Mermaid Diagrams
Render flowcharts, sequence diagrams, ERDs, Gantt charts, and more directly in chat using Mermaid.js syntax in a fenced mermaid block.
CRITICAL OUTPUT RULES
- Output a single fenced
```mermaid block
- No file saving. Inline output only — no file tools
- No declare_plan. Read skill → output mermaid block. Done
- Mermaid.js is auto-injected — no imports needed
- Theme auto-switches with dark/light mode — never configure theme manually
When to Use Mermaid vs Other Formats
| Need | Use |
|---|
| Nodes and edges defined by names/relationships | This skill (Mermaid) |
| Precise spatial layout / custom box positions | svg-diagrams skill |
| Data visualization (bar, line, pie) | chart-visualizer skill |
| Interactive widget with state/controls | html-interactive skill |
Mermaid wins when the diagram is relationship-driven: A connects to B, B connects to C. If you find yourself thinking about x/y coordinates, use SVG instead.
Diagram Types & Syntax
Flowchart (most common)
flowchart TD
A[User Request] --> B{Auth Check}
B -- Valid --> C[Load Context]
B -- Invalid --> D[Return 401]
C --> E[Run Agent]
E --> F{Tool Needed?}
F -- Yes --> G[Execute Tool]
F -- No --> H[Generate Response]
G --> H
H --> I[Return to User]
Direction options:
TD — top-down (default, most readable)
LR — left-right (good for pipelines)
BT — bottom-top
RL — right-left
Node shapes:
[Label] — rectangle (process step)
{Label} — diamond (decision)
(Label) — rounded rectangle (start/end)
([Label]) — stadium/pill
[[Label]] — subroutine
[(Label)] — cylinder (database)
>Label] — flag/ribbon
Edge types:
--> — solid arrow
--- — solid line, no arrow
-.-> — dashed arrow
==> — thick arrow
-- label --> — labeled arrow
-- label --- — labeled line
Subgraphs (grouping):
flowchart LR
subgraph Frontend
A[Browser] --> B[React App]
end
subgraph Backend
C[API Server] --> D[(Database)]
end
B --> C
Sequence Diagram
Use for API calls, auth flows, inter-service communication, user interaction flows.
sequenceDiagram
participant User
participant App
participant Auth
participant DB
User->>App: POST /login
App->>Auth: validate(token)
Auth-->>App: {valid: true, userId: 123}
App->>DB: getUserById(123)
DB-->>App: user record
App-->>User: 200 OK + session cookie
Message types:
->> — solid arrow (synchronous call)
-->> — dashed arrow (async response)
-x — solid, crossed (failure)
--x — dashed, crossed
-) — async message (open arrowhead)
Extras:
sequenceDiagram
Note over Auth: Validates JWT signature
loop Retry logic
App->>External: fetch()
External-->>App: timeout
end
alt Success
App-->>User: 200
else Failure
App-->>User: 500
end
ER Diagram
Use for database schemas, data models, entity relationships.
erDiagram
USERS ||--o{ ORDERS : places
ORDERS ||--|{ ORDER_ITEMS : contains
PRODUCTS ||--o{ ORDER_ITEMS : "included in"
USERS {
uuid id PK
string email
string name
timestamp created_at
}
ORDERS {
uuid id PK
uuid user_id FK
decimal total
string status
timestamp placed_at
}
PRODUCTS {
uuid id PK
string name
decimal price
int stock
}
Relationship notation:
||--|| — one to one
||--o{ — one to zero-or-many
||--|{ — one to one-or-many
}o--o{ — zero-or-many to zero-or-many
Gantt Chart
Use for project timelines, sprint planning, build schedules.
gantt
title Prometheus CIS — Phase 5
dateFormat YYYY-MM-DD
section Policy Engine
policy.ts core logic :done, 2024-03-01, 3d
audit-log.ts :done, 2024-03-03, 2d
section Wiring
registry.ts wrapper :active, 2024-03-10, 2d
approval UI update :2024-03-12, 1d
section UI
Audit log viewer :2024-03-13, 3d
State Diagram
Use for state machines, lifecycle flows, status transitions.
stateDiagram-v2
[*] --> Pending
Pending --> Running : dispatch()
Running --> Paused : pause()
Paused --> Running : resume()
Running --> Complete : finish()
Running --> Failed : error()
Failed --> Pending : retry()
Complete --> [*]
Class Diagram
Use for OOP structures, TypeScript interfaces, system object models.
classDiagram
class Agent {
+string id
+string model
+string[] tools
+run(task) Promise
+spawn(config) Agent
}
class ManagedTeam {
+string teamId
+Agent[] members
+dispatch(goal) void
+getStatus() TeamStatus
}
class ToolRegistry {
+register(tool) void
+execute(name, args) ToolResult
+list() Tool[]
}
Agent --> ToolRegistry : uses
ManagedTeam --> Agent : manages
Timeline
Use for historical sequences, roadmap milestones, chronological events.
timeline
title Prometheus CIS Build Phases
Phase 1 : Business Brain
: BUSINESS.md + entities/
Phase 2 : Website Intelligence
: deploy_analysis_team.ts
Phase 3 : Social Media Coach
: social-scraper.ts
Phase 4 : CIS Integrations
: Gmail, Slack, GitHub + more
Phase 5 : Policy + Audit
: policy.ts + audit-log.ts
Rules & Anti-Patterns
DO:
- Use
TD (top-down) as default — only switch to LR when the flow reads better horizontally (pipelines, CI/CD)
- Keep node labels short — 3–5 words max. Longer text → truncate or use a subtitle in a subgraph
- Use subgraphs to group related nodes instead of adding visual noise with long names
- Use sequence diagrams for any inter-service or API call flow — flowcharts get confusing with back-and-forth
DON'T:
- Don't use Mermaid for diagrams needing exact component positioning — use
svg-diagrams
- Don't use
pie type in Mermaid — use chart-visualizer for all data charts
- Don't write more than ~20 nodes in a single flowchart — split into sub-diagrams
- Don't add manual theme configuration — the renderer auto-applies dark/light theme
- Don't use special characters (
<, >, ") in node labels without quoting — wrap in "quotes" if needed
Quick Decision Guide
| User says | Diagram type |
|---|
| "flowchart / workflow / process steps" | flowchart TD |
| "how does the login / auth flow work" | sequenceDiagram |
| "database schema / data model / ERD" | erDiagram |
| "project timeline / sprint plan / milestones" | gantt |
| "state transitions / lifecycle / status flow" | stateDiagram-v2 |
| "class structure / interfaces / type hierarchy" | classDiagram |
| "chronological events / history / roadmap" | timeline |
Proactive Triggering
Automatically produce a Mermaid diagram (without being asked) when:
- User describes a multi-step approval or onboarding process
- User asks how a feature or API flow works end-to-end
- A team produces a workflow that would benefit from visual documentation
- User describes relationships between database tables or objects
- User plans a project with phases, milestones, or dependencies