swarm-plan
Decompose a large task into an orchestration plan: which work is parallel, which is sequential, and where the merge happens. This skill plans. It does not spawn agents. Handing execution to /swarm-bulldoze, /swarm-explore, or manual orchestration is a separate step the user takes after seeing the plan.
The principles from swarm-principles apply. In particular: sequential is the default, and each parallel slice must be independent and self-contained.
The job
Turn one big ask into a dependency graph of workstreams, tagged by what can run at once. The output is a plan the user can eyeball before spending a single subagent token.
Process
- Restate the task in one line. If you cannot, it is too vague to plan. Ask.
- List the atomic workstreams. The smallest units of work that produce something usable on their own.
- Draw the dependencies. For each workstream, what must finish before it can start? A workstream with no upstream dependency is a candidate for the first parallel wave.
- Group into waves. Wave 1 is everything with no dependencies. Wave 2 is everything that depends only on wave 1. And so on. Within a wave, work runs concurrently.
- Check each wave against the cost ceiling. If a wave has more than 5 concurrent slices, either confirm with the user or split the wave.
- Name the merge. After the last wave, how do the outputs combine into the deliverable? If you cannot name a cheap merge, the decomposition is wrong. Reconsider.
Honesty check
Before presenting the plan, ask: is this actually faster than one sequential pass? If the waves are deep (lots of sequential dependency) and the parallel width is thin, the swarm buys almost nothing. Say so. A good outcome of this skill is sometimes "don't swarm this, just do it straight."
Output format
## Swarm plan: <task in one line>
**Verdict:** <worth swarming | marginal | just do it sequentially, because ...>
### Wave 1 (parallel, N slices)
- **<slice name>** — <what it does, what it outputs>
- **<slice name>** — <...>
### Wave 2 (depends on wave 1)
- **<slice name>** — <needs: slice X output>
### Merge
<how the wave outputs combine into the deliverable, and who >
Roughly x a single pass, peak concurrent agents.
Run for the read-heavy slices, or spawn wave 1 manually with these briefs:
Failure modes to avoid
- Planning parallelism that does not exist. If everything depends on everything, it is a sequential task wearing a swarm costume.
- Ignoring the merge until the end and discovering it is the expensive part.
- Producing waves wider than the cost ceiling without flagging it.
- Executing. This skill stops at the plan. It never spawns.