Review
Final gate between /tdd completion and PR creation. Phase 1 ensures the suite is
healthy. Phase 2 reviews code against the plan and standards. If Phase 2 fixes break
tests, loop back to Phase 1.
Handles output from one or more /tdd runs on the same branch.
Prerequisites
/tdd has completed on this branch
.plans/issue-{issue-number}/plan.md exists (every issue gets a plan)
Process
Phase 1: Suite Health
1.0 Environment Setup
Verify infrastructure before running tests:
make test-backend ARGS="--version"
ls frontend/node_modules/.bin/vitest
If venv or node_modules don't exist, run make setup first.
1.1 Run Full Suite
This is the single authoritative cross-layer test run. TDD sub-agents only verify
their own layer — this is where cross-layer regressions surface.
make test-backend
make test-frontend
make test-e2e
Collect all failures.
1.2 Categorize Failures
Separate failures into:
| Category | Meaning | Action |
|---|
| New feature tests failing | Bug in the feature | Flag — TDD didn't complete cleanly |
| Existing tests failing | Cascade from new behavior | Present to user for decision |
All failures are caused by this branch — main is always green.
1.3 Present Each Failure
For each existing test failure caused by the new feature, use AskUserQuestion:
Present:
- Test name and file
- What it asserts (the old behavior)
- Why it fails (the new behavior)
- Relevant code diff if helpful
Options:
- Update test — modify assertions to reflect new correct behavior
- Remove test — this scenario no longer applies
- This is a bug — the feature broke something it shouldn't have; needs fixing
- Skip for now — revisit later
Group related failures by topic when possible (e.g., "These 4 tests all assert
the old response format for GET /recipes").
1.4 Execute Decisions
Context management: Spawn a general-purpose sub-agent (via Task tool) when a fix
requires reading multiple files or making coordinated changes across files. Do simple
single-file edits (update one assertion, delete one test) inline.
When spawning a sub-agent, provide:
- The specific test file(s) and line numbers
- What the old behavior was and what the new behavior is
- The exact decision (update/remove)
- Instructions to run the affected test file after the fix
For each decision:
- Update test: Modify the test to assert new behavior. Run the specific test to confirm pass.
- Remove test: Delete the test. If it was the only test for that behavior, ask if replacement coverage is needed.
- Bug: Create a LEARNING task noting the regression. Fix the bug before continuing.
- Skip: Leave as-is, note it for later.
1.5 Database Migrations
Evaluate code changes for database impact:
- Check for new/modified models, schema changes, or new fields
- Check for changed relationships or constraints
- Check for renamed or removed columns/tables
If database changes are detected, present to user via AskUserQuestion:
- What changed (model/field/relationship)
- Whether a migration is needed
- Suggested migration approach
If no database changes detected, skip this step.
1.6 Verify Suite Health
After all decisions are executed:
Phase 2: Code Review
2.1 Gather Context
- Read the plan:
.plans/issue-{issue-number}/plan.md
- Get the full diff:
git diff main...HEAD
- List all changed files:
git diff main...HEAD --name-only
2.2 Spawn Review Agents
Spawn 4 independent review sub-agents (Task tool, subagent_type="general-purpose"):
Plan conformance reviewer:
Compare this implementation against its plan.
Plan:
[plan.md content]
Changed files:
[file list]
For each feature in the plan, evaluate:
- Is it fully implemented? (all acceptance criteria met)
- Is anything missing?
- Was anything added that isn't in the plan?
- Does the approach match what was specified?
Report:
- IMPLEMENTED: criteria met as planned
- DEVIATED: implemented differently than planned (explain how)
- MISSING: planned but not implemented
- EXTRA: implemented but not in plan
Standards conformance reviewer:
Review these code changes against project standards.
Changed files:
[file list]
Read the project's CLAUDE.md and relevant subdirectory CLAUDE.md files.
Check each changed file against the standards defined there.
Evaluate:
- Naming conventions followed?
- File organization correct?
- Patterns match established codebase conventions?
- Error handling consistent with project style?
- Test structure follows testing standards?
Report each violation with:
- File and line
- What standard is violated
- What it should be instead
Quality reviewer:
Review these code changes for quality issues.
Changed files:
[file list]
Read the changed files and evaluate:
- Dead code or unused imports introduced?
- Overly complex logic that could be simplified?
- Missing error handling at system boundaries?
- Hardcoded values that should be configurable?
- Security concerns (injection, XSS, exposed secrets)?
- Performance concerns (N+1 queries, unnecessary re-renders)?
Report only concrete issues, not style preferences.
Docs-update reviewer:
Review these code changes for documentation impact.
Changed files:
[file list]
Read ALL durable context files:
- CLAUDE.md (root)
- backend/CLAUDE.md
- frontend/CLAUDE.md
- e2e/CLAUDE.md
- All files in docs/
For each changed file, evaluate:
- Does it introduce a new pattern, convention, or architectural decision
that should be recorded in a CLAUDE.md or docs/ file?
- Does it change existing behavior that is currently documented?
- Does it add a new dependency, command, or configuration that should
be mentioned in setup/quick-start docs?
Report:
- STALE: existing documentation that no longer matches the code
- MISSING: new patterns or conventions that should be documented
- OK: no documentation impact
Only flag concrete gaps. Do not suggest adding docs for trivial changes.
2.3 Present Findings
Summarize all reviewer findings grouped by severity:
Must fix (blocks PR):
- Missing acceptance criteria
- Standards violations
- Security issues
Should fix (improves quality):
- Deviations from plan approach
- Quality concerns
- Minor standards issues
Note (informational):
- Extra features added beyond plan
- Suggestions for future improvement
For each finding, use AskUserQuestion:
- Present the issue
- Options: fix now / accept as-is / create follow-up issue
2.4 Execute Fixes
Context management: Spawn a general-purpose sub-agent (via Task tool) when a fix
touches multiple files or requires reading surrounding code. Do simple single-file
cosmetic edits inline.
For "fix now" decisions:
- Make the change
- If the fix could break tests → loop back to Phase 1 (re-run suite from 1.1)
- If the fix is cosmetic only → run lint/typecheck for the affected layer
Phase 2.5: Friction Resolution
Check for .plans/issue-{issue-number}/friction.md. If it exists, /tdd recorded
friction during execution that needs resolution here.
For each friction entry:
- Read the entry and understand the gap
- Determine the appropriate resolution:
- Durable context update — update CLAUDE.md, docs/, or scripts to prevent recurrence
(e.g., a repeated bash failure → add a make target or document the correct command)
- Breaking test resolution — existing tests broke due to intentional behavior changes
during GREEN phase. Present to user with same options as Phase 1.3 (update/remove/bug/skip)
- Incomplete task — a task left
in_progress after 3 failures. Diagnose the root cause,
fix the underlying issue, and complete the task
- Follow-up issue — the friction reveals a larger problem that shouldn't block this PR
- Present each friction item to the user via
AskUserQuestion with resolution options
- Execute the resolution
- If any resolution changes code or tests → loop back to Phase 1 (re-run suite)
After all friction is resolved, delete the friction file.
Phase 3: Final Gate
- Confirm no unaddressed must-fix items remain
- Confirm suite is green (from Phase 1, or re-verified after Phase 2 fixes)
- Run lint/typecheck if any Phase 2 cosmetic fixes were made:
make lint
make typecheck
- Post summary comment on the GitHub issue
Summary
Present final state:
- Suite health: Tests updated [count], removed [count], migrations [count], bugs [count], skipped [count]
- Friction resolved: [count] — durable context updates [count], breaking tests fixed [count], incomplete tasks completed [count]
- Plan conformance: [percentage of criteria fully implemented]
- Standards issues fixed: [count]
- Quality issues fixed: [count]
- Accepted deviations: [list]
- Follow-up issues created: [list]
- Suite status: GREEN / remaining failures
Tell the user: "Review complete. Ready for PR."
Principles
- Suite green is non-negotiable — the branch must pass all tests before PR
- Plan is the source of truth — deviations need justification
- Standards are non-negotiable — must-fix, not suggestions
- Quality is contextual — only flag concrete issues, not preferences
- User decides — never update or remove a test without explicit approval
- Group related failures — don't ask about 10 tests one at a time if they're the same issue
- Bugs get fixed, not deferred — if the feature broke something unintentionally, fix it here
- Phase 2 fixes that break tests loop back — no skipping the suite re-run
Converted and distributed by TomeVault — claim your Tome and manage your conversions.