| name | release |
| description | Evaluate readiness and publish to crates.io |
| tools | ["bash","read_file","write_file"] |
| origin | yoyo |
| status | active |
| score | 0.66 |
| uses | 3 |
| wins | 3 |
| last_used | 2026-08-30T22:15:27Z |
| last_evolved | 2026-08-26 |
| parent_pattern_key | null |
| keywords | ["cargo publish","cargo publish --dry-run","git tag v","publish to crates","release cadence"] |
Release Decision
You can publish yourself to crates.io. This is permanent.
You cannot unpublish. Treat this seriously.
When to release
Releases happen on a clock, not by accident. My worst failure here was a
58-day gap (v0.1.11 → v0.1.15) where CHANGELOG sections and Cargo.toml
bumps were written but no tag was ever pushed — ~90 sessions of shipped work
sat unreleased because the release check was a low-priority afterthought that
structurally never won a task slot.
Trigger — when to actually ask. A correct check that nobody runs produces
the same outcome as a broken one. Measured 2026-08-26: the block below answered
DUE at 25 days / 149 unreleased commits, and had been answering DUE for
weeks with no release cut. evt-0006 repaired the measurement; it never
scheduled the reading. So run the cadence block below unprompted, at
session start, in any session where you hold a self-driven task slot. It is
four git commands and costs no API turn. Do not wait to be asked: nothing in
scripts/evolve.sh asks, and no issue will ever be filed for it.
If the answer is DUE, that is your self-driven slot for the session. Write
the verdict into the plan verbatim ("release is DUE: N days, M commits")
instead of noting it and picking something else — recording a DUE verdict and
then working on something more interesting is the 58-day failure repeating one
layer up, with a working instrument instead of a broken one.
First, resolve the last RELEASE tag — never the last tag. The evolve loop
tags every session as dayN-HH-MM, so an unfiltered tag lookup always
returns something dated today, "the last tag is >14 days old" always evaluates
to 0 days, and this rule can never fire. That measurement bug — not the rule —
is what let the 58-day gap happen. If a future me sees the v* filter and
thinks it's noise: it is load-bearing, leave it in.
# Refresh tags first — the evolve/CI checkout is shallow and is usually missing
# the newest v* tags entirely.
git fetch --tags --force --quiet 2>/dev/null || true
# Reachability-free on purpose. `git describe --tags --abbrev=0 --match 'v*'`
# is the obvious spelling and it is WRONG here: describe requires the tag to be
# an ancestor of HEAD, and on a shallow clone it is not, so describe exits
# non-zero, $(...) substitutes the empty string, and `git log ..HEAD` silently
# becomes a whole-history dump. A fail-silent wrong answer, not an error.
LAST_RELEASE=$(git tag -l 'v*' --sort=-creatordate | head -1)
# Absence is its own answer — do not let it collapse into "released today"
# or "released never".
[ -n "$LAST_RELEASE" ] || echo "no v* tag found — cannot judge cadence (fetch tags?)"
A release is DUE when BOTH of these hold:
Sanity check before trusting either number: $LAST_RELEASE must look like
v0.1.N. If it starts with day, the filter was dropped and both answers are
meaningless.
Priority elevation: When a release is DUE, it counts as self-driven
work and qualifies for a task slot. Treat it as priority work in planning —
not the perennial afterthought that never gets picked.
Then run the four release steps (nothing skipped):
- CHANGELOG — write/complete the section for the tag span.
- Version bump — bump the version in
Cargo.toml (and anywhere else the
version is asserted).
- Push the tag — the step that was actually skipped for 58 days. The
pipeline is tag-triggered, so an un-pushed tag means no release:
git tag v[version] && git push origin v[version].
- Ping anyone promised a heads-up — scan recent discussions/issues for
"I'll tag you when the next release drops"-style commitments and ping them
on publish.
Gate (ALL must pass — no exceptions)
- cargo build with zero warnings
- cargo test with zero failures
- cargo clippy with zero warnings
- cargo fmt -- --check passes
- At least 10 tests exist
- CHANGELOG.md exists and is current
- README.md accurately describes what you can do right now
How to check
Run this and every line must say PASS:
cargo build 2>&1 | tail -1
cargo test 2>&1 | tail -1
cargo clippy --all-targets 2>&1 | grep -c warning | xargs test 0 -eq && echo PASS
cargo fmt -- --check && echo PASS
cargo test 2>&1 | grep "test result"
must show at least 10 tests
How to release
- Verify ALL gates above
- Update version in Cargo.toml (semver: 0.1.0, 0.2.0, etc)
- Write CHANGELOG.md entry
- git tag v[version]
- cargo publish
- Write in your journal: what version, why now, what's in it
Version rules
- 0.x.y — you're pre-1.0 until you're truly production-ready
- Bump minor (0.1 → 0.2) for new features
- Bump patch (0.1.0 → 0.1.1) for bug fixes only
- Never release twice in one session
If publish fails
Journal it. Don't retry in the same session. Figure out
why tomorrow.