | On-call roster | [ ] |
| T-2h | Monitoring dashboards verified active | Engineering | Alerts configured | [ ] |
| T-1h | Internal notification: launch beginning | PM | Go decision confirmed | [ ] |
| T-0 | Deploy / activate feature flag | [Engineer Name] | All pre-checks done | [ ] |
| T+10m | Manual smoke test (PM or QA) | [Name] | Deployment complete | [ ] |
| T+15m | First metrics check: error rate, latency | [Engineer Name] | Monitoring live | [ ] |
| T+30m | External communications sent | Marketing | Smoke test passed | [ ] |
| T+1h | Internal launch status update to stakeholders | PM | First metrics reviewed | [ ] |
| T+4h | Metrics + support queue review | PM + Engineering + Support | | [ ] |
| T+4h | Social sentiment check | Marketing | | [ ] |
| T+24h | Metrics snapshot documented | PM | | [ ] |
| T+48h | Post-launch review meeting | All teams | Metrics snapshot ready | [ ] |
---
### Rollback Triggers
| Trigger Condition | Threshold | Action | Decision Authority |
|---|---|---|---|
| Error rate elevated | >[X]% sustained for >5 min (baseline: [Y]%) | Disable feature flag; investigate | Engineering Lead |
| P95 latency elevated | >[X]ms sustained for >10 min (baseline: [Y]ms) | Investigate; disable flag if not resolved in 15 min | Engineering Lead |
| P0 bug confirmed | Any data loss, auth bypass, or payment error | Immediate rollback; PM and Exec notified | Engineering Lead (no need to wait for PM) |
| Support contact spike | >5x normal daily rate within first 4 hours | Assess pattern; escalate to PM for rollback decision | PM |
| [Feature-specific trigger] | [Threshold] | [Action] | [Name] |
**Rollback notification chain:** Engineering Lead → PM → [VP/Head of Product] → Support Lead → Marketing Lead (in that order)
---
### Post-Launch Success Metrics
| Metric | Baseline | Day 1 Target | Day 7 Target | Owner |
|---|---|---|---|---|
| Feature activation rate | N/A | [X]% of reached users | [Y]% of reached users | PM |
| Error rate | [pre-launch %] | <[X]% | <[X]% | Engineering |
| P95 latency | [pre-launch ms] | <[X]ms | <[X]ms | Engineering |
| Support contact volume | [daily baseline] | <[X]x baseline | Back to baseline | Support |
| [Feature-specific metric] | [baseline] | [target] | [target] | [owner] |
Rules
-
Never build the checklist before gathering launch context. A generic checklist is worse than no checklist because it creates false confidence. A privacy policy update is irrelevant for an internal tool. A load test threshold is meaningless without knowing current DAU. Always run Step 1 first.
-
Every rollback trigger must be a specific, measurable number. "If things look bad" is not a trigger. "If error rate exceeds 2% of requests sustained for more than 5 minutes, and the pre-launch baseline is 0.3%" is a trigger. The comparison to baseline is required -- a 2% error rate is critical for one product and normal for another.
-
The go/no-go meeting must happen 24-48 hours before launch, not on launch day. Scheduling it on launch morning eliminates the ability to execute a contingency plan. If the decision is "no-go" at T-1 hour, it is too late to halt scheduled email sends, coordinated announcements, or social posts.
-
Support team training must complete at least 48 hours before launch. Training the support team the morning of launch means they will be handling real user issues before they have processed the information. The 48-hour buffer is not a suggestion -- it is the minimum time required for agents to absorb training, ask clarifying questions, and practice responses.
-
External communications may not be sent until the smoke test passes. Sending an email to 50,000 users announcing a feature that is broken in production is a worse outcome than a 30-minute delay. The run sheet must always sequence smoke test before external communications.
-
Legal review has the longest lead time and must be initiated first. Legal review for a new data collection feature typically takes 1-3 weeks. Initiating legal review in the final week before launch is not legal review -- it is a checkbox. Identify legal dependencies in Step 1 and flag them immediately so review can start with adequate lead time.
-
Database migrations that are not reversible require a data preservation strategy documented before the go/no-go meeting. A non-reversible migration means that rolling back the code does not return the system to its prior state. This is not a reason to block a launch, but it must be explicitly acknowledged and documented -- not discovered during a production rollback attempt.
-
Known bugs must be documented with severity, workaround status, and customer impact -- not hidden or minimized. The go/no-go decision requires complete information. A known P2 bug with no workaround affects enterprise customers differently than a P3 cosmetic issue. The people making the go/no-go decision must see the real list.
-
Edge Cases
Soft Launch or Limited Beta Release
Reduce the marketing section significantly -- no public blog post, no email to all users, no social media posts. Replace the marketing section with a beta-specific section: direct outreach to beta participants, a clear communication of what is and is not yet finished, and an explicit set of feedback channels (user interviews, in-app survey, dedicated Slack channel, or direct email). The engineering and support sections remain fully intact. The go/no-go section still applies. Beta releases often skip the go/no-go meeting; do not allow this -- a beta to 200 users still needs a rollback procedure and support escalation path.
Emergency Hotfix or Critical Security Patch
Compress the checklist to a minimal emergency version. Required items: engineering verification that the fix addresses the root cause (not just the symptom), staging test passing, rollback procedure documented, monitoring confirmed active, and the on-call engineer confirmed available. Skip all marketing items -- no user-facing announcement is needed for a security patch in most cases, though some regulatory regimes (GDPR breach notification) require customer communication within 72 hours if the vulnerability exposed user data. Support should be notified via a brief 5-minute briefing or written alert, but a full training session is not required. The standard 48-hour support training rule does not apply. Legal should be looped in immediately if the fix involves a potential data exposure.
International or Multi-Region Launch
Create a region-specific extension of the run sheet. Each region has its own: T-0 time in local timezone, external communications schedule (send the email at 9am local time, not 2am), and support coverage confirmation. Regulatory compliance items multiply by region -- GDPR applies to EU, PIPL applies to mainland China, LGPD applies to Brazil; confirm each is in scope and has been reviewed. Consider a "follow the sun" rollout pattern: launch in APAC first during their business day, let it stabilize for 8 hours, then launch in EMEA, then Americas. This pattern gives each region a fresh on-call rotation and limits simultaneous blast radius. Localized content (translated blog posts, localized help articles, in-product copy) must be reviewed by a native speaker, not just machine-translated.
Platform Launch (iOS, Android, and Web Simultaneously)
Mobile app store review timelines make simultaneous launches difficult. Apple App Store review typically takes 1-3 days but can take up to 7 days for new apps or features that require additional review (health data, payments, age ratings). Google Play review is typically 1-2 days. Build the mobile app store submission lead time into the launch plan, targeting app store submission 7-10 days before the planned launch date. If app store approval is delayed, the web launch can proceed on schedule but external communications must explicitly set expectations ("available on web now; iOS and Android coming within X days"). Never submit app store binaries on the day you need them approved. Feature flags allow the mobile experience to be gated even after the app is approved, enabling true simultaneous activation across platforms.
Re-Launch of a Previously Failed Feature
Add a dedicated section to the checklist: "Previous Launch Failure Review." This section must document: what the root cause of the previous failure was (not just symptoms), what specifically has changed to address each root cause, and what additional monitoring or safeguards have been added. The engineering team should write a brief incident summary of the previous failure and share it with all go/no-go decision-makers before the meeting. Rollback triggers should be set more conservatively than standard -- consider a 1% error rate threshold instead of 2%, and a shorter sustained-duration requirement (3 minutes instead of 5). The support team briefing must address the history: agents will encounter users who are skeptical or frustrated from the previous failure and need explicit guidance on how to respond ("We identified and fixed the issue that caused [X]; here is what changed").
Launch with Hard External Deadline (Conference, Press Embargo, Contractual)
A fixed external deadline fundamentally changes the risk calculus. Scope reduction becomes the primary risk mitigation tool when the date cannot move. Build the checklist with explicit scope tiers: Tier 1 (must ship on this date), Tier 2 (ship if ready), and Tier 3 (defer to next release). The go/no-go meeting must have a scope reduction decision ready -- not just "go or no-go" but "go with Tier 1 only, defer Tier 2, or full go." Legal and compliance items with external deadlines (press embargoes break if you are late; contractual penalties may apply) must be escalated to executive sponsors immediately if they are at risk. Never let a hard external deadline eliminate the rollback plan -- the feature can have an emergency disable mechanism even if the code is "live" for a keynote demo.
Launch Involving a Pricing or Packaging Change
Pricing changes require additional workstreams that a standard feature launch does not. Finance must review all pricing copy for accuracy before publication. Billing system changes must be tested end-to-end in staging, including upgrade flows, downgrade flows, proration calculations, and invoice generation. Customer Success must proactively communicate changes to existing paid customers before the public announcement -- surprising a paying customer with a price change via a general blog post is a significant churn risk. Legal must review pricing page copy for compliance with automatic renewal laws, refund policy obligations, and geographic pricing regulations. The go/no-go criteria must include billing system testing completion as a hard blocker.
Example
Input: "We're launching a new team collaboration feature in our project management SaaS tool next Tuesday. It includes real-time document editing, @mentions with notifications, and a comment threading system. We have about 12,000 daily active users across free and paid tiers. We want to phase the rollout and we're planning to blog about it."
Output:
Launch Checklist: Team Collaboration (Real-Time Editing, Mentions, and Commenting)
Version: 1.0 | Created: [Current Date] | Owner: PM
Launch Overview
| Field | Detail |
|---|
| Launch name | Team Collaboration -- Real-Time Editing, @Mentions, and Comment Threading |
| Launch date and time | Tuesday at 10:00 AM PT |
| Launch type | Major feature |
| Target audience | All existing users (free and paid tiers) |
| Rollout strategy | Phased via feature flag: 5% day 1 (Monday), 25% day 2 (Tuesday at launch), 100% by Thursday if no issues |
| Go/no-go decision | Monday at 2:00 PM PT -- Decision maker: VP of Product, with PM, Engineering Lead, Support Lead |
| Post-launch review | Thursday at 2:00 PM PT -- Owner: PM |
| Estimated reach on day 1 | ~600 users (5% of 12,000 DAU) |
Engineering Readiness
Code and Testing
Performance
Security
Infrastructure and Deployment
Observability
Rollback
Engineering readiness sign-off: [Engineering Lead] -- [Date]
Marketing and Communications
Messaging
Content Assets
Social and Paid
Enablement
Internal
Marketing readiness sign-off: [Marketing Lead] -- [Date]
Customer Support Readiness