# Bid Tracker
A single, easy-to-read spreadsheet of every bid in flight, plus an archive of finished ones.
It spans the whole workspace, not one project.
- **Source of truth:** `.contractor-bid/bid-tracker.json` (deterministic; edited only through the CLI).
- **Readable output:** `Bid-Tracker.xlsx` at the workspace root, regenerated after every change.
- Sheet 1 **Active Bids** — Project, Location, Due, Progress, Next Action, Client / GC, Updated.
- Sheet 2 **Archived & Completed** — Project, Location, Due, Outcome, Client / GC, Closed.
- Due dates within 2 days are amber, past-due are red. Progress/outcome cells are color-coded.
- When a bid is finished, it **moves** from Active to Archived — it is not duplicated.
## The permission rule (do not skip)
**Never write to the bid tracker silently.** Before running any tracker command that changes data
(`track-add`, `track-update`, `track-move`, `track-reopen`), you MUST:
1. Show the user a one-line **summary of the exact change** you intend to make.
2. **Wait for explicit confirmation** ("yes" / "go ahead"). If the user does not confirm, do not run it.
3. After running, repeat back the tool's confirmation line so the user sees what was written.
Read-only commands (`track-list`, `track-build`) do not require permission.
### Summary format to show before updating
```
Bid tracker update — please confirm:
Bid: <project name>
Action: add | update | move-to-archived | reopen
Changes: <field>: <old> → <new> (one line per field)
Result: Active Bids / Archived & Completed
Proceed? (yes / no)
```
Example:
```
Bid tracker update — please confirm:
Bid: Riverside Plaza Fence
Action: update
Changes: Progress: Pricing → Submitted
Next Action: Finish BOM → Follow up with GC Friday
Result: stays on Active Bids
Proceed? (yes / no)
```
## When to propose an update
Offer an update (then wait for confirmation) when:
- A new bid project is created (`contractor-bid new …`) → propose `track-add <project-folder>`.
- You learn the **due date**, location, or GC contact → propose `track-update`.
- Progress moves a stage: `New → Triage → Takeoff → Pricing → Submitted → Won/Lost/No-Bid`.
- The **next action** changes after triage, takeoff, a check run, or an RFI.
- The bid is **submitted** → set Progress `Submitted`.
- The bid is **won, lost, no-bid, or otherwise done** → propose `track-move --outcome …`
(moves it to Archived & Completed).
## Commands
```bash
# Add from a bid project folder (pulls name, location, due, GC from project.json):
contractor-bid track-add bids/070126-riverside-plaza --progress Triage --next "Run triage"
# Add manually (no project folder yet):
contractor-bid track-add --name "Riverside Plaza Fence" --location "Tampa, FL" \
--due "2026-07-01 14:00" --gc "Acme GC — John" --progress New
# Update fields on an existing bid (match by project name or id):
contractor-bid track-update "Riverside Plaza Fence" --progress Submitted --next "Follow up Friday"
# Finish a bid -> moves it to the Archived & Completed sheet:
contractor-bid track-move "Riverside Plaza Fence" --outcome won # won | lost | no-bid | completed
# Bring an archived bid back to Active:
contractor-bid track-reopen "Riverside Plaza Fence"
# Read-only (no permission needed):
contractor-bid track-list # active bids in the terminal
contractor-bid track-list --all # include archived/completed
contractor-bid track-build # just regenerate Bid-Tracker.xlsx
```
Run these from the workspace root (the folder holding `profiles/` and `.contractor-bid/`), or pass
`--root <workspace>`.
## Guardrails
- **Do not invent values.** Pull project name / location / due / GC from `project.json` or from what
the user actually said. Leave a field blank rather than guessing.
- Keep "Progress" short — a single stage word — so the sheet stays readable on one screen.
- One bid = one row. Never duplicate a bid across both sheets; use `track-move` / `track-reopen`.
- The tracker holds the user's real bid pipeline (project names, GC contacts). It is gitignored;
do not commit `Bid-Tracker.xlsx` or `.contractor-bid/bid-tracker.json`.