| name | division-23-hvac-bid-scope |
| description | Whole-division starter rules for CSI Division 23 - Heating, Ventilating, and Air Conditioning (HVAC). Use when starting, triaging, validating, or packaging a commercial HVAC bid. |
Division 23 - Heating, Ventilating, and Air Conditioning (HVAC) Bid Scope
Company: Your Company
CSI division(s): 23
Spec section hints: 23 00 00, 23 05 00, 23 07 00, 23 09 00, 23 21 00, 23 31 00, 23 34 00, 23 37 00, 23 74 00
Scope Rule
Base bid is limited to CSI Division 23 - Heating, Ventilating, and Air Conditioning (HVAC) work specifically assigned to the bidder: HVAC piping, equipment, ductwork, air distribution, controls, insulation, testing, and balancing. Plumbing, fire suppression, electrical power, structural supports, roofing, and owner-furnished equipment must be explicitly included, excluded, or flagged before pricing.
Base Scope
- HVAC equipment
- ductwork and air distribution
- hydronic piping when assigned
- refrigerant piping when assigned
- mechanical insulation
- HVAC controls when assigned
- testing and balancing when assigned
Terms That Usually Identify This Scope
- HVAC
- mechanical
- ductwork
- air handler
- rooftop unit
- VAV
- diffuser
- hydronic
- refrigerant
- 23 00
Adjacent Scope To Exclude By Default
- plumbing fixture
- fire sprinkler
- electrical feeder
- roofing patch
Adjacent Scope To Flag Before Pricing
- controls
- test and balance
- roof curb
- gas piping
- structural support
Bid Package Workflow
- Put source PDFs, spreadsheets, and addenda in
bid-docs/.
- Run
contractor-bid triage <project> --profile division-23-hvac.
- Review
bid-package-working/takeoff/candidate-pages.md (candidate pages plus scope signals).
- Fill
takeoff/scope-pages-sources.json, then run contractor-bid build-packets <project>.
- Fill the takeoff JSON, then run
contractor-bid build-workbook <project>.
- Run
contractor-bid check <project> --profile division-23-hvac before sending anything out.
- Record user corrections with
contractor-bid learn and update this skill/profile when the correction should become a durable rule.
Guardrail
Do not silently price excluded or flagged adjacent scopes. Carry the scope boundary through the summary, workbook, proposal letter, alerts, and sendoff package.