sap-pp

This skill handles SAP PP (Production Planning) including MRP, production orders, process orders, shop floor control, capacity planning, BOM management, routing, and PP-PI for process industries. Use when user mentions PP, MRP, MD01, MD04, production order, CO01, CO11N, MFBF, BOM, routing, work center, capacity, planned order, operation, confirmation, goods issue, backflush, MRP Live, MPS, demand management, scheduling, process order, PP-PI, KANBAN.

소스 정보

저장소
BoxLogoDev/sapstack
최근 소스 활동
2026년 8월 19일 13:23
감지된 SKILL.md 언어
영어
스타
20
포크
6

설치 방법

기본적으로 소스를 먼저 확인하는 Prompt가 선택됩니다. 직접 명령으로 전환하거나 로컬 사본을 다운로드할 수도 있습니다.

소스 파일 검토

설치 여부를 결정하기 전에 SKILL.md와 SkillsMP에 표시된 보조 파일을 읽어 보세요.

파일 탐색기
16 개 파일

SKILL.md 표시 중

SKILL.md
소스 지침 · 읽기 전용 미리보기
name
sap-pp
description
This skill handles SAP PP (Production Planning) including MRP, production orders, process orders, shop floor control, capacity planning, BOM management, routing, and PP-PI for process industries. Use when user mentions PP, MRP, MD01, MD04, production order, CO01, CO11N, MFBF, BOM, routing, work center, capacity, planned order, operation, confirmation, goods issue, backflush, MRP Live, MPS, demand management, scheduling, process order, PP-PI, KANBAN.
allowed-tools
Read, Grep
## 1. MRP (Material Requirements Planning) ### Planning Run - **MD01** (ECC / S/4HANA): classic total planning run for the configured planning scope - **MD01N** (S/4HANA): MRP Live → HANA-optimized, faster, recommended - **MD02**: single-item, multi-level MRP (for testing / selective re-planning) - **MD03**: single-item, single-level ### MRP Types (Material Master MRP 1 view) | Type | Description | |------|-------------| | PD | MRP — demand-driven (standard) | | VB | Manual reorder point | | VM | Automatic reorder point | | ND | No MRP | ### Lot Sizing Procedures | Key | Description | |-----|-------------| | EX | Lot-for-lot (exact demand quantity) | | FX | Fixed lot size | | WB | Weekly lot size | | MB | Monthly lot size | | HB | Replenishment up to maximum stock level | ### Exception Messages (MD04) Do not memorize a universal numeric lookup table. Interpret the exception text, exception group, element type, requirement/receipt dates, firming state, and the plant's rescheduling horizon/tolerance settings shown in the actual system. An exception is a planning signal, not authorization to move or delete supply. --- ## 2. Production Order ### Lifecycle ``` CO01 (Create) → governed Release → Goods Issue (MIGO 261) → Confirmation (CO11N) → Final Confirmation → TECO (technically complete) → Settlement (KO88) → CLSD (closed) ``` ### Key T-codes | T-code | Description | |--------|-------------| | CO01 | Create production order | | CO02 | Change production order | | CO03 | Display production order | | CO11N | Production order confirmation | | CO13 | Cancel confirmation | | CO24 | Missing parts list (component shortage) | | COOIS | Production order information system | | MIGO | Goods issue (261) / GR (101) for order | ### Goods Issue - Manual: MIGO → movement type 261 → production order number - Backflush: CO11N → backflush checkbox → automatic at confirmation - Partial GI: allowed — tracks remaining requirements in MD04 ### Settlement - KO88: individual order → settlement to: cost center / G/L / material (product cost collector) - Always simulate first → check receivers and amounts before actual posting - Variance categories: input price / input quantity / output price / output quantity / remaining input --- ## 3. Process Orders (PP-PI) Used in: chemical, pharmaceutical, food & beverage industries | T-code | Description | |--------|-------------| | COR1 | Create process order | | COR2 | Change process order | | COR6N | Process order confirmation | | CORK | PI sheet (process instruction) execution | | CORZ | Process order scheduling | Process instructions (PI sheets): define what operators enter during production Master recipe (C201): replaces routing for process industries --- ## 4. BOM Management ### Key T-codes | T-code | Description | |--------|-------------| | CS01 | Create BOM | | CS02 | Change BOM | | CS03 | Display BOM | | CS11 | BOM explosion (multi-level) | | CS14 | BOM comparison | | CS15 | Where-used list | ### BOM Usages | Usage | Description | |-------|-------------| | 1 | Production | | 2 | Engineering / design | | 3 | Universal | | 5 | Sales | | 6 | Costing | - Alternative BOMs: same material, multiple production methods (alt. 1, 2, 3...) - Selection method: MRP 4 view → BOM explosion / selection method --- ## 5. Routing and Work Centers **Work Center (CR01 / CR02)** - Define: capacity category, available capacity, costing formulas, scheduling formulas - Capacity: CR11 → available capacity per shift (machine / labor) **Routing (CA01 / CA03)** - Operations: sequence → work center → standard values (setup / machine / labor time) - Control key: determines: confirmation required / goods movement / costing / scheduling **Reference Operation Sets (CA11)** - Reusable operation templates → assign to multiple routings --- ## 6. Capacity Planning | T-code | Description | |--------|-------------| | CM01 | Capacity load overview (work center) | | CM21 | Capacity leveling (interactive) | | CM50 | Variable capacity planning | | CM99 | Scheduling overview | - Classic MRP quantity/date planning does not by itself prove finite capacity feasibility; evaluate and level capacity separately or use the configured detailed scheduling solution. - Bottleneck analysis: CM50 → identify overloaded work centers --- ## 7. Demand Management - MD61: planned independent requirements (make-to-stock strategy) - MD62: change planned independent requirements - Strategy group (MRP 3 view): determines how sales orders consume PIRs - Strategy 10: make-to-stock (no individual requirements) - Strategy 20: make-to-order (each order = separate production) - Strategy 40: planning with final assembly --- ## 8. S/4HANA PP Changes | Feature | ECC | S/4HANA | |---------|-----|---------| | MRP run | MD01 | MD01N (MRP Live) recommended | | MRP performance | Slower (sequential) | Parallel HANA-based | | Exception handling | MD04 list | Enhanced exception management | | Scheduling board | CM21 | Production Scheduling Board (Fiori) | | Shop floor | COOIS | Manufacturing Execution Fiori apps | | eWM integration | External WM | Embedded eWM (same system) | | pMRP | Not available | simulation capability for identifying potential capacity issues; scope/release dependent | --- ## 9. Diagnostic Response Contract Use Quick Advisory only for a stable single fact. Use the Evidence Loop when MRP created an unexpected proposal, a confirmation failed, ATP differs from the stock/ requirements list, automatic goods movement is stuck, or capacity is overloaded. ### 9.1 Required intake - SAP release and deployment model - industry and production type: discrete, repetitive, process, engineer-to-order - plant, MRP area if used, material, production version, and planning strategy - order/planned-order and operation where applicable - exact message class/number and long text - affected requirement/receipt dates, quantities, units, and time zone - MRP run type, planning date/time, scope, processing key, and last successful run - integration scope: QM, EWM, batch/serial, subcontracting, APO/PPDS, MES - recent master-data, configuration, interface, or transport change Never invent plant, material, work center, order, operation, storage location, batch, or capacity values. Ask for the real keys or use placeholders in a template. ### 9.2 Safety boundary - Start with display lists, logs, and simulation/evaluation. - Never convert, reschedule, firm, release, confirm, or reprocess a document solely because an exception message appears. - Before confirmation or goods-movement retry, prove the original posting state to avoid duplicate quantity and duplicate inventory posting. - Master/configuration changes require a transport and regression in QA. - Mass MRP, mass release, mass confirmation, and capacity dispatching require an approved selection list and stop condition. - Every Fix must have a Rollback Plan that preserves document flow and audit trail. ### 9.3 Standard evidence answer 1. **Issue** — material/order/operation, date, quantity, exact symptom 2. **Primary Root Cause** — strongest evidence first 3. **Hypotheses** — two to four with at least two falsifiers each 4. **Check** — T-code and menu path, fields, expected observation 5. **Fix** — representative QA case before actual processing 6. **Rollback** — standard cancellation/reversal or prior master/config restore 7. **Prevention** — monitoring, ownership, master-data validation --- ## 10. MRP Exception Interpretation — `MD04` `[T-code: MD04 | menu: SAP Easy Access > Logistics > Production > MRP > Evaluations > Stock/Requirements List]` `MD04` is a dynamic stock/requirements view. Read the full time-phased chain; do not make a decision from one exception number or one line in isolation. ### 10.1 Read sequence 1. Confirm material, plant/MRP area, planning segment, and current timestamp. 2. Record available quantity at the first relevant date and identify the requirement that changes the projected balance. 3. Identify element category: stock, sales/PIR/dependent requirement, reservation, planned order, purchase requisition/order, production/process order, or transfer. 4. Compare requirement date, receipt date, opening date, start/finish date, and any firming indicator. 5. Open element details and document linkage; confirm whether quantity/date has already changed since the MRP run. 6. Read exception short text and group from the live system, then relate it to rescheduling horizon, tolerance, firming fence, lot size, and procurement time. 7. Compare the last planning run log and master-data change timestamp. 8. For ATP questions, switch to `CO09`; `MD04` is not a substitute for the ATP scope of check or confirmed-quantity view. ### 10.2 Exception families | Family | What it signals | Required checks before action | |---|---|---| | Reschedule in/out | receipt date no longer aligns with net requirement | firming, vendor/production feasibility, dependent dates, tolerance horizon | | Cancel/reduce | supply appears excessive in current planning picture | later demand, safety stock, lot size, pegged requirement, contract/order commitment | | Create procurement proposal | shortage remains after receipts | procurement type, source, lot size, lead time, MRP controller review | | Opening/start date in past | procurement/production should already have started | actual execution status, calendar, lead time, release/availability blocks | | Firmed proposal exception | MRP cannot automatically adapt the firmed element | who firmed it, time fence, downstream commitment, manual change approval | | Master-data inconsistency | planning parameter or BOM/routing/source is missing/invalid | validity dates, production version, special procurement, status, selection ID | ### 10.3 Hypothesis and falsification examples **H1 — A firming boundary prevents MRP from correcting the receipt.** - Supports: firming indicator exists; exception begins at/inside time fence; MRP log says proposal was not changed. - Falsifies: element is unfirmed; no time fence applies; a controlled rerun changes the same proposal automatically. **H2 — Lead-time/master-data dates drive the late receipt.** - Supports: in-house/GR processing time or routing schedule reproduces the date; recent master change aligns with onset. - Falsifies: scheduling log uses different valid master data; manual simulation with current data yields the expected date. **H3 — Demand duplication creates an apparent shortage.** - Supports: PIR and sales requirement coexist contrary to consumption design; the duplicate quantity equals the shortage. - Falsifies: strategy and consumption correctly reduce PIR; both requirements are independently valid business demand. **H4 — A receipt is absent from the planning segment.** - Supports: receipt exists but belongs to another MRP area/special-stock segment; segment-specific list explains the difference. - Falsifies: receipt and requirement are in the same segment and participate in net requirements calculation. ### 10.4 Fix/rollback patterns - Date/quantity master defect: change the owned master data in development/QA, rerun a single-material plan, compare proposal delta; rollback the prior values if unrelated materials or dates shift outside the approved scope. - Incorrect demand: correct or cancel only the source demand document through its business process; rollback via the source document's standard change history. - Firmed proposal: obtain planner approval before unfirming/changing; rollback by restoring the prior firming/date/quantity if downstream commitments reject it. - Configuration defect: transport the minimum change and test the same planning scenario plus adjacent strategies/procurement types; use a backout transport. --- ## 11. Production Confirmation Failure — `CO11N` `[T-code: CO11N | menu: SAP Easy Access > Logistics > Production > Shop Floor Control > Confirmation > Enter > For Operation > Time Ticket]` ### 11.1 Pre-save evidence Before retrying, capture: - order and operation/suboperation - system/user status and whether the operation is confirmable - yield, scrap, rework, unit, posting date, actual work and activity quantities - final/partial/clear-open-reservation indicators - personnel/work center if required by the profile - goods-movement proposal and every message in the log - whether a confirmation number/counter was already created Do not simply press Save again after a timeout. First verify whether the confirmation and any goods movements committed in the backend. ### 11.2 Failure matrix | Symptom | Likely causes | Falsification evidence | |---|---|---| | Order/operation not confirmable | order not released, operation deleted/closed, sequence/control-key rule | active releasable status and same operation accepts a zero-save display simulation | | Quantity exceeds open quantity | prior/parallel confirmation, unit conversion, final confirmation | open quantity and confirmed counters support the entered amount | | Posting period error | posting date outside MM/FI/CO open interval | all relevant periods are open for the exact date and error persists | | Activity valuation error | cost center/activity type validity or price missing | correct valid assignment/price exists for posting date and controlled confirmation succeeds | | Goods movement error on save | component/batch/storage/EWM/account determination issue | confirmation without that proposed movement still fails with identical message | | Lock/update timeout | parallel user/job or update failure | no lock/update error exists and issue reproduces serially in QA | ### 11.3 Safe fix and rollback 1. Confirm current backend state and identify whether only confirmation, only goods movement, both, or neither posted. 2. Fix the confirmed root cause in its owning domain: PP status/quantity, MM stock/ batch, FI period/account, CO activity, EWM queue, or Basis update issue. 3. Repeat with the smallest valid quantity in QA or a designated test order. 4. Reconcile confirmation counter, order progress, component consumption, GR, and activity posting. 5. If the confirmation itself is wrong, use the standard confirmation cancellation process and verify its reversal documents before entering a corrected confirmation. 6. If only an automatic goods movement failed, do not cancel a correct confirmation by default; follow the `COGI` reprocessing path below. Rollback is the standard cancellation/reversal tied to the exact confirmation and material documents. Never delete confirmation records or material documents in a table browser. --- ## 12. Automatic Goods Movement Errors — `COGI` `[T-code: COGI | menu: SAP Easy Access > Logistics > Production > Shop Floor Control > Confirmation > Reprocessing > Automatic Goods Movements]` `COGI` holds/reprocesses failed automatic goods movements from confirmation-related processing. It is not a generic inventory correction queue. ### 12.1 Read-only triage 1. Select the narrowest authorized plant/date/order scope and export the error list. 2. Record order, operation, material, movement direction/type, quantity/unit, storage location, batch/special stock, and exact message. 3. Check whether the confirmation exists and whether any material document already posted for the same business event. 4. Group errors by root cause rather than correcting each row independently. 5. Confirm whether the required stock/master/config/interface state has changed since the failed attempt. ### 12.2 Common root causes - insufficient or wrong stock segment - missing/invalid storage location or batch determination - batch/serial/HU requirement not satisfied - posting period closed - material/account determination or valuation error - EWM-managed location integration/queue failure - unit-of-measure conversion or component master inconsistency - duplicate/parallel processing lock ### 12.3 Reprocess control - Correct the source master/config/stock/interface cause first. - Reprocess a single representative entry and verify its material document. - Check reservation reduction, order component consumption, stock and accounting. - Expand to the approved group only after the representative case reconciles. - Stop if a duplicate material document, unexpected batch, wrong quantity, or new account assignment appears. - Rollback with the standard material-document reversal and, if needed, confirmation cancellation in dependency order; never remove queue rows just to clear the list. --- ## 13. ATP Evidence — `CO09` vs `MD04` `[T-code: CO09 | menu: SAP Easy Access > Logistics > Sales and Distribution > Sales > Environment > Availability > Availability Overview]` `CO09` evaluates ATP according to the selected checking rule, scope of check, organizational/special-stock level, and whether requirements are included. It can show confirmed quantities that `MD04` is not designed to explain as ATP evidence. ### 13.1 Required comparison | Input | `CO09` | `MD04` | |---|---|---| | Material/plant/MRP area | must match ATP check context | must match planning segment | | Checking rule/scope | determines included receipts/issues and horizon | not an ATP scope-of-check simulation | | Special stock | sales order/WBS/consignment context may be required | displayed in its planning segment | | Dates | ATP date/confirmed schedule-line interpretation | time-phased requirement/receipt dates | | Result | ATP quantity and confirmations | projected stock/requirements picture | ### 13.2 Hypotheses - **Different scope of check**: supported when an element appears in `MD04` but is excluded by the active checking rule; falsified when scope includes it and ATP still ignores the element for another documented reason. - **Different organizational/special-stock level**: supported when stock exists in another segment; falsified when the exact segment has sufficient eligible stock. - **Stale or shifted receipt**: supported when the receipt failed/was rescheduled; falsified when it is firm, ATP-relevant, and available before requirement date. - **Existing confirmation consumes ATP**: supported when confirmed issues account for the difference; falsified when no relevant confirmation exists. Do not “fix ATP” by altering stock or confirmations without tracing the originating document and checking rule. --- ## 14. Capacity Load Diagnosis — `CM01` `[T-code: CM01 | menu: SAP Easy Access > Logistics > Production > Capacity Planning > Evaluation > Work Center View > Load]` `CM01` is a work-center load evaluation. It compares capacity requirements with available capacity using the selected overall/evaluation profiles and horizons; it does not itself prove that MRP planned finitely. ### 14.1 Read sequence 1. Confirm plant, work center, capacity category, hierarchy if used, and selection and evaluation periods. 2. Verify available-capacity intervals, factory calendar, shift sequence, breaks, utilization, number of individual capacities, and unit. 3. Drill into capacity requirements and identify planned/production/process/project/ maintenance orders contributing load. 4. Verify scheduling and capacity formulas, standard values, operation dates, splits, and distribution keys.