| name | ict-risk-management-reviewer |
| description | Review ICT risks, protection needs, criticality, controls, residual risks, treatment, and recurring reassessment. |
| version | 1.0.0 |
| since | 2026-08-27 |
| last_modified | 2026-08-27 |
| authors | ["platform-engineering"] |
| stability | stable |
| min_platform_version | {"codex":"unknown","amazon-q":"unknown","antigravity":"unknown","auggie":"unknown","bob":"unknown","claude-code":"unknown","cline":"unknown","codebuddy":"unknown","continue":"unknown","costrict":"unknown","crush":"unknown","github-copilot":"unknown","gitlab-duo":"unknown","factory":"unknown","forgecode":"unknown","opencode":"unknown","openhands":"unknown","cursor":"unknown","roo-code":"unknown","kiro":"unknown","junie":"unknown","gemini-cli":"unknown","iflow":"unknown","kilocode":"unknown","kimi":"unknown","lingma":"unknown","pi":"unknown","qoder":"unknown","qwen":"unknown","windsurf":"unknown","ollama":"unknown"} |
| deprecated_since | null |
| replaces | null |
| supersedes | [] |
| changelog | [{"version":"1.0.0","date":"2026-08-27","change":"Initial generated production-ready SDLC / DevSecOps skill"}] |
Ict Risk Management Reviewer
Purpose
Review ICT risks, protection needs, criticality, controls, residual risks, risk treatment, and recurring reassessment. Treat regulatory, security, and operational references as review and evidence guidance, not legal advice.
Goal and behavioral contract
The authoritative Goal and artifact references are defined in descriptor.yaml. Capability boundaries, identity and delegation requirements, tool permissions, data boundaries, invariants, approval requirements, output contract, and operational limits are defined in contract.yaml. MCP/A2A trust boundaries and the reviewed execution closure live in integrations/ and dependencies.yaml; ASPS and assurance requirements live in assurance.yaml.
Treat those declarations as mandatory execution constraints. skcr validates requirements but does not claim verification or enforce them at runtime.
When to use
- ICT risk management decisions, controls, or operating practices need independent review.
- A change affects ICT risk management artifacts such as asset inventory, protection needs analysis, criticality rating, control catalogue, risk register, reassessment schedule.
- The user needs evidence-oriented findings for risks such as unrated critical asset, weak residual risk rationale, stale risk treatment, missing control owner, unsupported protection level, outdated reassessment.
- Audit, security, operations, or platform stakeholders need a concise readiness position.
- Existing documentation, tickets, tests, or logs must be turned into actionable remediation items.
Operating model
- Identify the relevant ICT risk management artifacts, owners, systems, environments, and review boundary.
- Compare the available artifacts against expected signals such as asset classification, control test, risk decision, treatment task, owner approval, review cadence.
- Separate confirmed gaps from assumptions, missing evidence, and advisory improvement opportunities.
- Rate findings by operational, security, compliance, customer, and auditability impact.
- Recommend minimal remediation steps, validation evidence, owners, and review cadence.
Spec-Driven Change Context
- Treat repository specs, ADRs, runbooks, change proposals, design notes, and task files as durable context that outlives a chat session.
- For non-trivial changes, prefer a checked-in change artifact or equivalent proposal/design/tasks record before implementation begins.
- Capture requirement deltas explicitly: added, modified, removed, deprecated, or unchanged behavior.