division-13-special-construction-bid-scope

Whole-division starter rules for CSI Division 13 - Special Construction. Use when starting, triaging, validating, or packaging a commercial special construction bid.

설치로 이동

소스 정보

저장소
ContractorKeith/contractor-bid
최근 소스 활동
2026년 7월 1일 22:41
감지된 SKILL.md 언어
영어
스타
5
포크
1

설치 방법

기본적으로 소스를 먼저 확인하는 Prompt가 선택됩니다. 직접 명령으로 전환하거나 로컬 사본을 다운로드할 수도 있습니다.

소스 파일 검토

설치 여부를 결정하기 전에 SKILL.md와 SkillsMP에 표시된 보조 파일을 읽어 보세요.

SKILL.md 표시 중

SKILL.md
소스 지침 · 읽기 전용 미리보기
name
division-13-special-construction-bid-scope
description
Whole-division starter rules for CSI Division 13 - Special Construction. Use when starting, triaging, validating, or packaging a commercial special construction bid.
# Division 13 - Special Construction Bid Scope Company: Your Company CSI division(s): 13 Spec section hints: 13 00 00, 13 11 00, 13 12 00, 13 18 00, 13 21 00, 13 34 00, 13 49 00 ## Scope Rule Base bid is limited to CSI Division 13 - Special Construction work specifically assigned to the bidder: pre-engineered structures, pools, special-purpose rooms, controlled environments, sound/vibration assemblies, and other specialty systems. Foundations, utilities, MEP connections, controls, permits, and delegated design must be explicitly included, excluded, or flagged before pricing. ## Base Scope - pre-engineered structures when assigned - special-purpose rooms - controlled environment rooms when assigned - aquatic and pool systems when assigned - sound and vibration specialty systems when assigned - radiation protection or shielded rooms when assigned - special construction coordination items ## Terms That Usually Identify This Scope - special construction - pre-engineered - prefabricated - pool - controlled environment - cleanroom - radiation protection - sound isolation - 13 00 ## Adjacent Scope To Exclude By Default - earthwork - concrete foundation - electrical feeder - plumbing piping ## Adjacent Scope To Flag Before Pricing - delegated design - permit - foundation - utility connection - controls ## Bid Package Workflow 1. Put source PDFs, spreadsheets, and addenda in `bid-docs/`. 2. Run `contractor-bid triage <project> --profile division-13-special-construction`. 3. Review `bid-package-working/takeoff/candidate-pages.md` (candidate pages plus scope signals). 4. Fill `takeoff/scope-pages-sources.json`, then run `contractor-bid build-packets <project>`. 5. Fill the takeoff JSON, then run `contractor-bid build-workbook <project>`. 6. Run `contractor-bid check <project> --profile division-13-special-construction` before sending anything out. 7. Record user corrections with `contractor-bid learn` and update this skill/profile when the correction should become a durable rule. ## Guardrail Do not silently price excluded or flagged adjacent scopes. Carry the scope boundary through the summary, workbook, proposal letter, alerts, and sendoff package.