Skip to main content

plan

Breaks features/goals into phased plans with task lists, agent assignments, dependencies. Triggers: plan feature, implementation roadmap, break down task, project phases.

소스 정보

저장소
softspark/ai-toolkit
최근 소스 활동
2026년 5월 6일 12:54
감지된 SKILL.md 언어
영어
스타
179
포크
21

설치 방법

기본적으로 소스를 먼저 확인하는 Prompt가 선택됩니다. 직접 명령으로 전환하거나 로컬 사본을 다운로드할 수도 있습니다.

소스 파일 검토

설치 여부를 결정하기 전에 SKILL.md와 SkillsMP에 표시된 보조 파일을 읽어 보세요.

파일 탐색기
2 개 파일

SKILL.md 표시 중

SKILL.md
소스 지침 · 읽기 전용 미리보기
name
plan
description
Breaks features/goals into phased plans with task lists, agent assignments, dependencies. Triggers: plan feature, implementation roadmap, break down task, project phases.
user-invocable
true
effort
high
argument-hint
[goal]
allowed-tools
Read, Grep, Glob
# Project Planning $ARGUMENTS ## Workflow 1. **Analyze scope**: read the goal, scan relevant source files to understand current state 2. **Detect project type**: match keywords to determine stack and primary agents (see table below) 3. **Break into phases**: group tasks by dependency order (foundation, core, polish) 4. **Assign agents**: map each task to the best-fit agent with explicit dependencies 5. **Write plan file**: create `{project-slug}.md` in project root using [templates/plan-template.md](templates/plan-template.md) 6. **Validate**: confirm every requirement maps to at least one task, no circular dependencies exist, and success criteria are measurable ## Project Type Detection | Keywords | Type | Primary Agents | |----------|------|----------------| | landing, website | Static Site | frontend-specialist | | dashboard, admin | Web App | frontend + backend | | api, rest, graphql | API Only | backend-specialist | | mobile, ios, android | Mobile | mobile-developer | | cli, terminal | CLI Tool | backend-specialist | ## Planning Constraints - Create plan documents only, NO code writing, NO file creation (except the plan) - Each task must name affected file(s) and a single owning agent - Phases must have explicit dependency edges (`Phase 1 -> Phase 2`) - Success criteria must be verifiable (command to run, expected output, or observable behavior) ## KB Integration Before planning: ```python smart_query("project template: {type}") hybrid_search_kb("architecture {pattern}") ``` ## Estimation & Templates ### T-shirt sizing (use for >1 day work) | Size | Effort | Example | |------|--------|---------| | XS | <2h | typo, add field | | S | 2-4h | simple component, basic API | | M | 1-2 days | feature with tests | | L | 3-5 days | complex feature | | XL | 1-2 weeks | major subsystem | Avoid hour-precise estimates beyond a week — they are false confidence (cone of uncertainty: 4× variance at idea, 1.5× at design). ### SMART tasks vs phase outcomes Plan-level tasks should be **phase-aligned outcomes** ("authentication ships behind a feature flag"), not SMART implementation steps ("add JWT middleware"). The latter belongs in the issue tracker after `/prd-to-issues`. ### Pre-mortem (mandatory for >1 day plans) List ≥5 named failure modes with mitigation. A 2-bullet pre-mortem is theater. Risk register cap: 10 entries ranked by (probability × impact); below line 10 is noise. ## Related Skills - Plan approved? -> `/orchestrate` or `/workflow` to execute with agents - Need requirements first? -> `/write-a-prd` for structured product requirements - Want to stress-test the plan? -> `/grill-me` for Socratic questioning - Ready to break into issues? -> `/prd-to-plan` -> `/triage-issue` ## Rules - **MUST** break work into phases where each phase is independently shippable (tracer-bullet discipline) — waterfall phases defer all risk to the end - **MUST** define measurable success criteria per phase before proposing tasks — "the user is happy" is not a criterion - **NEVER** write code in this skill — the output is a plan document, not a patch - **NEVER** invent an agent; every task lists a real agent from `app/agents/` or a real skill from `app/skills/` with a reason for the choice - **CRITICAL**: every phase has an explicit rollback or scope-cut option. A plan with no way to stop mid-project is a sunk-cost trap. - **MANDATORY**: dependencies between phases are explicit edges (`Phase 1 → Phase 2`). Circular dependencies are always a planning bug, not a valid state. ## Gotchas - "SMART" tasks are often too small to be strategic and too vague to be tactical. Tasks at the plan level should be phase-aligned outcomes ("authentication ships behind a feature flag"), not implementation steps ("add JWT middleware"). - Agent assignment drifts during execution — the agent named in the plan may be unavailable or wrong when the work starts. Document the **role** (`backend-specialist`) alongside the assigned agent, so a substitute is unambiguous. - Plans that start with a Research phase often consume 80% of the timeline without producing shippable output. If research is truly needed, cap it with a timebox and a concrete artifact (ADR, spike doc). - Dependency graphs with diamond patterns (A→B, A→C, B→D, C→D) silently serialize D. If parallel phases feel slow, check for an unintended diamond. - Success criteria based on code metrics (coverage, lint count) incentivize gaming them. Prefer user-facing criteria (p95 latency, first-time-success rate on the happy path). ## When NOT to Use - For writing a **PRD** (product requirements) first — use `/write-a-prd` - For breaking a PRD into phases — use `/prd-to-plan` - For filing issues against a plan — use `/prd-to-issues` - For stress-testing an existing plan — use `/grill-me` - For executing a plan with agents — use `/orchestrate` or `/workflow` - For a refactor with incremental commits — use `/refactor-plan`
GitHub에서 보기