Dispatch and Scheduling
Purpose: build a dispatch system that puts the right technician on the right job at the right
time — satisfying SLA commitments, skill requirements, and geographic efficiency simultaneously.
Steps
1. Define the priority order
Map each SLA tier to a dispatch priority level before any scheduling work begins:
| Priority | Job type | Response window | Dispatch rule |
|---|
| P0 | Emergency / safety | ≤ 2 hours | Override all planned work; trigger escalation ladder immediately |
| P1 | Premium SLA | ≤ 4 hours | Assign within 30 min of call receipt; skill match is a hard constraint |
| P2 | Standard SLA | ≤ 8 hours | Assign within 2 hours; skill match required; geo-density preferred |
| P3 | Basic / best-effort | Next business day | Batch with geographic density; skill match required |
| P4 | Planned PM | Scheduled window | Route by density; batched and pre-confirmed |
P0 and P1 always pre-empt P4 and lower. If pre-emption affects a P4 commitment, notify the
customer immediately (see the escalation ladder in Step 4).
2. Apply skill-match as a hard constraint
For each job, define the minimum skill requirement (e.g., EPA 608 certification for refrigerant
work, OEM-certified for medical devices, licensed journeyman for plumbing). A technician who does
not meet the skill minimum for a job is not available for that job — the dispatch board must
enforce this as a filter, not an advisory.
Build and maintain a technician-skills matrix:
technician | cert_1 | cert_2 | equipment_types | tier_authorization
-----------+--------+--------+-----------------+-------------------
Tech A | EPA608 | R-410A | HVAC-commercial | P0, P1, P2
Tech B | NATE | | HVAC-residential| P2, P3, P4
3. Optimize for geographic density
After applying priority and skill filters, break ties by geographic density:
- Calculate the jobs-per-zone for each technician's territory (use
route_density() in
scripts/fsm_calc.py).
- Assign the job to the technician whose next stop produces the highest jobs-per-drive-hour
ratio for the remainder of the day.
- Cluster planned PM jobs by zip code or grid cell to minimize inter-job travel.
- Review territory design quarterly: if any technician's average drive time per job exceeds
30–35 min, rebalance territory boundaries.
4. Design the emergency escalation ladder
Step 1: Check in-territory qualified technicians — is one available within the SLA window?
YES → dispatch immediately, confirm ETA with customer.
NO ↓
Step 2: Check adjacent-territory qualified technicians — can one reach within the window?
YES → dispatch with overtime authorization if needed; notify customer of tech name + ETA.
NO ↓
Step 3: Check approved subcontractors — is there a pre-vetted sub within range and skill?
YES → dispatch sub; confirm sub meets insurance + liability requirements.
NO ↓
Step 4: Notify customer of SLA miss; offer best available ETA; escalate to service manager.
Document as an SLA miss event for the weekly review.
5. Set the daily time-block architecture
A field-service day needs explicit allocation across competing demands:
| Block | Time window | Allocation |
|---|
| Planned PM | Morning (06:00–10:00) | Batched by geo density; PM runs first before reactive demand builds |
| Reactive buffer | Rolling (10:00–15:00) | Unscheduled capacity for P2/P3 calls received same day |
| Emergency reserve | Always-on | 1 tech (or equivalent subcontractor capacity) held for P0/P1 |
| Admin/travel close | End-of-day (15:00–17:00) | Final job completions; mobile data entry; truck restock confirmation |
Adjust block sizes by the ratio of PM-to-reactive jobs in your business mix.
6. Validate with the pre-dispatch parts-readiness check
Before dispatching any job requiring non-stock (special-order) parts:
- Confirm parts are on the tech's truck OR at the staging depot.
- If parts are pending, do not dispatch until parts are confirmed in hand.
- Log any job delayed by parts unavailability as a parts-delay event (feeds
parts-and-inventory-analyst root-cause tracking).
Anti-patterns
- Scheduling by order-received (FIFO) without SLA or skill weighting.
- Treating skill match as a preference rather than a hard filter.
- No emergency-reserve buffer — a fully-booked schedule cannot deliver on emergency SLAs.
- Territory design that ignores geographic density (jobs per drive-hour).
- Dispatching a job without a parts-readiness check for non-stock parts.
Output
A dispatch board design document using templates/dispatch-board.md, with the priority-queue
rules, skill-match matrix, territory/density map, daily time-block allocation, and escalation
ladder documented. Include the key metrics to track: SLA attainment by tier, schedule-adherence
rate, and average jobs per drive-hour.