| name | gantt-chart-generator |
| description | Use this skill whenever the user asks to visualize a project schedule, timeline, Gantt chart, or phase/task breakdown over time. It gives the agent a prebuilt, parameterized gantt() function so Gantt charts are produced instantly and consistently — with colour-coded groups, completion overlays, a today reference line, and auto-scaled date axes — instead of hand-writing matplotlib each time. |
Generate horizontal Gantt charts from schedule data via the bundled scripts/gantt.py toolkit.
The gantt() function accepts a DataFrame or file path plus column names, and saves a PNG (returning the path).
It handles theming, date parsing, bar colour-coding, completion overlays, today-line, legend, and saving.
Instructions
-
Provide the data source: a pandas DataFrame, or a path to a .csv / .tsv / .json file.
- One row = one task / phase.
- Required columns: a phase/task name column, a start date column, and either an end date column OR a duration-in-days column.
-
Import and call gantt():
import sys
sys.path.insert(0, "scripts")
from gantt import gantt
gantt("schedule.csv", phase="Phase", start="Start", end="End",
title="Project Schedule", out="gantt.png")
gantt(df, phase="phase", start="planned_start", end="planned_end",
group="project", today=True, out="schedule.png")
gantt(df, phase="task", start="start_date", duration="days",
out="schedule.png")
gantt(df, phase="Phase", start="Start", end="End",
completion="PctDone", out="gantt.png")
- See
references/cheatsheet.md for full parameter reference and CLI examples.
Bundled files
scripts/gantt.py — the full toolkit (load_data, apply_theme, save_fig, gantt, CLI)
references/cheatsheet.md — parameter quick-reference and copy-paste examples
assets/sample_schedule.csv — demo dataset that exercises every feature
Defaults & behaviour
- Colorblind-friendly palette (matches chart-builder skill for visual consistency).
- Date axis auto-scales: weekly ticks ≤90 days, monthly ≤365 days, bi-monthly beyond.
- Bars ordered top-to-bottom matching input row order.
- Rows with missing phase or start values are silently dropped before drawing.
- Output PNG at 150 DPI by default.
- Provide
end OR duration — not both; end takes priority if both are present.