- name
- architecture-plan
- description
- Turn approved architecture-design artifacts, with supporting review findings when present, into an incremental implementation/refactoring plan. Use when asked to plan a refactor, sequence remediation, or implement an approved target architecture. Produces a task-runner-compatible, verifiable plan that cites source findings, evidence, design decisions, contracts, or risks. NOT for applying changes (hand off to a mutator agent), designing target architecture (use architecture-design), or scoring (use architecture-scorecard).
# Architecture plan
Derive an actionable, incremental implementation/refactoring plan from an
approved design, with review findings as supporting context when present. The
artifact is executable by an engineer, mutator agent, or task runner; the
architect writes the plan and stops.
## When to use
Use after an architecture design, when the user wants approved target
architecture implemented. For existing-code remediation, the default chain is
`architecture-review` → `architecture-design` → `architecture-plan`. Plan one
hotspot, boundary, module, or flow per plan unless a roadmap is explicitly
requested.
If there is no approved design artifact, recommend `architecture-design` first.
If there is no review report for existing-code remediation, recommend
`architecture-review` before design unless the user explicitly wants greenfield
target-state design.
## Skill navigation
- Missing findings for an existing system: recommend `architecture-review` first
unless the user already supplied enough current evidence.
- Missing approved target architecture: recommend `architecture-design` before
planning.
- Current skill: use `architecture-plan` to sequence small, verifiable changes
from an approved design, citing review findings as supporting rationale when
present.
- Next skill after implementation: run `architecture-review` to verify the code
now matches intended architecture and the plan's acceptance criteria.
## Task list discipline
Maintain a visible task list for the planning flow. Track at least:
1. Approved design artifact confirmed; supporting review report confirmed when
present.
2. Scope and first execution horizon selected.
3. Safety net ordered before behavior-bearing changes.
4. Executable task sections drafted.
5. Verification and acceptance criteria attached.
6. Handoff and re-review step recorded.
Keep task names outcome-based. Do not expose prompt or tool internals in task
names.
## Destination
When the user explicitly asks for a plan file and gives no destination, ask to
confirm the default path under `docs/plans/` using a kebab-case slug from the
target, for example `docs/plans/extract-auth-boundary.md`. Create `docs/plans/`
only after the destination is confirmed. If the user only asks to generate or
create a plan, return it in the conversation unless they confirm a file path.
Use a user-specified path only when provided. If the user-specified path is
outside `docs/plans/`, state that the executor must be invoked with that exact
path or the plan must be copied/symlinked into the configured plans directory.
## Procedure
1. **Anchor to the source artifacts.** Cite the approved design artifact plus
decision, contract, risk, or module IDs each task addresses. Include source
report finding/evidence IDs when the design came from a review. A task with no
source rationale does not belong in the plan.
2. **Use the plan template.** `../../resources/templates/plan.md` is the skeleton: Overview,
Source artifact, Success criteria, Validation Commands, Implementation Steps
with executable `### Task N:` sections, Acceptance criteria, Safety notes,
Re-review. Put checkboxes only inside `### Task N:` or `### Iteration N:`
sections; context sections must use plain bullets or prose.
3. **Resolve the destination.** For file artifacts, use the user's path. If no
path is provided, ask to confirm `docs/plans/<kebab-case-target>.md` before
writing or creating directories. When the path is outside `docs/plans/`,
include the exact execution path or the copy/symlink instruction in the
handoff.
4. **Order for safety.** Prefer characterization tests, seam creation, boundary
repair, and fitness checks before cosmetic cleanup. Establish a safety net
before changing behavior-bearing code.
5. **Keep it incremental.** No big-bang rewrites. Each executable task is small,
independently committable, and independently verifiable. Keep the next
execution horizon to five tasks or fewer before a re-review.
6. **Make every task concrete.** Each `### Task N:` section includes:
- Justification: source finding, evidence ref, design decision, contract,
risk, or module responsibility.
- Files: planned file paths and what changes in each.
- Preconditions and postconditions.
- Impact commands: concrete `gitnexus impact <path-or-symbol>` and
`gitnexus detect-changes` commands when GitNexus is available; otherwise an
explicit fallback such as `git diff --name-only` and the missing-tool note.
- Deterministic architecture checks: if archfit is configured, name the
existing gate status, the rule/config change when needed, and the focused
`archfit check` or `archfit check --base <ref>` command.
For a new gate,
state the violation should fail before the fix and pass after it. Otherwise
name the missing config/tool gap.
- Verification commands: concrete test, lint, type, or fitness commands for
this task, not only whole-plan commands.
- Manual checks: plain bullets only, or `None`.
- Checkbox work items for executable implementation steps only.
7. **Separate manual checks.** Do not turn human review or judgment into
checkboxes. Put those under `Manual checks:` using plain bullets so task
runners do not treat them as extra loop iterations.
8. **End with final verification and docs.** The last executable task is a final
verification/documentation task. It runs whole-plan validation, updates or
explicitly rules out docs changes, records GitNexus `detect-changes`, and
records the scoped `architecture-review` follow-up.
9. **Write safety notes.** Flag irreversible steps, data migrations, and
wide-blast-radius changes. State plainly that an engineer, mutator agent, or
task runner executes the approved plan after approval.
## Failure handling
- Missing approved design, unreadable artifact, or absent finding/evidence/
decision/contract refs: stop and ask for the missing source or run
`architecture-design`. Do not invent refs.
- Missing `../../resources/templates/plan.md`: report the missing template and ask before
using an inline fallback.
- Requested rewrite with no cited finding, design decision, or risk behind it:
decline that task and name the missing rationale.
- No concrete file list or verification command can be named for a task: split,
narrow, or discard the task before writing the plan.
## Output
Return or write a Markdown plan shaped like `../../resources/templates/plan.md`. When
writing a file with no path provided, use the confirmed default path
`docs/plans/<kebab-case-target>.md`. Include:
- `## Source artifact`: approved design path or ID plus decision, contract,
risk, or module IDs used; include supporting report finding/evidence IDs when
present.
- `## Success criteria`: measurable outcomes tied to findings, score dimensions,
design decisions, contracts, or module responsibilities. Use plain bullets, no
checkboxes.
- `## Validation Commands`: concrete project-wide commands to run for the whole
plan, including `archfit check` commands (`--base` for deltas) when
configured.
- `## Implementation Steps`: at most five executable `### Task N:` or
`### Iteration N:` sections. Each task has justification, files,
preconditions, postconditions, fitness gate, impact commands, verification
commands, manual checks, and checkbox work items.
- A final `### Task N: Final verification and documentation` section.
- `## Acceptance criteria`: checks that prove the plan is complete. Use plain
bullets, no checkboxes.
- `## Safety notes`: blast radius, irreversible steps, rollback notes, and the
engineer/mutator/task-runner handoff.
## Hard rules
- Every executable task cites a source finding, evidence ref, design decision,
contract, risk, or module responsibility.
- Task headers must be `### Task N:` or `### Iteration N:`; `N` may be an
integer or a small variant such as `2.5` or `2a`.
- Checkboxes must appear only under executable task/iteration headings.
- Generated plan files use the user-provided path, or a confirmed default path
under `docs/plans/<kebab-case-target>.md`.
- If a generated plan is outside `docs/plans/`, the handoff must say how to run
it by exact path or copy/symlink it into the configured plans directory.
- Every task has a file list, fitness-gate status, and concrete per-task
verification command.
- When archfit is configured, every boundary/coupling task names the archfit
check or config/rule update that will make the improvement repeatable,
including before-fail/after-pass expectation for new gates.
- Manual checks use plain bullets only.
- Every plan includes concrete GitNexus impact/detect-changes commands or an
explicit missing-tool fallback.
- Incremental only — no rewrites the source artifact does not justify.
- The final executable task is verification/documentation/handoff.
- The plan must end with a re-review recommendation.
- The architect produces the plan and stops. Execution is someone else's job.