Draft construction bid proposals: cover letter, scope, exclusions, price summary, schedule narrative, clarifications. Use for proposals, RFPs, ITB responses. Triggers: /bid-proposal, "write proposal", "bid letter".
Langue du texte source : anglais
Menu
Skills dans ce dépôt
SkillsMP a collecté 106 skills depuis Ameribrands/ameribrands-skills. Ouvrez un skill pour examiner sa source et ses détails.
Ameribrands/ameribrands-skillsAffichage de 40 skills collectés sur 106.
Draft construction bid proposals: cover letter, scope, exclusions, price summary, schedule narrative, clarifications. Use for proposals, RFPs, ITB responses. Triggers: /bid-proposal, "write proposal", "bid letter".
Langue du texte source : anglais
Build structured construction cost estimates with labor/material/equipment/sub line items, markups, and Excel-oriented breakdowns. Use for estimates, budgets, bid prep. Triggers: /estimate-builder, "build estimate", "cost breakdown".
Langue du texte source : anglais
Rewrite technical estimates into clear client-facing cost summaries. Use for owner presentations, homeowner estimates, executive summaries. Triggers: /estimate-simplifier, "client estimate summary".
Langue du texte source : anglais
Draft trade-specific Invitation to Bid packages with scope summary, handoff matrix, and submission requirements. Use for ITB, bid invite, trade package. Triggers: /itb-package, "invitation to bid", "trade package", "bid invite".
Langue du texte source : anglais
Job Cost Sheet (JCS) structure and gross-margin / P&L calculator: line items, cost vs price, target margin gate, program unit model, exec approval. Use for JCS, job cost sheet, margin calculator, gross margin, P&L gate, unit cost model. Triggers: /jcs-margin,…
Langue du texte source : anglais
Assemble a 10–15 page style client proposal from leveled awards, scope, and company branding; export Markdown + branded PDF. Use for client proposals, precon proposal package. Triggers: /proposal-assembly, "client proposal", "assemble proposal", "2 minute…
Langue du texte source : anglais
Find implied scope and "not on drawings" gaps using trade tribal knowledge packs. Use for scope review, missing scope, bid risk, pre-bid checklist. Triggers: /scope-gap-finder, "implied scope", "what's missing from the drawings", "scope gaps".
Langue du texte source : anglais
Draft subcontract exhibit language from leveled scope and ITB; not legal advice. Use for sub agreement, subcontract scope exhibit.
Langue du texte source : anglais
Create or update subcontractor exclusion/assumption profiles and compare a bid against that sub's normal boilerplate. Use for sub profiles, bid anomaly flags. Triggers: /sub-boilerplate, "sub profile", "boilerplate exclusions", "compare to historical…
Langue du texte source : anglais
Second-pair-of-eyes review of quantity takeoffs (AI or manual) for missed openings, scale errors, legend misreads, schedule vs plan mismatches, trade scope gaps. Use for takeoff QA, QTO check. Triggers: /takeoff-reviewer, "review takeoff", "check QTO".
Langue du texte source : anglais
Produce a decision-ready VE log of options with savings range, schedule impact, and risk notes. Use for value engineering, cost reduction options, VE workshop. Triggers: /value-engineering, "VE log", "value engineer", "cost reduction options".
Langue du texte source : anglais
Pre-process construction drawing PDF sets into text/image indexes for faster, cheaper Q&A and takeoffs. Use for drawing sets, plans, PDF takeoffs, footing counts, slab areas. Triggers: /drawing-analyzer, "analyze drawings", "process plan set", "takeoff from…
Langue du texte source : anglais
Maintain a structured RFI log (create, status, overdue, impact summary) for project tracking. Use for RFI register, RFI tracker, document control log. Triggers: /rfi-log, "RFI log", "RFI register", "overdue RFIs".
Langue du texte source : anglais
Audit closeout packages for as-builts, O&M, warranties, waivers, attic stock, CO, training — gap list for final payment. Triggers: /closeout-audit, "closeout checklist".
Langue du texte source : anglais
Plain-language construction contract risk review: payment, indemnity, delay, LDs, termination, insurance. Triggers: /contract-risk, "review subcontract", "contract risk".
Langue du texte source : anglais
Draft delay notices, EOT requests, and claim narratives with notice timing and evidence structure. Triggers: /delay-claim, "time extension", "delay notice", "EOT".
Langue du texte source : anglais
Review construction pay applications (G702/G703-style) for math errors, retainage, stored materials, and lien-waiver gaps. Triggers: /pay-app-review, "pay application", "G702".
Langue du texte source : anglais
Review subcontractor prequalification packets (insurance, safety metrics, license, bonding) into go/no-go style memos. Use for prequal, sub qualification, COI review. Triggers: /sub-prequal, "prequalify sub", "review COI", "sub prequal".
Langue du texte source : anglais
Workmanship warranty letters, manufacturer/parts pass-through, callback triage, and expiration handoff per Operations Playbook v0.04–0.05. Use for warranty letter, warranty callback, manufacturer warranty, substantial completion warranty. Triggers: /warranty,…
Langue du texte source : anglais
Review WIP / over-under billing schedules for stale ETCs, profit fade, and cash risk flags. Use for WIP, work in progress, overbilling review. Triggers: /wip-review, "WIP schedule", "over under billing".
Langue du texte source : anglais
Draft professional construction emails (notice, transmittal, coordination, follow-up) with appropriate contractual tone. Triggers: /email-drafter, "draft email", "write notice email".
Langue du texte source : anglais
Turn construction meeting notes into structured minutes with decisions, action items (who/what/when), and open issues. Triggers: /meeting-summarizer, "meeting minutes", "OAC minutes".
Langue du texte source : anglais
Draft owner/client project updates for residential or commercial stakeholders from progress facts. Triggers: /owner-update, "owner update", "client weekly update".
Langue du texte source : anglais
Time-boxed bid-day checklist: docs, coverage, leveling, plugs, proposal gate. Use for bid day, bid deadline runbook.
Langue du texte source : anglais
Level subcontractor bids apples-to-apples: scope gaps, exclusions, alternates, unit prices, and comparison to each sub's historical boilerplate profile. Use for bid day, sub bid analysis. Triggers: /bid-leveling, "level bids", "compare sub bids".
Langue du texte source : anglais
Draft construction bid proposals: cover letter, scope, exclusions, price summary, schedule narrative, clarifications. Use for proposals, RFPs, ITB responses. Triggers: /bid-proposal, "write proposal", "bid letter".
Langue du texte source : anglais
Build structured construction cost estimates with labor/material/equipment/sub line items, markups, and Excel-oriented breakdowns. Use for estimates, budgets, bid prep. Triggers: /estimate-builder, "build estimate", "cost breakdown".
Langue du texte source : anglais
Rewrite technical estimates into clear client-facing cost summaries. Use for owner presentations, homeowner estimates, executive summaries. Triggers: /estimate-simplifier, "client estimate summary".
Langue du texte source : anglais
Draft trade-specific Invitation to Bid packages with scope summary, handoff matrix, and submission requirements. Use for ITB, bid invite, trade package. Triggers: /itb-package, "invitation to bid", "trade package", "bid invite".
Langue du texte source : anglais
Job Cost Sheet (JCS) structure and gross-margin / P&L calculator: line items, cost vs price, target margin gate, program unit model, exec approval. Use for JCS, job cost sheet, margin calculator, gross margin, P&L gate, unit cost model. Triggers: /jcs-margin,…
Langue du texte source : anglais
Master preconstruction intake: routes to scope, bid leveling, proposal, ITB, or document roles and chains deliverables. Use for precon menu, full bid package AI, estimator cockpit. Triggers: /precon-orchestrator, "precon menu", "run preconstruction workflow",…
Langue du texte source : anglais
Assemble a 10–15 page style client proposal from leveled awards, scope, and company branding; export Markdown + branded PDF. Use for client proposals, precon proposal package. Triggers: /proposal-assembly, "client proposal", "assemble proposal", "2 minute…
Langue du texte source : anglais
Find implied scope and "not on drawings" gaps using trade tribal knowledge packs. Use for scope review, missing scope, bid risk, pre-bid checklist. Triggers: /scope-gap-finder, "implied scope", "what's missing from the drawings", "scope gaps".
Langue du texte source : anglais
Draft subcontract exhibit language from leveled scope and ITB; not legal advice. Use for sub agreement, subcontract scope exhibit.
Langue du texte source : anglais
Create or update subcontractor exclusion/assumption profiles and compare a bid against that sub's normal boilerplate. Use for sub profiles, bid anomaly flags. Triggers: /sub-boilerplate, "sub profile", "boilerplate exclusions", "compare to historical…
Langue du texte source : anglais
Second-pair-of-eyes review of quantity takeoffs (AI or manual) for missed openings, scale errors, legend misreads, schedule vs plan mismatches, trade scope gaps. Use for takeoff QA, QTO check. Triggers: /takeoff-reviewer, "review takeoff", "check QTO".
Langue du texte source : anglais
Produce a decision-ready VE log of options with savings range, schedule impact, and risk notes. Use for value engineering, cost reduction options, VE workshop. Triggers: /value-engineering, "VE log", "value engineer", "cost reduction options".
Langue du texte source : anglais
Draft daily pre-task plans (PTP/JHA) for crew huddles with task-specific hazards, controls, PPE, and stop-work triggers. Triggers: /pre-task-plan, "PTP", "pre-task", "JHA".
Langue du texte source : anglais
Draft site-specific safety plans (SSSP) and toolbox-talk outlines for construction projects. Use for SSSP, site safety plan, toolbox talk. Triggers: /safety-plan, "site safety plan", "SSSP".
Langue du texte source : anglais
Route the user to the right Ameribrands Skills skill or department orchestrator. Analyzes current intent, playbook phase, and catalog sequencing. Use when help, what next, which skill, lost, menu, playbook route, how do I start. Triggers: /ab-help, "what…
Langue du texte source : anglais