Skip to main content

diy-planner

DIY home improvement project planner with project scoping, tool and material requirements, step-by-step guides, safety precautions, skill assessment, budget estimation, and guidance on when to DIY versus hiring a professional. Use when the user asks about diy planner, or needs help with diy home improvement project planner with project scoping, tool and material requirements, step-by-step guides, safety precautions, skill assessment, budget estimation, and guidance on when to diy versus hiring a professional. Do NOT use when the request requires professional specialized advice or falls outside the scope of diy planner.

Ir para a instalação

Informações da origem

Repositório
FerroxLabs/wayland
Última atividade na origem
7 de junho de 2026 às 16:09
Idioma detectado do SKILL.md
inglês
Estrelas
605
Forks
113

Opções de instalação

Por padrão, está selecionado o prompt que primeiro revisa a origem. Você pode mudar para um comando direto ou baixar uma cópia local.

Revise os arquivos de origem

Leia o SKILL.md e os arquivos complementares exibidos pelo SkillsMP antes de decidir se vai instalar.

Exibindo SKILL.md

SKILL.md
Instruções da origem · Visualização somente leitura
name
diy-planner
description
DIY home improvement project planner with project scoping, tool and material requirements, step-by-step guides, safety precautions, skill assessment, budget estimation, and guidance on when to DIY versus hiring a professional. Use when the user asks about diy planner, or needs help with diy home improvement project planner with project scoping, tool and material requirements, step-by-step guides, safety precautions, skill assessment, budget estimation, and guidance on when to diy versus hiring a professional. Do NOT use when the request requires professional specialized advice or falls outside the scope of diy planner.
license
Apache-2.0
metadata
{"author":"foundry-skills","version":"1.0.0","tags":"home-maintenance guide step-by-step","category":"home-household","subcategory":"home-maintenance","depends":"","disclaimer":"none","difficulty":"intermediate"}
# DIY Project Planner ## When to Use **Use this skill when:** - User asks about diy planner - User needs guidance on diy planner topics - User wants a structured approach to diy planner **Do NOT use when:** - Request requires professional consultation beyond educational guidance - User needs emergency assistance ## Questions to Ask the User First 1. **What project are you considering?** (Describe what you want to accomplish) 2. **Why are you doing this?** (Fix a problem, upgrade, cosmetic improvement, increase value) 3. **What's your DIY experience level?** (Never done anything, some basics, intermediate, experienced) 4. **What tools do you already own?** (Basic hand tools, power tools, specialty tools) 5. **What's your budget?** (Include tools you may need to buy) 6. **What's your timeline?** (Weekend project, can take a few weeks, no rush) 7. **Is this a rental or owned home?** (Impacts what you can/should do) 8. **Age of the home?** (Pre-1978 = lead paint concern, older = different methods) 9. **Any relevant skills?** (Carpentry, plumbing, electrical, painting experience) 10. **Have you pulled permits before?** (Do you know your local requirements?) ## DIY vs. Hire a Professional Decision Framework ### The Decision Matrix ``` DIY SUITABILITY ASSESSMENT: Rate each factor 1-5: SAFETY RISK: 1 = Minimal (painting a room) 5 = Significant (electrical panel, structural, gas line) Score: ___ SKILL REQUIRED: 1 = Basic (anyone can learn in 10 minutes) 5 = Expert (years of training needed) Score: ___ PERMIT/CODE REQUIREMENT: 1 = No permits needed 5 = Permits required, inspections mandatory Score: ___ COST OF FAILURE: 1 = Redo it easily ($50 and an afternoon) 5 = Catastrophic (structural damage, water damage, fire risk) Score: ___ TOOL INVESTMENT: 1 = Basic tools you have or can borrow 5 = Expensive specialty tools used once Score: ___ TOTAL: ___ / 25 5-10: Great DIY project 11-15: DIY possible with research and care 16-20: Consider a professional (or DIY with a mentor) 21-25: Hire a professional ``` ### Always Hire a Professional For ``` DO NOT DIY (safety and code reasons): [ ] Electrical panel work (service upgrade, new panel) [ ] Gas line installation or modification (ANY gas work) [ ] Structural modifications (load-bearing walls, foundation) [ ] Main sewer line work [ ] Roof replacement (minor repairs may be DIY) [ ] Asbestos removal [ ] Major plumbing (re-piping, water main) [ ] HVAC installation or major repair [ ] Anything requiring engineering calculations [ ] Work in your area that requires a licensed contractor by law DIY WITH CAUTION (research thoroughly, permits may be needed): [ ] Adding an outlet or light fixture [ ] Minor plumbing (faucet, toilet, under-sink) [ ] Drywall repair [ ] Door/window replacement [ ] Fence installation [ ] Deck building (usually requires permit) [ ] Bathroom renovation (non-structural) [ ] Tile work GREAT DIY PROJECTS (safe, learnable, satisfying): [ ] Painting (interior and exterior) [ ] Trim and molding installation [ ] Hardware replacement (knobs, pulls, hinges) [ ] Shelving and storage [ ] Backsplash installation [ ] Flooring (laminate, LVP, tile) [ ] Fixture swaps (light fixtures, faucets) [ ] Landscaping and gardening [ ] Caulking and weatherstripping [ ] Closet organization systems ``` ## Project Planning Template ### Universal Project Plan ``` DIY PROJECT PLAN PROJECT: _______________ CATEGORY: [ ] Repair [ ] Improvement [ ] Cosmetic [ ] Maintenance ROOM/AREA: _______________ DIY SUITABILITY SCORE: ___ / 25 OBJECTIVE: What will be different when done: _______________ Why it matters: _______________ SCOPE DEFINITION: Included in this project: _______________ NOT included (do later): _______________ Potential scope creep risks: _______________ SKILL REQUIREMENTS: Skills needed: _______________ Skills I have: _______________ Skills to learn: _______________ Learning resources: _______________ PERMITS NEEDED: [ ] None required [ ] Building permit [ ] Electrical permit [ ] Plumbing permit [ ] Check with local building department: _______________ Cost of permits: $___ TIMELINE: Prep/planning: ___ days/hours Execution: ___ days/hours Drying/curing time: ___ days Cleanup/finishing: ___ days/hours Total elapsed: ___ days Best time to do this: _______________ BUDGET: Materials: $___ Tools (need to buy): $___ Permits: $___ Contingency (10-20%): $___ TOTAL: $___ vs. Professional quote: $___ TOOLS NEEDED: Already own: [ ] _______________ [ ] _______________ Need to buy: [ ] _______________ ($___) [consider renting: [ ] Yes [ ] No] [ ] _______________ ($___) Can borrow from: [ ] _______________ MATERIALS LIST: Item: _________ Quantity: ___ Unit cost: $___ Total: $___ Item: _________ Quantity: ___ Unit cost: $___ Total: $___ Item: _________ Quantity: ___ Unit cost: $___ Total: $___ Waste factor: +10% for most materials, +15% for tile/flooring SAFETY REQUIREMENTS: [ ] Safety glasses [ ] Work gloves [ ] Dust mask/respirator [ ] Hearing protection [ ] Knee pads [ ] First aid kit [ ] Other: _______________ [ ] Know where water/electrical shutoffs are STEP-BY-STEP PLAN: Day/Phase 1: _______________ Day/Phase 2: _______________ Day/Phase 3: _______________ [Detailed steps below] ``` ## Common DIY Project Guides ### Project: Painting a Room ``` PROJECT: Interior Room Painting Difficulty: Beginner Time: 1-2 days (including drying) Cost: $100-300 per room (paint + supplies) Skill needed: Minimal -- excellent first project TOOLS NEEDED: [ ] Paint roller (9" for walls, 4" for tight spots) [ ] Roller covers (3/8" nap for smooth walls, 1/2" for textured) [ ] Angled brush (2.5" for cutting in, Purdy or Wooster brand) [ ] Paint tray and liners [ ] Painter's tape (FrogTape or 3M green for clean lines) [ ] Drop cloths (canvas preferred, plastic for floors) [ ] 5-in-1 tool (scraper, opener, cleaner) [ ] Step ladder [ ] Rags and bucket MATERIALS: Paint: Calculate square footage (length x height x number of walls) Primer: Needed if: dark to light, stain blocking, bare drywall, new patch Painter's tape: 1 roll per window/door frame Drop cloths: enough to cover floor PAINT SELECTION: Finish guide: Flat/matte: Hides imperfections, hard to clean, best for ceilings Eggshell: Slight sheen, easy to clean, best for living rooms/bedrooms Satin: Moderate sheen, very cleanable, best for kitchens/baths/kids' rooms Semi-gloss: High sheen, most durable, best for trim/doors/cabinets STEP-BY-STEP: PREP (this is where the quality comes from -- don't rush): 1. Remove furniture or move to center and cover 2. Remove switch plates, outlet covers, curtain hardware 3. Clean walls (dust, cobwebs, grease spots with TSP) 4. Fill holes and dents with spackle, let dry, sand smooth 5. Sand any glossy surfaces lightly (for paint adhesion) 6. Apply painter's tape along trim, ceiling line, and fixtures 7. Lay drop cloths, covering all floors and remaining furniture 8. Prime if needed (dry 2 hours minimum) PAINT: 9. Stir paint thoroughly (do NOT shake cans at the store -- causes bubbles) 10. CUT IN first: paint 2-3" border along all edges with brush - Ceiling line, corners, around trim, around outlets - Only cut in as much as you can roll within 10 minutes 11. ROLL walls: Load roller, roll in "W" pattern, then fill in - Maintain a wet edge (don't let edges dry before connecting) - Apply even pressure, don't press too hard - Work in 4x4 foot sections 12. Let first coat dry (2-4 hours, check paint can) 13. Apply second coat (same process: cut in, then roll) 14. Remove tape at 45-degree angle while final coat is still 15. Touch up any spots with small brush after fully dry CLEANUP: 16. Latex paint: wash brushes and rollers with warm soapy water 17. Wrap roller covers in plastic wrap if reusing next day 18. Pour leftover paint back into can, seal tightly 19. Replace switch plates and outlet covers 20. Move furniture back after 24 hours TIPS: - Buy the best paint you can afford (covers better, lasts longer) - Buy quality brushes (Purdy, Wooster) -- they make a huge difference - Maintain a wet edge to avoid lap marks - Paint in the same direction as natural light enters the room - If you see drips, roll over them immediately - Keep the room ventilated (open windows, run fans) ``` ### Project: Installing Laminate/LVP Flooring ``` PROJECT: Floating Floor Installation (Laminate or Luxury Vinyl Plank) Difficulty: Intermediate Time: 1-2 days per room Cost: $2-6/sq ft (materials) + $0.50-1/sq ft (underlayment) Skill needed: Measuring, cutting, patience TOOLS NEEDED: [ ] Tape measure [ ] Pencil [ ] Utility knife (for LVP) or miter saw/circular saw (for laminate) [ ] Tapping block and pull bar [ ] Spacers (usually included) [ ] Rubber mallet [ ] Speed square [ ] Pry bar (for last row) [ ] Jigsaw (for irregular cuts around door frames) [ ] Safety glasses and knee pads MATERIALS: Flooring: Room sq ft + 10% waste factor = ___ sq ft needed Underlayment: Same sq ft (check if attached to flooring already) Transition strips: For doorways and edges Quarter round or shoe molding: Perimeter of room Moisture barrier: If over concrete (6-mil poly) STEP-BY-STEP: PREP: 1. Acclimate flooring in the room for 48 hours (important!) 2. Remove existing baseboards carefully (label for reinstallation) 3. Remove old flooring if needed (or install over if subfloor is smooth) 4. Check subfloor: must be flat (within 3/16" over 10 feet) 5. Install moisture barrier if over concrete 6. Install underlayment (tape seams, don't overlap) 7. Undercut door frames (lay a plank flat against frame, cut with oscillating INSTALL: 8. Start along the longest straight wall 9. Place spacers along starting wall (1/4" expansion gap) 10. First row: cut off the tongue side, lay planks along wall 11. Stagger end joints by at least 6" between rows (random looks best) 12. Click or tap planks together per manufacturer instructions 13. Work left to right, row by row 14. Measure and cut last plank in each row 15. Use pull bar for last row (tight against wall) 16. Cut around obstacles (vents, pipes) with jigsaw FINISH: 17. Remove all spacers 18. Install transition strips at doorways 19. Reinstall baseboards (nail to wall, not to floor) 20. Or install quarter round/shoe molding to cover expansion gap 21. Caulk where molding meets door frames COMMON MISTAKES TO AVOID: - Skipping acclimation (causes buckling later) - Not leaving expansion gap (floor needs to float) - Not staggering joints enough (looks like a ladder) - Nailing through the floor (it's called floating for a reason) - Not checking subfloor flatness (causes clicking and bouncing) - Forcing pieces (if it doesn't click easily, something is wrong) ``` ### Project: Kitchen Backsplash ``` PROJECT: Tile Backsplash Installation Difficulty: Intermediate Time: 2-3 days (including dry time) Cost: $3-15/sq ft tile + $50-100 supplies Skill needed: Measuring, cutting, patience with thin-set MATERIALS: [ ] Tile: Sq ft of backsplash + 15% waste [ ] Thin-set mortar (modified for walls) [ ] Grout (sanded for joints > 1/8", unsanded for smaller) [ ] Grout sealer [ ] Tile spacers (size matching desired grout line) [ ] Caulk (matching grout color, for corners and bottom edge) SIMPLIFIED ALTERNATIVE: Peel-and-stick tile or panels - No thin-set, no grout, no cutting tools needed - Cost: $5-15/sq ft - Difficulty: Beginner - Removable (great for renters) - Not as durable but dramatically easier ``` ## Safety Precautions ### Critical Safety Rules ``` UNIVERSAL DIY SAFETY RULES: BEFORE STARTING ANY PROJECT: 1. Know where to shut off water, electricity, and gas 2. Test for live wires before any electrical work (non-contact voltage tester, $15) 3. Check for lead paint if home is pre-1978 (test kit, $10-15) 4. Check for asbestos in older homes before disturbing materials 5. Call 811 before digging (free utility locating service) 6. Tell someone you're doing the project (in case of emergency) 7. Keep phone accessible at all times POWER TOOL SAFETY: - Read the manual (every tool is different) - Wear safety glasses ALWAYS (non-negotiable) - Wear hearing protection with loud tools - Wear dust mask when cutting, sanding, or demolishing - Never remove safety guards - Keep fingers away from blades (use push sticks for table saw) - Unplug tools before changing blades or bits - Don't wear loose clothing, jewelry, or long unsecured hair - Work in well-lit, clean areas - Never use power tools while tired or impaired - Keep sharp tools sharp (dull tools require more force = more dangerous) LADDER SAFETY: - 4:1 rule: base 1 foot out for every 4 feet of height - Always maintain 3 points of contact - Never stand on top two rungs - Set on firm, level ground - Face the ladder, don't lean sideways - Have someone hold the base for tall work - Don't exceed weight rating ELECTRICAL SAFETY: - Always turn off breaker before electrical work - Verify power is off with voltage tester (don't trust labels) - Never work on live circuits - GFCIs are required within 6 feet of water sources - When in doubt, call an electrician HAZARDOUS MATERIALS: - Lead paint: Do not sand, scrape, or heat without proper containment - Asbestos: Do not disturb. Get professional testing and abatement. - Mold: Small areas (< 10 sq ft) can be DIY. Larger areas need professionals. - Chemical products: Read all labels, ensure ventilation, store properly ``` ## Budget Estimation Guide ``` TYPICAL PROJECT COST RANGES (DIY vs. Professional): Project | DIY Cost | Pro Cost | Savings ---------------------------|---------------|----------------|-------- Paint a room | $100-300 | $400-800 | 50-70% Install LVP flooring | $2-6/sq ft | $5-12/sq ft | 40-60% Kitchen backsplash | $200-600 | $600-1,500 | 50-70% Replace toilet | $150-400 | $300-600 | 30-50% Replace faucet | $50-250 | $200-500 | 50-70% Install shelving | $30-150 | $200-500 | 70-85%
Ver no GitHub
Este SKILL.md e muito grande, entao o SkillsMP mostra aqui apenas a primeira secao. Ver no GitHub