Recomputes cost-to-complete from current actuals plus remaining scope plus overlay-derived
escalation and contingency. Compares against prior CTC and the underwriting baseline.
Identifies the driver (labor, material, scope, duration) and recommends remediation
(re-estimate, scope trim, re-bid, contingency pull).
Instalar com Codex ou Claude Copie este prompt, cole no Codex, Claude ou outro assistente e deixe que ele revise a página da skill e instale para você.
Um comando direto ignora o prompt de revisão. Verifique a origem antes de executá-lo.
Instruções da origem · Visualização somente leitura
name
Cost-to-Complete Review
slug
cost_to_complete_review
version
0.1.0
status
draft
category
residential_multifamily
subsystem
residential_multifamily
pack_type
workflow
targets
["claude_code"]
stale_data
Labor, material, and escalation references drift; CTC quality depends on freshness.
Overlay governs materiality of CTC variance and triggers for executive review.
Recomputes cost-to-complete from current actuals plus remaining scope plus overlay-derived
escalation and contingency. Compares against prior CTC and the underwriting baseline.
Identifies the driver (labor, material, scope, duration) and recommends remediation
(re-estimate, scope trim, re-bid, contingency pull).
Cost-to-Complete Review
Workflow purpose
Build an accurate, transparent cost-to-complete at any point in the project. Trigger remediation when CTC deviates from plan.
Trigger conditions
Explicit: "run CTC", "cost-to-complete refresh", "pressure-test the remaining budget".
Implicit:workflows/draw_package_review finds CTC drift; workflows/change_order_review produces material cost delta; milestone slippage from schedule.
Recurring: monthly per active project; re-run when a CO is reviewed.
Inherit cost to date. From most recent draw or GL.
Compute remaining cost. Remaining scope x unit costs from library; market-adjust via labor/material references; apply escalation per overlay to expected execution dates per schedule.
Apply contingency. Remaining scope contingency per overlay.
Delta vs. prior CTC. Attribute to labor, material, scope, duration, CO.
Scenario set. Base, upside (favorable buyouts, scope value engineering), downside (labor shortage, material spike, additional COs).
Recommendation. If CTC within overlay, monitor. If above threshold, recommend remediation: re-estimate, scope trim, re-bid, contingency pull. Any budget reallocation above threshold opens approval.