Generates a ranked risk register that stress-tests a planned decision by imagining it has already failed, surfacing the likely causes and pairing each with a mitigation, tripwire, and kill criterion. Use when about to commit to a launch, hire, investment, migration, or any risky, hard-to-reverse decision, or when you need risks surfaced before committing.
Installer avec Codex ou Claude Copiez ce prompt, collez-le dans Codex, Claude ou un autre assistant, puis laissez-le vérifier la page du skill et l'installer pour vous.
Une commande directe contourne le prompt de vérification. Examinez la source avant de l'exécuter.
Generates a ranked risk register that stress-tests a planned decision by imagining it has already failed, surfacing the likely causes and pairing each with a mitigation, tripwire, and kill criterion. Use when about to commit to a launch, hire, investment, migration, or any risky, hard-to-reverse decision, or when you need risks surfaced before committing.
A premortem stress-tests a plan by assuming it has already failed and reasoning backward to explain why, then converting each cause into a mitigation, a tripwire, and a kill criterion. The shift from "what might go wrong?" to "it went wrong, why?" is what does the work: it licenses dissent, surfaces more and more specific causes than ordinary risk review, and turns vague worry into pre-committed action while you can still change course. The output is a risk register, not a discussion.
When to Use
Before a launch, hire, investment, migration, vendor selection, or any consequential, hard-to-reverse commitment.
When a plan has optimistic momentum and you suspect concerns are going unspoken.
When you want risks expressed as observable signals and pre-decided responses, not a feeling of caution.
Often after options have been compared and one has been chosen, as the last gate before committing.
When NOT to Use
After the outcome is known. That is a postmortem, a different tool.
For trivial or fully reversible (two-way-door) decisions. The ceremony is not worth it.
To generate options or to choose among them. Use an ideation skill or a decision-option review; premortem is a risk tool.
As a ritual to bless a decision already made. If the mitigations will not be acted on, skip it; a premortem nobody acts on is theater.
Instructions
When asked to run a premortem, follow these steps:
Frame the decision and the horizon. State the plan and intended outcome in one or two sentences, and pick a concrete time horizon (for example, "six months after launch"). If the decision is trivial or already irreversible, say so and stop.
Declare the failure vividly. Assert it in the definite past: "It is [horizon]. This plan has failed badly." Make the failure concrete and specific, not "it underperformed." Write it into the template's "The failure, declared" section as a past-tense scene of observed fact - it is part of the artifact, and every cause in the register must explain it in the past tense.
Generate causes broadly, before judging. List the plausible reasons the failure happened. Aim for breadth and specificity; include uncomfortable, political, and second-order causes, not just technical ones. Do not filter yet.
Cluster and rank. Group related causes and rank them by likelihood and impact (High/Medium/Low each). Keep the vital few; do not pad.
Convert each top cause into action. For each high-priority cause, define a leading signal / tripwire (the early sign it is happening), a mitigation (what reduces the risk now), an owner, and a kill criterion (the pre-decided condition under which you stop or change course). This conversion step is mandatory; a list of risks without it is not a premortem.
Emit the risk register and a short summary. Produce the artifact in references/TEMPLATE.md: the declared failure in the definite past, then a one-paragraph "top risks and what we will do" summary above a ranked register table.
Output Format
Use the template in references/TEMPLATE.md. The deliverable is the filled risk register plus its summary, not a prose essay.
Quality Checklist
Before finalizing, verify:
The failure was declared in the definite past, with a concrete horizon.
Causes go beyond the obvious technical ones (include people, process, second-order, and external causes).
Every high-priority cause has a tripwire, a mitigation, an owner, and a kill criterion (the conversion step is done).
Risks are ranked, not an undifferentiated list.
The output is the risk register artifact, not prose.
No overclaiming: the skill does not promise a better outcome, only better-surfaced and better-handled risk (see evidence/dossier.md).
Evidence
Tier S/M (contested). Prospective hindsight reliably increases the number and specificity of causes surfaced and reduces overconfidence in a plan (Mitchell, Russo & Pennington 1989; Veinott, Klein & Wiggins 2010). It does not have strong evidence of improving final outcomes, and the often-quoted "30%" figure measures the number of reasons generated, not decision quality. The evidence is transferred from human studies and has not been validated for AI-augmented use. Full grading, sources, and caveats: evidence/dossier.md.
Examples
See references/EXAMPLE.md for a completed premortem on a real decision.