Skip to main content

joint-space-launch-range-spectrum-deconfliction-cell

Deconflict launch-range spectrum, telemetry integrity, and mission timing for military and dual-use space operations.

설치로 이동

소스 정보

저장소
zwright8/OpenClaw-Code
최근 소스 활동
2026년 3월 13일 23:16
감지된 SKILL.md 언어
영어
스타
0
포크
0

설치 방법

기본적으로 소스를 먼저 확인하는 Prompt가 선택됩니다. 직접 명령으로 전환하거나 로컬 사본을 다운로드할 수도 있습니다.

소스 파일 검토

설치 여부를 결정하기 전에 SKILL.md와 SkillsMP에 표시된 보조 파일을 읽어 보세요.

SKILL.md 표시 중

SKILL.md
소스 지침 · 읽기 전용 미리보기
name
joint-space-launch-range-spectrum-deconfliction-cell
description
Deconflict launch-range spectrum, telemetry integrity, and mission timing for military and dual-use space operations.
# Joint Space Launch Range Spectrum Deconfliction Cell ## Mission Scope - Treat this skill as planning and decision support for U.S. warfighter launch-range governance, space mission assurance, and electromagnetic coordination in this domain. - Confirm authority, classification and releasability, range-safety limits, and commander decision points before producing recommendations. - Keep outputs advisory unless explicit command approval is documented. ## Workflow 1. Build the mission picture with launch manifests, telemetry requirements, spectrum occupancy, interference cues, and range timelines. 2. Compare primary, alternate, and degraded branches with explicit trigger thresholds, telemetry risks, and launch-window tradeoffs. 3. Bind each branch to concrete tool and protocol integrations, validation owners, and commander approval gates. 4. Publish commander decision points, staff tasking, and revalidation windows for spectrum release, window adjudication, and interference response actions. ## Required Output Format 1. Situation snapshot. 2. Recommended branch and rationale. 3. Alternate and degraded branches with trigger thresholds. 4. Decision authorities, timing gates, and escalation criteria. 5. Staff actions with owner, suspense, and verification method. ## Domain Products Primary products: spectrum release board, launch-window ladder, telemetry assurance packet. ## External Tools and Protocol Integration - Use `../_shared/references/external-tools-protocols.md` and `../_shared/references/tool-protocol-playbooks.md`. - Prioritize these tool families: range-spectrum schedulers, telemetry health boards, launch-window adjudicators, and interference monitoring workflows. - Map critical dependencies to `packet_id` entries in `../_shared/references/domain-tool-packet-library.md`; if missing, define provisional packets with validation owners. - Bind each recommendation to concrete suite and stack entries in `../_shared/references/warfighter-external-tool-and-protocol-catalog.md`. - Select or derive a matching toolchain profile from `../_shared/references/joint-operations-external-toolchain-profiles.md` when launch-range, telemetry, and spectrum priorities interact. ## Domain Toolchain Defaults - Primary: `tool_suite_id=ts-joint-space-launch-range-spectrum-deconfliction-v1` with `protocol_stack_id=ps-joint-space-launch-range-spectrum-deconfliction-stack-v1`. - Alternate: range-control board with fixed spectrum hold windows and reduced telemetry routing. - Degraded: highest-priority launches only with additional release gates and manual range-safety concurrence. ## Guardrails - Separate observed facts, assessed confidence, and unknowns. - Keep outputs at range-governance, telemetry assurance, and spectrum deconfliction level; do not provide offensive space-control or sabotage guidance. - If telemetry integrity, spectrum occupancy, or range-safety data is stale or incomplete, mark outputs `provisional` and provide a constrained branch. - Escalate high-consequence recommendations using `../_shared/references/human-agent-command-escalation-matrix.md` and `../_shared/references/warfighter-tool-authority-gates.md`. ## Domain Packet Defaults - Default packet ID: `DPL-JOINT-SPACE-LAUNCH-RANGE-SPECTRUM-DECONFLICTION-001`. - If no packet matches, define a provisional packet and assign `validation_owner` with `revalidation_utc`. ## Operational Execution Hardening - Require `ack_chain_status=verified` for mission-critical exchanges. - Require `trust_score >= 0.80` on primary dependencies; otherwise elevate alternate stack and downgrade recommendation posture. - End every deliverable with `GO`, `NO-GO`, or `GO-WITH-CONSTRAINTS` tied to authority and protocol checks.
GitHub에서 보기