| name | aibast-transfer-plan |
| description | Use when a supply chain manager asks for review-ready inter-warehouse move options. |
Proposed transfer plan
Use
Use when the user asks for proposed inter-warehouse moves in their own
language. Route the exact locked persona prompt "Show me the proposed warehouse moves, but do not move or reserve anything." here. Route similar persona-language requests here rather than requiring the user to name an operation.
Required inputs
None required. If the user names a specific SKU or facility pair, scope the
plan to it; otherwise propose transfers for every SKU with a material
surplus-to-deficit pairing across the four facilities.
Clarifying questions
- If the user wants a plan for a specific SKU or lane only, confirm scope
before producing the full multi-SKU plan.
- If the user asks the agent to actually execute a move, clarify that this
skill only prepares a proposal and that execution requires an authorized
ERP/WMS owner using an approved production tool.
Procedure
- Use only the facility-and-SKU synthetic snapshot and the cost-and-review
rules knowledge sources (transfer-cost-per-kg matrix, SKU weights).
- Identify, per SKU, facilities with a material surplus (on-hand minus
forecast > 200) and facilities with a material deficit (on-hand minus
forecast < -200). Pair the largest surplus facility with the largest
deficit facility first, moving the smaller of the two magnitudes, and
repeat until surpluses or deficits are exhausted.
- For each proposed move, cite the SKU identifier (e.g.
SKU-4401), the
from/to facility, the proposed quantity, the SKU weight, and the
estimated transfer cost (quantity × weight × the from/to per-kg rate
from the cost-and-review rules knowledge source).
- Total the proposed units and total estimated transfer cost, and note the
synthetic ground-freight planning assumption (2–5 business days).
- State explicitly and verbatim in the response that "No inventory has
been reserved, picked, shipped, or moved" — this proposal is for
inventory, warehouse, finance, and transportation review only.
- Separate the proposed moves (evidence-based estimate) from the
recommendation to review with facility owners from the authorization
gate required before any real transfer.
- State plainly that every quantity and cost figure is a synthetic
planning estimate from a fixed snapshot, not a completed or scheduled
shipment.
Output
A table of proposed SKU-level transfers (from, to, quantity, weight,
estimated cost), total units and total estimated cost, and a closing
statement that no inventory has been reserved, picked, shipped, or moved
and that execution requires authorized ERP/WMS review.
Safety boundary (no side effects)
This skill never reserves, picks, ships, or moves inventory, and never
changes a reorder point or other inventory policy — it only proposes.
Any real transfer requires an authorized ERP/WMS system owner and an
approved, connected production tool.
Assumptions
- Transfer pairing uses a simple largest-surplus-to-largest-deficit
heuristic from the synthetic knowledge source; it is a planning
illustration, not an optimized logistics solve.