| name | risk-matrix |
| description | Use when a plan, deal, project, or stakeholder move has material downside that needs explicit controls. Use when applying the Risk Matrix consulting method and when a user asks for Risk Matrix, method execution, structured diagnosis, or action planning. |
| license | Apache-2.0 |
Risk Matrix
Use this skill to run Risk Matrix as a practical consulting method, not as a generic framework explanation.
Method Notes
- Define risk as event + cause + consequence.
- Score likelihood, impact, and optional detectability, then assign owner and trigger.
Required Inputs
Collect or infer these inputs before execution:
- planned action or project
- risk list
- impact definitions
- owners
If an input is missing, do not block automatically. Mark it as missing, state the assumption used, and add a validation action.
When Not To Use
Do not use when numeric ratings would create false precision or when thresholds and owners are undefined. Treat legal, safety, and regulatory stop conditions separately from relative risk ranking.
Adjacent Methods
pre-mortem: surface failure modes before a defined plan starts.
scenario-planning: test strategy across uncertain external futures.
Step-by-Step Execution
| Step | Required input | How to execute | Output |
|---|
| Define objective | Plan/project/decision and success criteria. | State what outcome risks threaten. | Risk scope. |
| List risks | Assumptions, dependencies, history, stakeholder input. | Write each risk as event + cause + consequence. | Risk register. |
| Score risks | Likelihood, impact, detectability/evidence. | Rate each risk using consistent anchors. | Risk matrix. |
| Plan responses | Top risks and constraints. | Assign mitigation, contingency, owner, and trigger. | Risk response plan. |
| Set monitoring | Triggers, cadence, governance. | Define review rhythm and escalation threshold. | Risk monitoring plan. |
Output Template
### 1. Scope And Scales
Decision / plan:
Horizon:
Likelihood scale:
Impact scale:
### 2. Risk Register
| Risk event | Cause | Consequence | Likelihood | Impact | Evidence |
|---|---|---|---|---|---|
| | | | | | |
### 3. Response
| Priority risk | Prevent / reduce / transfer / accept | Owner | Due |
|---|---|---|---|
| | | | |
### 4. Monitoring
| Risk | Leading signal | Threshold | Contingency |
|---|---|---|---|
| | | | |
### Evidence And Next Decision
- Confirmed facts:
- Assumptions:
- Missing evidence:
- Next action, owner, and timing:
- Expected signal and decision threshold:
Quality Gate
- Produce the method-specific outputs for Scope And Scales, Risk Register, Response; do not substitute a generic framework summary.
- Tie every material score, causal claim, or stakeholder judgment to evidence or label it as an assumption.
- Include at least one disconfirming check, sensitivity, alternative explanation, or failure condition appropriate to the method.
- Convert the result into a named action or decision with an owner or stakeholder, timing, and observable signal.
- State missing inputs and the smallest validation action instead of inventing precision.
- Keep wording professional and plain enough that a smart non-specialist can use the output directly.