| name | migrate-provider |
| description | Reference for porting a Grafana Cloud product from the legacy grafana-cloud-cli into a gcx provider — adapter, schema/example registration, CRUD redirect commands. HUMAN-DRIVEN — this skill is outside the integrate-with-gcx v1 autonomous workflow and must not be run end to end unattended because its non-registration steps have not been fully audited. Use when a human is deliberately driving a port and says "migrate provider", "port from gcx", "port oncall", "port k6". Not for building providers from scratch — use /add-provider. Recheck present-day placement before porting. |
Migrate a Provider from the Legacy CLI
Port an existing grafana-cloud-cli resource client into this repository's gcx
provider system — core adapter, schema/example registration, CRUD redirect
commands, and ancillary subcommands.
Read this before the recipe. A human drives this skill; it is not covered by
the integrate-with-gcx v1 workflow. In these instructions, "legacy CLI"
means grafana-cloud-cli, whose binary was also named gcx; "gcx" means this
repository's bin/gcx. Use bin/gcx for the build under review, and name the
legacy binary's own path explicitly.
Of the recipe's mechanical steps, only the registration flow
(providers.Register() + TypedRegistrations(), and the TypedCRUD
Descriptor/Aliases fields) has been checked against current code. Treat the
rest as unaudited and verify as you go.
Before starting: read gcx-provider-recipe.md front to back for the
mechanical steps, subject to the caveat above. This skill wraps it with workflow
discipline and orchestration.
Canonical reference: the incidents_*.go files in
internal/providers/irm/ — the first full port
(adapter + schema + commands + ancillary). Start there for patterns.
When to Use
- Porting a legacy
grafana-cloud-cli resource client into current gcx
- A bead task references legacy provider migration
- User says "migrate provider", "port from gcx", "port oncall", "port k6"
When NOT to use: Building a provider from scratch for a product without
a legacy CLI client — use /add-provider instead.
Relationship to integrate-with-gcx
One-directional, so the two skills cannot bounce a port back and forth:
- Recheck placement before porting. A legacy client proves that an API
existed; it does not prove that the provider tier is still the right home.
Check current
/apis CRUD coverage and inventory the non-CRUD operations. A
human confirms provider-tier placement before Phases 0-4 continue.
integrate-with-gcx does not route work here, because of the status note
above: it tells the user a port needs a human to drive and stops. Reach this
skill by invoking it deliberately.
- Call back into two sections only, not the whole skill: the naming pass on
the ported command surface (
self-review.md T7 — released names are frozen,
and a port is where a legacy name most often gets carried in), and the
diff-triggered review before requesting human review (self-review.md).
Contract worksheets and the general readiness workflow do not apply to a
port; the placement recheck above is still required.
- Read from the checkout at
.claude/skills/integrate-with-gcx/references/self-review.md, which carries
T7 and the trigger table.
Prerequisites
Before invoking this skill, ensure:
- Current gcx binary built —
bin/gcx --version must succeed.
- Grafana context configured —
bin/gcx config view must show a working
context with server URL and token.
- Provider directory exists — create
internal/providers/{name} before
starting the port.
- Live API access — smoke tests (Phase 4) require a real Grafana instance.
Verify connectivity:
bin/gcx --context=<ctx> resources list-types.
Pipeline Overview
Phase 0: Requirements Gathering (autonomous)
→ context bundle (legacy source + compliance + pattern ref)
↓ [no gate — feeds Phase 1]
Phase 1: Design Discovery (interactive, 1A–1D)
→ ADR in docs/adrs/{provider}/
↓ [user approval gate]
Phase 2: Spec Planning
→ spec.md + plan.md + tasks.md
↓ [user approval gate]
Phase 3: Build
→ agent team (Core + Commands)
→ code files
↓ [GCX_AGENT_MODE=false mise run all gate]
Phase 4: Verification (4A–4E)
→ GCX_AGENT_MODE=false mise run all + smoke tests + adapter smoke
→ comparison report + recipe update
↓ [user approval gate]
| Phase | Agent Strategy | Receives | Produces | Gate |
|---|
| 0: Requirements | Lead (autonomous) | legacy source + compliance docs | Context bundle | None (feeds Phase 1) |
| 1: Design | Lead (interactive) | Context bundle | ADR | User approves ADR |
| 2: Spec Planning | Lead (or /plan-spec) | ADR + context bundle | spec.md, plan.md, tasks.md | User approves spec package |
| 3: Build | Agent team (Core + Commands) or /build-spec | Spec package | Provider code | GCX_AGENT_MODE=false mise run all passes |
| 4: Verify | Subagent | Comparison report template + spec ACs | Comparison report + recipe update | User approves report |
Phases are strictly sequential. Each phase is separated by a gate that
must pass before the next phase begins. Gates are not optional.
Small-provider shortcut: For providers with 3 or fewer subcommands,
Phase 1 stages 1B–1D may be collapsed into a single proposal. Document
this choice in the ADR.
Phase 0: Requirements Gathering (Autonomous)
Phase 0 is fully autonomous — no user interaction required. The output is a
context bundle, not a design proposal.
0.1: Read the Legacy CLI Source
Read the grafana-cloud-cli source for the target provider. Identify every
subcommand, API endpoint, type definition, and auth mechanism.
0.2: Check Compliance Documents
Read the following project compliance documents and record which rules apply
to the target provider. Use the lint compliance checklist from conventions.md
as the recording template.
CONSTITUTION.md — CLI grammar, output conventions
docs/design/naming.md — resource, file, config, and flag naming conventions
docs/design/command-naming.md — canonical command verbs and placement
docs/design/output.md — output formats
docs/design/exit-codes.md — exit codes
docs/reference/provider-guide.md — provider interface, adapter wiring
docs/reference/provider-discovery-guide.md — API discovery, design decisions
0.3: Identify Pattern Reference
Identify and read the closest existing gcx provider as a pattern reference:
- Cloud APIs with separate URLs →
fleet
- Plugin APIs (standard Grafana SA token) →
slo
- gRPC-style POST APIs →
incidents
- Token exchange auth →
k6
- Multi-resource providers →
oncall
- Plugin proxy APIs →
kg
0.4: Produce Context Bundle
The context bundle contains:
- Source summary — every legacy CLI subcommand mapped to its proposed gcx equivalent or "Deferred" with rationale
- Compliance notes — applicable rules per document with section references (filled checklist from 0.2)
- Pattern reference — which existing provider to follow and why
Phase 0 Gate
None. Phase 0 feeds directly into Phase 1. The context bundle is an
internal artifact — it does not require user approval.
Phase 1: Design Discovery (Interactive)
Phase 1 uses progressive disclosure with four stages. Each stage MUST receive
explicit user approval before the next stage begins.
Stage 1A: CLI UX
Propose a command tree with naming and grammar compliance validated against
CONSTITUTION.md's CLI Grammar section.
Present to user: command tree, verb choices, alias conventions, naming rationale.
Gate: User approves Stage 1A before proceeding.
Stage 1B: Resource Adapters
Specify which resources get TypedCRUD adapters, which remain provider-only
commands, the GVK mapping for each adapter resource, and the verb choice
rationale (list vs show).
Present to user: adapter classification table, GVK mapping, verb rationale.
Gate: User approves Stage 1B before proceeding.
Stage 1C: Auth & Config
Specify ConfigKeys, ConfigLoader usage, environment variable names, and any
GCOM/instance lookup requirements.
Present to user: config key table, env var names, auth flow diagram.
Gate: User approves Stage 1C before proceeding.
Stage 1D: Architecture
Specify package layout, client construction pattern, shared helpers, and the
auth subpackage structure (if the provider uses multiple subpackages).
Present to user: package tree, client pattern, helper inventory.
Gate: User approves Stage 1D before proceeding.
Small-provider shortcut: For providers with 3 or fewer subcommands,
collapse stages 1B–1D into a single combined proposal. All content must
still be present — only the number of approval rounds is reduced.
Phase 1 Output: ADR
Write an ADR documenting all design decisions from stages 1A–1D to
docs/adrs/{provider}/. The ADR MUST be approved by the user before
proceeding to Phase 2.
Phase 1 Gate
STOP. Do not begin Phase 2 until:
- All four stages (1A–1D) have received explicit user approval
- The ADR exists in
docs/adrs/{provider}/ and is approved by the user
If the user has NOT approved a stage, block and re-present it for feedback.
Phase 2: Spec Planning
Phase 2 produces three documents in spec format:
- spec.md — functional requirements + acceptance criteria (Given/When/Then)
- plan.md — architecture decisions + HTTP client reference section
- tasks.md — dependency graph + waves + per-task deliverables
plan.md: HTTP Client Reference (MANDATORY)
plan.md MUST include the HTTP client reference section from
commands-reference.md. This section contains:
- Endpoint table (method, path, purpose, notes)
- Auth helper signature
- Client construction pattern with exact field names
This prevents response envelope hallucination — the most impactful bug class
discovered during provider migrations.
tasks.md: Verification Tasks (MANDATORY)
tasks.md MUST include smoke test design as explicit verification tasks. Each
show/list command MUST have a smoke test task entry specifying all four output
formats (json, table, wide, yaml).
Optional: /plan-spec Integration
When /plan-spec is available, Phase 2 SHOULD use it. When /plan-spec is
not available, Phase 2 MUST produce the same document format manually.
/plan-spec is an optional accelerator, not a dependency.
Phase 2 Gate
STOP. Do not begin Phase 3 until:
- All three documents (spec.md, plan.md, tasks.md) exist with YAML
frontmatter, FR-NNN numbering, and Given/When/Then acceptance criteria
- plan.md contains the HTTP client reference section
- tasks.md contains smoke test verification tasks for all output formats
- The user has explicitly approved the spec package
Phase 3: Build
Phase 3 executes tasks.md waves in order, with mise run lint as a checkpoint
between each task.
Builder Agent Rules
Builder spawn prompts (see templates/builder-prompts.md) MUST include:
"Do NOT infer response envelope shapes. Copy deserialization code verbatim
from the grafana-cloud-cli source. If the source does
json.Unmarshal(body, &slice), the new client MUST do the same — never
wrap in a struct unless the source does."
Builder spawn prompts MUST NOT include verification task details — no smoke
commands, no expected comparison outputs, no pass/fail criteria from the
comparison report template.
Agent Team Orchestration
The Build phase uses an agent team with two teammates:
- Build-Core — owns types, client, adapter, resource_adapter files.
Must complete before Build-Commands begins.
- Build-Commands — owns provider registration and CLI command files.
Starts only after Build-Core signals completion.
File Ownership Table
| Recipe Phase | File(s) | Teammate |
|---|
| Step 2: Types | internal/providers/{name}/types.go | Build-Core |
| Step 3: Client | internal/providers/{name}/client.go, client_test.go | Build-Core |
| Step 4: Adapter + Resource Adapter | internal/providers/{name}/adapter.go, resource_adapter.go | Build-Core |
| Step 5: Provider registration | internal/providers/{name}/provider.go | Build-Commands |
| Step 6: Tests | Command tests (*_test.go) | Build-Commands |
| Step 7: Integration / Wiring | cmd/gcx/providers/{name}/commands.go, cmd/gcx/root/command.go (blank import) | Build-Commands |
Teammates MUST NOT modify files outside their ownership boundary.
Integration/Wiring Task
The integration task MUST explicitly include:
- Wire
Commands() and TypedRegistrations()
- Add blank import in
cmd/gcx/root/command.go
- Fix import cycles introduced by subpackage references
- Fix variable name collisions from package aliasing
- Run
mise run lint and fix all new issues
Optional: /build-spec Integration
When /build-spec is available, Phase 3 SHOULD use it. When /build-spec is
not available, Phase 3 MUST use the agent team orchestration described above.
/build-spec is an optional accelerator, not a dependency.
Phase 3 Gate
STOP. Do not begin Phase 4 until:
GCX_AGENT_MODE=false mise run all exits 0 with no lint errors and all tests
passing.
Run this command after both Build teammates complete. If it fails, fix the
root cause before proceeding — do not proceed with a failing build.
Phase 4: Verification (4A–4E)
Phase 4 MUST execute in this exact order. No step may be skipped.
Step 4A: Build Gate
Run GCX_AGENT_MODE=false mise run all and confirm exit 0.
Step 4B: Smoke Tests (MANDATORY)
Smoke tests are MANDATORY for every show/list command. Each command MUST be
tested with ALL FOUR output formats: -o json, -o table, -o wide,
-o yaml.
Smoke tests MUST NOT be silently skipped or quietly downgraded.
If no live instance is available, report every smoke test as UNVERIFIED with that
reason and do NOT assert parity with the legacy CLI — an unverified port is an
honest state, a claimed-but-untested one is not. Report the blocker
to the user.
CTX={context-name}
for fmt in json table wide yaml; do
GCX_AGENT_MODE=false bin/gcx --context=$CTX {resource} list -o $fmt > /dev/null 2>&1 \
&& echo "list $fmt: OK" || echo "list $fmt: FAIL"
done
Step 4C: Adapter Smoke (MANDATORY)
Every TypedCRUD resource MUST be verified via the adapter path:
resources list-types — registration visible
resources get {alias} — envelope + deserialization working
Step 4D: Spec Compliance
Check every acceptance criterion from spec.md. Report SATISFIED or UNSATISFIED
with file:line evidence.
Step 4E: Recipe Update (MANDATORY)
Update gcx-provider-recipe.md with:
- Status tracker entry — a new row for the ported provider
- Gotchas section — problems discovered during smoke tests (or explicit
"No new gotchas" if none)
- Pattern corrections — if any recipe step was unclear or incorrect
Comparison Report
Produce a structured comparison report using templates/comparison-report.md.
Present it to the user for review.
Phase 4 Gate
STOP. Do not declare the migration complete until:
- The comparison report has been produced and presented to the user
- Every discrepancy is either justified with written rationale or fixed
- The recipe update (Step 4E) is complete
- The user has explicitly approved the comparison report
Red Flags — STOP and Check
When you notice any of these during execution, stop and take the corrective
action before continuing.
| Red Flag | Rationalization | STOP. Do this instead |
|---|
| Inferring response envelope shapes instead of copying from the legacy CLI source | "The response shape is obvious from the type definition" | Copy deserialization code verbatim from the legacy CLI. If it does json.Unmarshal(body, &slice), do the same. Never wrap in a struct unless the source does. |
Copying the legacy client verbatim — embedding *grafana.Client, using c.Get()/c.Post() | "The legacy client already works, adapting it would just introduce bugs" | Translate to gcx's typed HTTP client pattern. Read recipe Step 3 and the current provider guide. |
| Skipping the source audit — jumping to implementation | "I can see the important commands, a full audit is redundant" | Phase 0 is required. Every legacy CLI subcommand must appear in the source summary. |
| Guessing endpoint names or paths | "The endpoint pattern is obvious from the resource name" | Read the legacy CLI source for exact paths. Never guess. |
| Skipping smoke tests — marking Phase 4 complete without running commands | "The unit tests pass, so the implementation is correct" | Smoke tests are mandatory. Block and tell the user if no live instance is available. |
| Builder reading verification tasks — checking smoke commands during Phase 3 | "I need to check what smoke tests will run to make sure my code will pass" | Builders receive spec + plan + implementation tasks. Not verification tasks. |
| Build-Commands starting before Build-Core completes | "I can start on the command structure while Core finishes types" | Wait for Build-Core to complete. Commands depend on adapter interfaces. |
| Skipping a phase gate | "The previous phase was straightforward, I can proceed" | Every gate must be passed. No exceptions. |