| description | Produces a consultant-grade live-working (energized-work) risk assessment and statutory justification for a named task on or near energized conductors, driven by the de-energize-first default and the EAWR reg-14 / OSHA 1910.333(a)(2) three-part live-working test. Use this skill when a user asks to assess live or energized electrical work, justify working live, build an energized electrical work permit, or set the approach boundaries near live conductors. It applies the de-energize-first default (an ESWC, NFPA 70E Article 120 first), forces the statutory test (unreasonable to be dead + reasonable to work live + suitable precautions), states the approach distances (NFPA 70E 130.4), keeps arc-rated PPE last, and cross-references the arc-flash incident energy from arc-flash-assessment without recomputing it. It refuses a convenience justification and emits a branded NFPA 70E Annex J energized-work permit. Grounded in NFPA 70E, OSHA 1910.333, EAWR 1989 reg 14. Decision-support only; a competent person must review. |
| license | Apache-2.0 |
| metadata | {"author":"eyekyam","version":"1.0","category":"risk-assessment","tier":2,"audience":["M","C"],"industry":["All"],"jurisdiction":["All"],"status":"stable","plugin":"hse-utilities-power","bundled_in":["hse-renewables"],"hse_reviewed_by":"","hse_reviewed_date":""} |
Live-Working Risk Assessment
A consultant-grade, de-energize-first live-working (energized-work) risk assessment for a
named task on or near energized conductors — a specific live LV/HV apparatus, a defined work
activity, and an operating voltage — never a generic "work near the live parts". Its entire reason
to exist is that safe electrical work leads with de-energization and a statutory justification,
not with PPE: the default is to establish an electrically safe work condition (NFPA 70E
Article 120 / EAWR dead-working) and only if dead working is genuinely not reasonable is
live work permitted — and then only when the three-part statutory test holds (it is
unreasonable to work dead + reasonable to work live + suitable precautions are taken). A
live-working plan justified by convenience, cost, or schedule ("production cannot stop / it's
quicker"), or one whose only control is "arc-rated PPE" with no de-energization evaluation, is
flagged and pushed up the hierarchy — never accepted as the assessment. That is the failure mode
this skill exists to prevent.
It forces the single lever that separates a defensible artifact from copy-paste paperwork: the
recorded de-energization decision + the statutory live-working justification + the defined
approach boundaries, inside the full hierarchy of controls. It refuses to assess "work near
the live parts" without the named task + the live conductors/apparatus + the operating voltage,
records the justification verbatim as the spine of the artifact, defines the limited and
restricted approach boundaries (shock — NFPA 70E 130.4), and cross-references the arc-flash
incident energy + PPE category computed by arc-flash-assessment at the working position (it
never re-derives the cal/cm² figure — that computation is owned by the arc-flash engine).
Grounded in NFPA 70E (2024) 110.5/130.2 (energized-work justification + permit), 130.4
(shock risk assessment + approach boundaries), 130.2(B) / Annex J (the energized electrical work
permit), and Article 120 (the de-energize-first ESWC default), read with OSHA 29 CFR
1910.333(a)(2) (the de-energize-first rule + the additional-hazard/infeasibility justification) +
1910.269 (T&D minimum approach distances), and EAWR 1989 reg 14 (the three-part live-working
test) + HSG85 + HSR25. Decision-support only; a competent person must review the output and a
competent authority must sanction any live work.
When to use this skill
Use this skill when the user needs a live-working risk assessment for a concrete energized task —
for example "assess and justify live thermographic survey on the energized LV switchboard SB-2",
"build the energized electrical work permit for protection-relay testing on the 11 kV panel",
"set the limited and restricted approach boundaries for work near the live busbar at MCC-4", or
"evaluate whether the proposed live work on feeder F1 can be done dead instead". It is not for a
generic "how do I work on live equipment safely?" answer: the Workflow intake below forces the named
task, the live conductors, and the voltage before any drafting, refuses a vague "near the live
parts" request, refuses a live-working justification of convenience, and never reduces the
assessment to "wear the flash suit" — the de-energization decision + the statutory justification
come first, arc-rated PPE is the residual last line.
Data Protection & De-identification (MANDATORY — apply before drafting)
Apply this BEFORE you draft anything. Treat injury, illness, and any health
detail as the highest sensitivity. Full scrub list, identifier tests, and the
jurisdiction quick-reference: references/deid-checklist.md.
- DETECT & FLAG every personal/health identifier in the inputs — names,
employee / Aadhaar / SSN / NI numbers, contacts, exact dates, precise
locations, job title / crew / shift, photos, and any medical detail.
List what you found before drafting. If unsure whether something is
identifying, treat it as identifying.
- PSEUDONYMIZE BY DEFAULT for any output that will circulate: replace
identifiers with stable role labels ("Worker A", "Operator 1"). Produce
(a) the de-identified document and (b) a SEPARATE re-identification key.
Never put the key or any name↔label mapping in the document. Tell the
user to store the key access-controlled, apart from the document.
- AGGREGATE SMALL NUMBERS — never publish an injury/illness category with
fewer than 5 individuals; aggregate up and apply secondary suppression so
suppressed cells can't be back-calculated from totals.
- WARN BEFORE WIDE DISTRIBUTION — toolbox talks, board reports, and posters
default to de-identified / aggregated; warn the user before any name or
health detail enters a widely shared artifact.
- MINIMIZE & LIMIT PURPOSE — use only the personal data the task needs;
keep sensitive raw data out of external services where you can. When in
doubt, ask before including it.
Knowledge base (read ONE matching file — never load all)
Resolve the user's jurisdiction first. Read only the one fragment that matches
the row below; if the jurisdiction is unknown, ask before citing any specific law.
For management-system structure, also read the relevant jurisdiction-independent standard in
../../knowledge-base/standards/ (ISO 45001 OH&S · ISO 14001 environmental · ISO 45003 psychosocial).
Always apply ../../knowledge-base/prompt-snippets/hierarchy-of-controls.md (KB-SNIP-HOC)
to every control recommendation. For any benchmark/figure, look up the ID in the relevant
_registry.yaml, then read ONLY the named file — and quote its source+year.
| Jurisdiction / scope | Read |
|---|
| Live-work justification (every live-work path) | ../../knowledge-base/prompt-snippets/live-work-justification.md (KB-SNIP-LIVE-WORK-JUSTIFICATION) — the three-part live-working gate (it is unreasonable to work dead + reasonable to work live + suitable precautions are taken) per EAWR reg 14 / OSHA 1910.333(a)(2) / NFPA 70E 130.2; convenience / cost / "it's quicker" is NOT a justification — a live-work plan justified by convenience, or with no energized-work permit, is rejected |
| Electrical control spine (every run) | ../../knowledge-base/prompt-snippets/deenergize-first.md (KB-SNIP-DEENERGIZE-FIRST) — the de-energize-first / ESWC spine: establish an electrically safe work condition (NFPA 70E Article 120) BEFORE any reliance on arc-rated PPE or approach controls; a PPE-led or convenience-led treatment is rejected |
| Electrical safe-working duty (every run) | ../../knowledge-base/standards/nfpa-70e.md (KB-STD-NFPA70E) — the copyright-safe NFPA 70E 110.5/130.2 (energized-work justification + permit), 130.4 (shock risk assessment + the limited/restricted approach boundaries), Annex J (the energized electrical work permit) + Article 120 clause→artifact structure map (cite the clause/article numbers only — never the table cells) |
| Utilities clause cross-walk | ../../knowledge-base/prompt-snippets/utilities-clause-map.md (KB-SNIP-UTILITIES-CLAUSE-MAP) — the bundle-shared NFPA 70E Article 120 + 130.4 + 130.5 cross-walk that keeps the three hse-utilities-power skills consistent on de-energize-first |
| USA | ../../knowledge-base/regulatory/osha-1910-269.md (KB-REG-OSHA1910-269) — US duty: OSHA 29 CFR 1910.333(a)(2) (de-energize-first / the additional-hazard-or-infeasible energized-work justification) read with 1910.269 (T&D — minimum approach distances, de-energizing, protective grounding) + 1910.147 (the LOTO standard) |
| UK / EU | ../../knowledge-base/regulatory/uk-eawr.md (KB-REG-UK-EAWR) — EAWR 1989 reg 14 (the three-part live-working test — no work on or near a live conductor unless it is unreasonable to be dead, reasonable to work live, and suitable precautions are taken) read with HSG85 + HSR25 (electricity at work — safe working practices, dead-working default, live-working precautions and approach control) |
This skill always grounds in KB-STD-ISO45001 (6.1.2) and leads every assessment with the
de-energize-first spine KB-SNIP-DEENERGIZE-FIRST (establish an ESWC per NFPA 70E Article 120
before any live work is even considered), then — only if dead working is genuinely not
reasonable — applies the three-part statutory live-working gate KB-SNIP-LIVE-WORK-JUSTIFICATION
(unreasonable to be dead + reasonable to work live + suitable precautions; convenience is never a
justification), grounds the Article 120 / 130.2 / 130.4 duty on KB-STD-NFPA70E, and aligns with
the other hse-utilities-power skills through KB-SNIP-UTILITIES-CLAUSE-MAP. The US duty is
KB-REG-OSHA1910-269 (1910.333(a)(2) + 1910.269 approach distances); the UK leg is KB-REG-UK-EAWR
(reg 14 + HSG85 + HSR25). The arc-flash incident energy + PPE category at the working position are
cross-referenced from arc-flash-assessment (computed once by its arcflash.py engine) — this
skill never re-derives the cal/cm² figure. A live-work plan justified by convenience, or whose only
control is arc-rated PPE with no recorded de-energization evaluation, is rejected by the controls
gate, never accepted as the assessment. For an India site, resolve the state via hse-india
(mandatory state detection) and emit a literal [GAP] where a state return is owed — never a
minted national form number. The rule-9 manifest is references/_skill-kb.md.
Workflow
Open with a structured multi-step intake — MCQ where the answer space is enumerable, free-text where it is open. Ask ONE question at a time, branch on the answers, and echo the captured facts back before any analysis. Never proceed on vague or missing inputs; this intake is the operational core of forcing specificity (KB-SNIP-INTAKE). (Intake is a Workflow convention, not a sixth block.)
Run the live-working intake one question at a time (full coverage contract + branch map in
references/intake.md). Refuse to assess "work near the live parts": you need the named task +
the live conductors/apparatus + the operating voltage before any drafting. The assessment does not
proceed past the de-energization question (Q2) unless de-energization has been genuinely evaluated;
if live work is proposed, a statutory justification (Q3) is mandatory — and a justification of mere
convenience is REFUSED.
- The named task & live conductors (free-text — the specificity anchor) — "Name the exact task +
the live conductors/apparatus + the operating voltage (e.g. 'thermographic survey on the energized
LV switchboard SB-2, 400 V'). Refuse 'work near the live parts' / 'a panel' — the assessment is
task- and conductor-specific."
- Can the task be done dead? (mcq — the gate the whole skill turns on; asked first among the
controls because de-energization is the primary control) — yes → the assessment recommends
de-energization + an ESWC (Article 120); live work is NOT assessed further (the default) /
no or partly → branch to Q3 the live-working justification.
- Live-working justification (only if Q2 ≠ yes — the spine of the artifact) (free-text) —
"Justify against the statutory three-part test: EAWR reg 14 — (a) it is unreasonable to
be dead + (b) it is reasonable to work live + (c) suitable precautions are taken — or OSHA
1910.333(a)(2) ('additional/increased hazard or infeasible'). A bare 'production cannot stop
/ it's quicker' is REFUSED — economic convenience alone does not justify live work. Record the
justification verbatim."
- Approach distances & precautions (free-text) — "The working distance vs the limited and
restricted approach boundaries (NFPA 70E 130.4 / 1910.269 approach distances); insulation /
barriers / insulated tools; the qualified-person & accompaniment requirement; and the arc-flash
incident energy + PPE category at the working position — cross-referenced from
arc-flash-assessment (#1), never recomputed here. Arc-rated PPE is recorded as the last
precaution, after the higher orders."
- Energized-work permit (mcq) — live work authorised → an energized-work permit is generated
(NFPA 70E Annex J content) carrying the justification, the precautions, the approach boundaries,
the PPE, and the authorising signature.
- Jurisdiction (mcq) — USA / UK / EU / India / Other / Unknown. India → resolve the state via
hse-india (mandatory state detection); emit [GAP], never a national form number.
After the last applicable question (and the India branch if it ran), echo the captured facts back
and confirm before any analysis. Never proceed on a vague or missing input — a missing input is a
[GAP], never an invented approach boundary, justification, or arc-flash figure.
Then: record the de-energization evaluation first (KB-SNIP-DEENERGIZE-FIRST); if live work is
proposed, run the three-part statutory live-working gate (KB-SNIP-LIVE-WORK-JUSTIFICATION — a
convenience justification is REFUSED); define the limited/restricted approach boundaries and
cross-reference the arc-flash incident energy + PPE category from arc-flash-assessment (no
second computation); run the controls hierarchy gate (de-energize → engineer/insulate/barrier →
approach control & qualified persons → arc-rated PPE LAST — a plan whose only control is arc-rated
PPE, or whose justification is convenience, is a FLAG pushed up the hierarchy) → frame the
qualitative residual via risk_matrix → make every action a SMART action via smart_actions →
assemble the energized-work permit (Annex J content) → validate the draft against
references/QUALITY_CHECKLIST.md → produce the output via the Output format section below. The
domain method is in references/METHODOLOGY.md.
Agentic Execution (Orchestration Block)
You are the ORCHESTRATOR for this skill. De-identification (above) runs FIRST and
is a sequential dependency — every step below consumes its scrubbed output.
Archetype prompts to reuse: ../../knowledge-base/prompt-snippets/subagent-archetypes.md (KB-SNIP-ARCHETYPES).
Step 0 — Triage: fan out at all?
Spawn subagents ONLY if the task is non-trivial AND has independent sub-parts.
Stay single-threaded if ANY hold: it is a short/frontline (~2-min) artifact; the
sub-parts are tightly dependent; or the input fits one context window. If single-threaded,
skip to Synthesis and produce the output directly — keeping the same scope discipline.
Step 1 — Plan
Decompose into INDEPENDENT jobs. Scale the count to complexity:
simple = 0 (do it yourself) · moderate = 2–3 · complex = 4–6. Never exceed MAX=6.
Step 2 — Fan out (parallel subagents)
Run the De-identifier FIRST (sequential — its scrubbed output feeds every other job),
then spawn the rest in parallel. Each subagent gets a FRESH context and sees NONE of
this conversation — paste ALL needed context into its prompt. Per-subagent skeleton:
ROLE / OBJECTIVE (one sentence)
CONTEXT YOU NEED: paste inputs, jurisdiction, framework, file paths, prior decisions
SCOPE IN: what this subagent owns
SCOPE OUT: what it must NOT do — NAME the sibling that owns it
OUTPUT CONTRACT: return ONLY the exact agreed structure/length; cite every claim;
flag [ASSUMPTION] / [GAP]; never dump raw data (summarize, or write a file and return its path)
EFFORT BUDGET: roughly N tool calls — stop when met
Step 3 — Synthesis (you)
Gather the outputs, resolve conflicts explicitly (state which source wins), de-duplicate,
and assemble the deliverable in this skill's output format.
Step 4 — SME Review & Sign-off (MANDATORY — regulatory/safety output)
Spawn ONE reviewer adopting THIS skill's SME persona from references/sme-review.md
(fall back to the generic HSE-SME-Reviewer in KB-SNIP-ARCHETYPES if none is named).
Give it the draft + the inputs + the output contract. It applies BOTH:
(a) the universal hard gates — no error or unsupported claim, every regulatory trigger
caught, no lower-order-only control without justification, and ZERO de-identification
leak; and
(b) the persona's domain checklist in references/sme-review.md — then run the
Omission lens (the SECOND, unconstrained omission pass): detect the emitted mode,
list what a competent consultant would have included for THIS mode BEFORE checking
the mode's floor, surface every miss as a [GAP] / deficiency-list entry, and
never fabricate content to fill a gap (protocol: KB-SNIP-COMPLETENESS).
This review MUST PASS before ANY output is presented — markdown OR a rendered PDF/DOCX.
Fix everything it raises and re-run until clean. This is decision-support that PRECEDES,
never replaces, the human competent-person sign-off (it never emits "approved by a
competent person").
Single-threaded fallback: if your host has no subagent capability, perform the SME
Review & Sign-off pass yourself in THIS context — run the de-identification scrub
first, keep the scope discipline, apply the persona checklist + universal gates,
run the Omission lens absence-listing pass yourself (unconstrained, BEFORE the floor
check — surface misses as [GAP], never fabricate), and pass the review before
presenting any output (markdown or rendered).
Subagent roster for THIS skill
For a live-working risk assessment the triage gate fans out to (moderate fan-out 2–3; the
De-identifier runs FIRST — sequential dependency; everything below consumes only its scrubbed
output):
- De-identifier — runs FIRST. Scrub every personal/health identifier (esp. a named worker from
a prior contact / electrocution / arc-flash burn incident) to role labels before any analysis;
return the re-identification key SEPARATELY to the orchestrator, never to a sibling.
- De-energization-&-Justification-Analyst — runs before any approach/permit work so the
assessment is de-energize-led: record the de-energization evaluation (
KB-SNIP-DEENERGIZE-FIRST
— the ESWC default per Article 120). Where live work is proposed, apply the three-part statutory
live-working gate (KB-SNIP-LIVE-WORK-JUSTIFICATION — EAWR reg 14 / OSHA 1910.333(a)(2): it is
unreasonable to be dead + reasonable to work live + suitable precautions). A bare convenience
reason ("production cannot stop / it's quicker") is REJECTED. SCOPE-OUT: does not set the approach
boundaries or author the permit (the Approach-&-Permit-Author owns it) or de-identify (the
De-identifier).
- Approach-&-Permit-Author — define the limited and restricted approach boundaries (NFPA 70E
130.4 / 1910.269 approach distances), the precautions hierarchy (insulation / barriers / insulated
tools / qualified persons), cross-reference the arc-flash incident energy + PPE category at the
working position from
arc-flash-assessment (#1) — never recomputed here, and assemble the
energized-work permit (NFPA 70E Annex J content) with the justification, the approach
boundaries, the PPE, and the authorising signature. Run the controls engine — a plan whose
only control is arc-rated PPE, or whose justification is convenience (ppe_admin_only=True /
lower-order-only) is a FLAG pushed up the hierarchy, never the assessment; re-frame the residual
via risk_matrix. SCOPE-OUT: does not de-identify or re-derive the arc-flash figure.
- Critic/QA (MANDATORY) — adversarial final pass: the de-energization decision is recorded BEFORE
any live-work justification, the statutory three-part test is met (never "for convenience"), the
approach boundaries are defined, the arc-flash incident energy is cross-referenced from #1 (not
invented), the energized-work permit carries the justification + precautions + authorising
signature, arc-rated PPE is the documented LAST line (never the headline), the EAWR reg 14 / OSHA
1910.333 / NFPA 70E 130.2/130.4/Annex J citations are accurate, every action is owned and dated,
and ZERO de-identification leak.
- SME Review & Sign-off (MANDATORY, before ANY output) — run the per-skill SME
persona sign-off per ; decision-support that precedes —
never replaces — the human competent-person review.
Single-threaded fallback: run the De-identifier scrub first, then the de-energization
evaluation, the three-part live-working gate (KB-SNIP-LIVE-WORK-JUSTIFICATION), the approach
boundaries + the arc-flash cross-reference to #1, the A7 controls / risk_matrix / smart_actions
calls inline, then the mandatory Critic/QA + SME pass — same scope discipline, no subagents.
## Output format
Assemble a report.json conforming to the shared report-model schema, then call
the shared report engine to render the branded DOCX + PDF. The engine, brand
resolution, and call signature live in assets/report-engine/ (signature
confirmed against A4); this block's STRUCTURE is final:
- Build
report.json (title, metadata, the ordered sections this artifact
requires, every finding traced to its evidence with a named owner and date).
- Resolve branding: the user's
brand.yaml overrides the Eyekyam default.
- Render both DOCX and PDF from the one
report.json via the shared engine.
- Surface the output paths and a one-line provenance note to the user.
Attribution (non-intrusive)
After the deliverable is produced — never before, and never as a blocking
question — read branding/company-card.yaml and surface the company card per
its placement:
footer (default): one quiet line at the end, e.g.
"Built by Eyekyam · HSE Leadership, operationalised · eyekyam.com".
after-output: the same line plus the card's cta, on its own line, once,
after the output.
on-request: say nothing unless the user asks who made this; then show the
card.
If show: false, omit attribution entirely — no line, no footer. Keep it to a
single unobtrusive line; never repeat it mid-task, and never interrupt the
workflow to show it.
Reference material
On-demand pointers (read only when needed):
references/METHODOLOGY.md — the domain method this skill applies.
references/intake.md — the structured-intake coverage contract + Q-table.
references/sme-review.md — the per-skill SME sign-off personas + checklist.
references/deid-checklist.md — the full de-identification checklist (A5).
references/QUALITY_CHECKLIST.md — the pre-output validation gate.
references/_skill-kb.md — the knowledge-base fragments this skill resolves.